a隧道盾构法施工应急预案.doc
《a隧道盾构法施工应急预案.doc》由会员分享,可在线阅读,更多相关《a隧道盾构法施工应急预案.doc(45页珍藏版)》请在三一文库上搜索。
1、do a colleagues and friends respect of people, do a relatives children can proud of people, do a recalled life can conscience of people, real in construction rich civilization harmony happiness new * in the dang good pioneer, and made example, for promote * development, and Benefits * people make ne
2、w and greater contributions! today, I would say this, say wrong place, please comment. Thank you very much! Center hospitals 2015 summary and the 2016 work plans a, and 2015 summary 2015, I hospital seriously implement XI series important speech spirit for guide, around week Secretary in County Heal
3、th workshop Shang speech and the County Health Council annual responsibility target carried out work, conform to healthcare new requirements, by medical rules, and public principles, and market guidelines guide health work, in improved medical service Shang effort, and first to, further innovation m
4、edical and public health service mode, the work ordered for , Are summarized as follows: 1, strength, strong base, strengthen management to realize the two civilizations new span, promoting stable development of hospital work. the work of attracting attention to investment information gathering, and
5、 valuable investment information article 6, in order to meet the customers mind, accompany customers to review, and in close contact with the Shenzhen company. In conjunction with the Bureau in Xiamen, Fujian, and Zhejiang provinces and active investment. B tie two big created, upgrade hospital mana
6、gement level Active tie County national health County, and national ecological County created, held has mobilization will, established has the created work led group, clear Dean for the created work first responsibility people, is in charge of led and main responsibility people, and assist personnel
7、 accountability of organization schema, developed has specific implementation measures, on created implemented has at any time track. Signed was rejected by the red envelopes undertaking. To strengthen style construction and requires all medical personnel to unity of thinking, and actively carry out
8、 criticism and self-to carry out self-examination and self-correction, in view of the existing problems, to do one corrective action and learn the lessons. Establish the total time on duty zhagang system, strengthened the supervision of hospital personnel work discipline and style. 2, the use of hea
9、lth care new opportunities, explore new path for health care reform, implementation of the new service concept, facilitating medical recovery, achieving people crossing. , deepen the reform, pay attention to personnel training, improve the level of management. First, according to our business develo
10、pment and operational needs, exploring the implementation of Department Directors, five leaders, four members of the Hospital Authority, leadership management, and a democratic assessment every six months. Secondly, strengthen training, improve the quality of health care personnel. Send learning 2,
11、participate in the provincial class 1 anti aging medicine people, grass-roots management training course, in Jiangsu Province, 2 people, sent a variety of short courses, general practitioner training 50 people, 90 passengers participate in continuing medical education, in Jiangsu Province, the secon
