卫辉窑墩CFG桩施工组织设计.doc
《卫辉窑墩CFG桩施工组织设计.doc》由会员分享,可在线阅读,更多相关《卫辉窑墩CFG桩施工组织设计.doc(10页珍藏版)》请在三一文库上搜索。
1、yuan, an increase of 17.5%; local government general budget revenue of 500 million Yuan, . Painting, model culture creates new Ma Church community, creating Lake scenic spot culture education base, received high evaluation from provincial and municipal discipline Inspection Commission, the peoples d
2、aily special report. Constantly promote independent Commission against corruption culture construction to rural extends, created established Dahlin rural industry Park independent Commission against corruption culture positions, formed has a support service low double excellent of members lead team,
3、 constantly perfect and established Park funds assets management, and village audit supervision, and villagers democratic financial, system, strengthening Park party, and Chief, and financial, full public, powerful to guarantees has new rural construction, by city rural style clean government inspec
4、tion unit led of height evaluation. Through the implementation of honest and clean government cultural construction, and effectively educate the broad masses of party members and cadres and consciously regulated behavior and discipline, honesty in politics and culture to create a good atmosphere and
5、 fresh development environment. Although we in implement implementation independent Commission against corruption guidelines aspects made has must effectiveness, but away from superior of requirements also exists must of distance, main performance for: a is system enough sound, education, and superv
6、ision, and prevention, and punishment, aspects long-term mechanism also enough perfect, especially in enrollment bid work regulatory aspects also needed strengthening; II is regulatory supervision exists lost of Yu wide, and lost of Yu soft, investigation illegal disciplinary case of efforts also ne
7、eded strengthening, individual sector and cadres also different degree exists treat gift, not to benefits not do, and mess do of phenomenon; Three for honest work is the new situations and new problems in finding timely enough, treatment measures are not strong enough. To solve these problems, we wi
8、ll proceed from the following five aspects of rectification, make sure to implement the provisions of the code. (A) deepening the learning, enhance the consciousness of honesty in politics. To create event as an opportunity to Excel and learning party, further increasing the governance capability an
9、d advanced construction, reinforced rules of the broad masses of party members and cadres awareness, sense of responsibility, sense of honor, improve working ability and level of scientific development. Should make full use of meetings, in particular central group learning opportunity, further stren
10、gthening the study and education of the code, the intensive warning education, education the majority of party members and cadres known fear, knew fear, honesty in politics of tension the strings, consciousness and enhancing the implementation of the initiative. Also, pay attention to apply what the
11、y have learned, consciously study results into planning work, new ideas,天瑞卫辉水泥生产基地一期工程(5000t/d)CFG桩施 工 组 织 设 计库号:GE262总 工 程 师:主 任 工 程 师:项 目 经 理:工程技术负责人:冶金工业部勘察研究总院岩土地基公司2003年7月1日目 录1、施工组织设计编制依据2、工程概况3、工程地质及水文地质条件4、资源配置5、现场施工平面布置6、施工程序7、施工方法和质量要求8、工期进度计划9、质量保证措施10、安全生产、文明施工 1、施工组织设计编制依据 1.1天瑞工程水泥生产基地
12、一期工程(5000t/d)CFG桩平面布置图。1.2 天瑞卫辉水泥生产基地一期工程(5000t/d)详细勘察阶段岩土工程勘察报告书。 1.3 建筑基础处理技术规范(JGJ79-2002;J220-2002)。2、工程概况天瑞卫辉水泥生产基地一期工程(5000t/d),位于河南省卫辉市境内,距卫辉市约4.0公里,场址东侧为化工厂,西侧是郭全屯村,北侧是八里屯村,场区东面有京广铁路、京珠高速公路和107国道通过,交通便利。烧成窑中1-3#墩位于主生产线上,由于天然地基不能满足设计要求,我院受河南天瑞集团卫辉水泥厂委托,对对该场地建筑物基础处理进行技术、经济方案的论证,最终确定采用400螺旋压灌CF
13、G桩复合地基,CFG桩体强度采用C10。本工程由天津水泥工业设计院设计,因此CFG桩的长度、数量由单个建筑基础尺寸及埋深确定。3、 工程地质及水文地质条件 根据勘察报告,烧成窑中1-3#墩基础的主要地层及特征为:粉质粘土(Q2al+pl):褐黄灰褐色,层厚0.50-2.80米,坚硬状态。粉质粘土(Q2al+pl):浅灰黄褐色,层厚0.50-3.30米,硬塑状态。粉质褐黄色,层厚0.50-4.10米,中密-密实状态。粉质粘土(Q2al+pl):黄褐色,层厚1.60-12.10米,可塑-硬塑状态。卵石(Q2al+pl):一般粒径20-40mm,层厚0.50-1.70米,中密状态。粘土(黄褐色,层厚
14、0.50-7.60米,硬塑状态。圆砾Q2al+pl):一般粒径5-15mm,层厚1.10-8.20米,中密状态。泥灰岩(N1):灰白色,较软岩,最大揭露厚度6.80米。本次设计螺旋压灌CFG桩,桩尖持力层为第层卵石或为第层圆砾;地下水位于第层粉质粘土,据勘察报告结论,场内地下水对砼无侵蚀性。 4、资源配置 根据设计要求和地质条件及业主的需要,确保工程能够按期、优质、安全的完成,我公司将从人员、设备器材等方面合理调配,满足施工需要。 4.1 项目经理部组织机构及人员配置 4.1.1 项目部下设技术组、质检组、施工组、安全组、后勤组。技术组负责该工程的技术管理工作;质检组对施工机组的施工质量及作业
15、程序进行全方位检查;施工组负责机台,全面履行施工组织设计中规定的施工程序,质量标准的执行;安全组应对施工现场的机械、电力系统、人员的正常施工负主要责任;后勤组的主要工作是为生产服务,为生产一线解决后顾之忧。 4.1.2 人员配置:本工程设项目经理1人,工程技术负责人1人,技术员2人,技术工人10人,壮工20人,总计34人。 4.2 主要施工设备配置序号设备名称型号数量用途1长螺旋钻机ZKL800A1成孔2强制式砼搅拌机JS7501搅拌砼3砼输送泵HBT40A1泵送砼4磅秤2计量5小推车若干砂石料运输6泵送导管若干米输送砼7电焊机1维修设备8客货车1现场运输5、现场平面布置根据现场的实际情况进行
16、优化布置,生活区、办公区距施工场地最近,砼搅拌站位于三个墩基础的中间部位,距最远处的桩点距离不宜大于50米,所有机械设备、人员进入施工现场后,根据现场情况再布置,平面的布置图在现场确定。6、施工程序6.1 施工准备落实现场的施工条件,解决“三通一平”,先期进行砼配合比的试配工作,检修设备,合理调配人力,编制施工组织设计及审批等,各种施工材料、设备、人员进入施工现场,施工材料送检。6.2 开工报告当一切施工条件具备,呈报开工报告,请业主及监理单位批准正式开工。6.3 测量放线根据业主提供的已知坐标点和基础坐标点,测放各桩位点并作保护。6.4 设备就位成孔机械对准桩位,砼搅拌机、砼输送泵就位,连接
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 卫辉 CFG 施工组织设计
链接地址:https://www.31doc.com/p-2029576.html