最新高一化学必修二知识点总结可发给学生高三复习优秀名师资料.doc
《最新高一化学必修二知识点总结可发给学生高三复习优秀名师资料.doc》由会员分享,可在线阅读,更多相关《最新高一化学必修二知识点总结可发给学生高三复习优秀名师资料.doc(22页珍藏版)》请在三一文库上搜索。
1、高一化学必修二知识点总结(可发给学生高三复习)? ? 1. ,? ? 2. ? ?1? A. ? B. ,? C. ? D. ?8?,? E. ? ?2? A. ? a. ? b. ? c. ?,? ? B. ? a. ? b. ? c. ? d. ? C. ? D. ? a. , b. , c. ? ?3? A. ? a. ,? b. ,? c. ?,? B. ? 3. ? ?1? A. ? B. ? C. ? ?AB? A2B?AB2? NaOH?Na2O2?NH4Cl?O22-?NH4+? ?2? A. ? B. ? C. ? ?NH3?CH4?CO2?HClO?H2O2? D ? ?3
2、? ? ? 1. ? ?1?,? ?2? a. ? ? b. ? ? backfill material to the surface, and 1:100 slope drainage to gutters. Gutter width 0.5M depth 0.5m,M5 grouted rubble masonry. 9.2 main engineering content this standard pressure pipe and the metal structure installation part main including Yunnan province tengchon
3、g County yongxing River primary and secondary hydropower station in the of pressure pipe and the power station metal structure, which level power station pressure pipe total about 562t (containing annex); II level power station pressure pipe about 733 t (containing annex); level power station metal
4、structure about 52.5 t, containing discharge Gate 2 hole, rushed sand Gate 1 hole, water mouth work door and the stopped dirt gate the 1 hole, Qian pool work door and the stopped dirt gate the 1 hole; Secondary power station metal junction at about 19.5 t, containing sand Gate 1 hole, water inlet wa
5、ter gate and trash the 1 hole; their auxiliary hoist equipment and electrical equipment. Concrete pressure pipe, gate, trash and hoisting device project property list 1-11-3. Table 1-1 the main characteristics of the penstock number item parameter type controller size head a long pipe diameter pipe
6、length 11 hydropower station penstock open-air exposed pipe, single pipe joint water supply 1.3M 931m 0.8M 8.3*2m 22 hydropower station penstock open-air exposed pipe, single pipe joint water supply 1.4m 1063.506 m 0.8M 10*2m table 1-2 hydropower station Main characteristics of hydraulic metal struc
7、ture number project name gate, trash ?3? ?4? A. ? B. ? C. ? D. ? E. ? ?5? A. ? ? ?6? A. ?1mol H2O? 2. ? ?1?,? A. ? B. ?,? a. ? b. ?,? C. ,? ? ?,?,? a. ? b. ? c. ? D. ,? a. ? b. ? E. ? a. ? b. ,? ? c. ,? F. ,? a. ?X?,ne?Xn?, b. ?,? ?2?,? ?,? A. ? B. ? C. ? ?3? A. ?,? B. ? a. ? b. ? c. ? ? ?4? backfil
8、l material to the surface, and 1:100 slope drainage to gutters. Gutter width 0.5M depth 0.5m,M5 grouted rubble masonry. 9.2 main engineering content this standard pressure pipe and the metal structure installation part main including Yunnan province tengchong County yongxing River primary and second
9、ary hydropower station in the of pressure pipe and the power station metal structure, which level power station pressure pipe total about 562t (containing annex); II level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing dischar
10、ge Gate 2 hole, rushed sand Gate 1 hole, water mouth work door and the stopped dirt gate the 1 hole, Qian pool work door and the stopped dirt gate the 1 hole; Secondary power station metal junction at about 19.5 t, containing sand Gate 1 hole, water inlet water gate and trash the 1 hole; their auxil
11、iary hoist equipment and electrical equipment. Concrete pressure pipe, gate, trash and hoisting device project property list 1-11-3. Table 1-1 the main characteristics of the penstock number item parameter type controller size head a long pipe diameter pipe length 11 hydropower station penstock open
12、-air exposed pipe, single pipe joint water supply 1.3M 931m 0.8M 8.3*2m 22 hydropower station penstock open-air exposed pipe, single pipe joint water supply 1.4m 1063.506 m 0.8M 10*2m table 1-2 hydropower station Main characteristics of hydraulic metal structure number project name gate, trash A. ?
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 最新 高一化学 必修 知识点 总结 发给 学生 复习 优秀 名师 资料
链接地址:https://www.31doc.com/p-1435569.html