12、d batch of excellent rural TCM training project training 1. Leaders lead organization hospital leading group, part of the heads of departments to view of township Center Hospital in Huaian fish channel, huaiyin district model learning, with emphasis on 武汉地铁四号线五标盾构施工应急预案武汉市轨道交通四号线一期工程区间及车站土建施工 第五标段工程
13、(安全专项)盾构施工应急预案腾达建设集团股份有限公司武汉轨道交通四号线一期工程第五标段工程项目部2011年08月 一、工程概述31、风险管理制度及方法82、风险管理关键步骤93、成立工程意外、紧急情况下的应急处理领导小组104、突发事件风险分析及措施要求12二、 应急预案分析及实施121、工伤应急救援预案142、消防应急预案153、触电急救预案164、防汛防台预案185、公用管线及建筑物保护预案226、劳动保护职业卫生防疫预案227、盾构始发接收质量安全问题的应急处理247.1、凿除钢筋混凝土封门产生涌土247.2、盾构始发时洞口土体大量流失257.3、洞门漏水268、盾构掘进过程中质量安全问
14、题的应急处理268.1、土压平衡式盾构正面阻力过大268.2、土压平衡盾构螺旋机出土不畅278.3、盾构后退288.4、盾尾密封装置泄漏289、盾构机械设备问题的应急预案299.1、盾构推进系统无法动作299.2、皮带运输机打滑3010、隧道压浆质量问题处理措施3110.1、沿隧道轴线地层变形量过大3110.2、同步注浆浆管堵塞3211、管片拼装质量安全问题的应急处理3211.1、圆环管片环面不平整3211.2、错缝拼装管片碎裂3311.3、管片环高差过大3411.4、管片椭圆度过大3512、管片防水质量问题的应急预案3612.1、管片压浆孔渗漏3612.2、管片接缝渗漏3613、针对隧道渗漏
15、水的技术措施3713.1、渗漏水的预防3713.2、渗漏水处理3814、 隧道不明气体应急方案3915、隧道上浮解决措施4116、排水泵房施工应急方案42一、工程概述工程名称:武汉市轨道交通四号线一期工程区间及车站土建施工第五标段工程(工业路站园林路站罗家港站)区间隧道工程建设单位:武汉地铁集团有限公司设计单位:中铁第四勘察设计院集团有限公司与武汉市政工程设计研究院有限责任公司联合体勘查单位:机械工业第三勘查设计研究院监理单位:北京赛瑞斯国际工程咨询有限公司北京东方华太建设监理有限公司联合体施工单位:腾达建设集团股份有限公司本工程位于武汉市青山区与洪山区,起点于和平村的罗家港、终点于武丰村的工
16、业路。工作内容主要为二个区间和二个车站,包括:园林路站罗家港站区间、园林路站工业路站区间的隧道及联络通道(兼泵站)。园林路站、工业路站的主体结构均为两层的岛式结构;园林路站有10个出入口(其中6个为物业管理出入口)、工业路站有4个出入口,两个车站均设置配套的风井等土建工程。0该工程桩号为CK23+903.058CK26+280.093,总长度约为2.377公里;园林路站桩号为CK24+750.525-CK25+215.625,计长度为465.1米;工业路站桩号为CK26+090.950CK26+280.093,计189.143米;罗园区间桩号为CK23+903.058CK24+750.525-
17、,计长度为847.467米;园工区间桩号为CK25+215.625- CK26+090.950,计长度为875.325米。园林路站位于武汉市青山区,武青四干道与园林路交叉口下,车站四周为未开发的农田和鱼塘。工业路站位于武汉市青山区、洪山区,武青四干道与工业路的交汇处,车站南侧为民房,西北侧为农田菜地,东北侧为新建2层商业门面店,其余周边大多为农田和鱼塘;目前工业路已经通车,武青四干道暂未通车。本工程区间地表有民房、简易厂房布置。(详见区间监测方案)在施工过程中难免有不可预见的因素,影响工程的安全。故在施工过程中,除了在现实的工程环境和条件下,很好地满足规定的技术、经济指标外,还必须预测施工风险
18、,并将预防、消除风险放在工程管理的首位,制定各项应急预案来防范风险,严格控制施工风险。(1) 盾构隧道突发事件风险分析:序号事件项目事件部位具体表现及造成事件突发的原因分析与解决办法1盾构进场阶段不安全因素隧道工作井内1、洞门凿除中大量的交叉作业所带来的事故隐患;(尽量避免同时施工)2、在盾构顶部作业,在盾构外弧两侧及正面搭设脚手架不规范;(必须按照规范搭设脚手架)3、安装袜套高处作业的隐患;(高空作业必须捆绑安全带)4、工程起始阶段上下安全通道未健全存在安全事故隐患(前期工作搭设扶梯必须符合临时扶梯安全规范)2垂直水平运输系统不安全因素隧道井内1、起重的制动装置未能正常抛刹,造成物体坠落;(
19、起重作业检查机械状态,配备有操作证司机起重)2、起重运行系统滑轮片、平衡轮不能正常运行,造成滑轮倾斜、钢丝绳滑槽断裂;(起重作业前必须检查设备完好性,方可操作)3、卸扣及钢丝绳使用过程中的损坏和超负载使用;(不符合安全使用的立即更换)4、吊运物件的捆绑不牢固;(起重工必须持证上岗,按照规程操作)5、电机车严重磨损,造成电机车在快速行驶中的出轨事故(机修工必须日常检查,避免事情发生)3管片拼装作业不安全因素盾构内1、举重臂制动装置突然失控;(立即按住紧急停止按钮,机修工立即维修)2、管片拼装专用销未能到位,导致管片在旋转过程中坠落;(拼装作业必须使用专用销,不然禁止作业)3、拼装平台的防护栏杆不
20、健全;(在不健全的情况下,禁止作业,待修复好了在作业)4、人员在高处无保护措施的情况下悬空在隧道上部进行拼装作业(高空作业时必须绑安全带)4隧道井下作业环境的危害隧道内1、盾构工作面的温度高居在38C以上;(及时通风)2、隧道工作面的湿度超过90;(通风降湿)3、隧道工作面的含氧量不足;(通风补氧)4、大量电焊作业所造成的烟雾污空气 (避免洞内电焊作业)5施工用电不安全因素地面、井下1、大量高压配电柜的布置,引起管理力量的不足;(配电柜必须符合规划布线)2、用电作业点多,造成用电的隐患;(用电作业点多时,必须有电工在旁施工,防止安全隐患)3、外接电源损坏;(及时更换)4、电源跳闸;(检查线路是
21、否有问题,如有问题及时更换)5、保险丝烧坏;(及时更换)6、其它原因6施工机械不安全因素地面、井下1、对大型设备安装单位监控不力所带来的隐患;(监督安装单位施工)2、未能做到定人、定机所带来的隐患;(必须配备足够的人员,定位监督)3、对大中型设备的例保、维修工作不到位所带来的隐患(配备专人日常检查,保养。)(2) 盾构隧道工程各关键部位和工序常见的风险因素和危害序序号施工工序或部位常 见 风 险 因 素危害类型工程安全人身安全建筑物和管线安全交通安全121145盾构始发接收盾构基座变形,使盾构掘进轴线偏离设计轴线加固质量或效果不佳,导致洞门混凝土凿除时坍方,影响工程及人身安全洞口密封装置安装质
22、量不佳,导致渗漏,严重者可导致坍方后盾支撑系统或基座设计不牢靠或加工质量控制不严,导致在盾构就位或推进时损坏盾构接收过程中夹住管片,造成洞口管片破碎开裂;678912正常段掘进施工同步注浆不足,引起地面沉降参数设置不当,相关参数不匹配,致使产生超挖或欠挖,引起地面沉降或隆起盾尾发生渗漏,引起地面沉降正面阻力过大造成盾构推进困难和地面隆起变形螺旋机螺杆形成“土棍”,螺旋机无法出土,或螺旋机内形成阻塞,负荷增大,电动机无法带动螺旋机转动,不能出土盾构掘进过程中,盾构推进轴线过量偏离隧道设计轴线,影响成环管片的轴线盾构停止推进,拼装管片时,有后退的现象,使开挖面压力下降,地面产生下沉变形地下水、泥及
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 隧道 盾构 施工 应急 预案
链接地址:https://www.31doc.com/p-2033921.html