《施工技术归档资料模板.doc》由会员分享,可在线阅读,更多相关《施工技术归档资料模板.doc(125页珍藏版)》请在三一文库上搜索。
1、especificaci tcnica JTJ034-2000 lespecificaci, prova de Proportioning segons els requeriments de disseny i complir els requisits de disseny abans de construcci es pot utilitzar. Estricte control de graduada fora crua triturada, valor, ndex drid 0,5 mm de tela fina com el plstic. Gra escatosa a lndex
2、 de contingut en lmbit especificat, mentre net agregat dagregat. (2) el control estricte dels nivells graduada de composici agregat. 9.4.3.2 mtode de construcci de (1): macadam pavimentaci barreja ha dutilitzar una gran construcci mecnica, equips, equipament de transport, material de pavimentaci i a
3、ltres rodets carretera normal de requisits de construcci del projecte. (2) ingredients: un control estricte de qualitat grava, tot nivell. Preguem a travs de capes. (6) la difusi de qualificar a base de pedra triturada. Difusi de la mquina. Graduada pedra trencada pavimentaci en lnia dos paviments m
4、quines per permetre luniforme complet per pedra triturada graduada per a paviments i anivellament, desprs de compactar el gruix de la base. Divisi de paviment. Per alleujar la segregaci, carretera classificava trencat pedra s 12,5 m (amb costat pedres ampliat), control de mquina de estenedora ABG423
5、 2 a 6 m, doble mquina botiga, dues pavimentaci de calades. Quan dobla mquina botiga, estenent un estricte control dambdues parts abans delevaci, desprs de lexterior amb elevaci de control del filferro corda, pel qual sa linterior del pat coix control de nivell nivell, dos superposici estenedora pav
6、imentaci 20-30cm, abans i desprs el mantenir dos 20-30m. Hbrid carrils installats capacitat s de 8M, fer un paviment de calada. Elements de paviment. Materials de pavimentaci quan segregaci i personal designat per mantenir leliminaci de la segregaci agregat fina i gruixuda. Pavimentaci de control de
7、 velocitat a 2,5-3M/min. En construcci, coeficient de solta aplanant per 1.2. Abans de paviments, primer comprovar el substrat, pendent, alat, secci, assegurar que els requisits, al mateix temps, davant el paviment sobre el terreny, polvoritzaci daigua sobre el substrat, la part superior subjacent m
8、antenen la humitat adequada. Per reduir la segregaci, garantit la planitud segons la situaci actual, la construcci, per evitar la segregaci de la barreja a la falda de pavimentada dasfalt, barreja a m amb una segregaci b material, mantenir sempre les llambordes al paviment no perdr procs barreja-los
9、 tots en la tremuja. (7) el laminat: pressi esttica: corr vibratori esttica 20T 1 vegades. Pneumtics: LTP2030 goma dels pneumtics vibraci corr RCC 1 vegades: compactaci vibratori terra esttica de 3 - 5 vegades (freqncia desprs de la primera freqncia alta): terra esttica vibraci carretera corr 1-2, p
10、neumtics: patins de rodes de goma de LTP2030 RCC 1 vegades quan va rodar, directament des de lespatlla a banda i banda per centre mlta de caixa de la carretera, lateral segments de corba deIn order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property)
11、 is not lost, to prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions, make the management system. 1, the principal is the responsibility of school safety, school security under the
12、 leadership of President security work leading group. The head teacher to the leadership team is responsible for, implementation of the accountability system. 2, school monthly student knowledge about safety education, education should be diversified in the form every safety education for students o
13、f classes per week should be targeted. To carry on emergency issues dealing with education in General, self-help and mutual rescue knowledge. Emergency calls (such as 110, 119, 122, 120, and so on) use common sense in education. 3, the establishment of major accident reporting system. School student
14、s report major accident within an hour of education; student run and disappearances to report; report of the accident to a written report in triplicate, a correctional centre, a police station, a township peoples Government shall not conceal the accident. 4 week, teachers are on duty system, establi
15、sh and improve the leadership values; strengthen the education, management of teaching activities in schools to ensure normal teaching order; responsible for school safety leadership always maintained close contact and district police stations, canvassing support from the police station on school sa
16、fety and help. 5, strengthening teachers moral education, establish a dedicated love, improving education quality, observe the students psychological changes at any time and take preventive measures, no corporal punishment and covert corporal punishment on students, student out of the classroom, sch
17、ools may not be. 6, units or departments use student Street propaganda or participate in the celebrations, as well as participating in other social work, without approval of the Correctional Centre, school principals consent, without organization. Without the approval of relevant departments, may or
18、ganize students to participate in fire fighting, disaster relief and so on. 7, schools should educate students to obey the school rules and regulations, on time, on time home to prevent accidents. 8, school to school inspections on a regular basis, found hidden in time, and in severe cases, it is ha
19、rd to eliminate immediately closed, and reported to the local peoples Government, education, and rule of law section. 9, the school should always check the internal walls, retaining walls, ponds, railings, handrails, doors, Windows, staircases and a variety of sports, extracurricular activities, fac
20、ilities such as fire safety, infrastructure security, unsafe facility to immediately repair and demolition to ensure that teachers and students work, learn, live venues and facilities are safe and reliable. Song Lin Xiang Liu Jia ping elementary school March 2016 song Lin Xiang Liu Jia ping primary
21、school fire safety systems to enhance fire safety, protection of public property and the life and property safety of teachers and students, school fire safety into day-to-day management, is developing the following fire safety system. 1, strengthen fire safety education of the whole school. Accordin
22、g to the requirements of the Fire Services Act, so that everyone has of keeping fire control safety, protecting fire control facilities, fire prevention, reports of fire案号: 矿 建 单位工程施 工 技 术 归 档 资 料第 卷编制单位: 编制日期: 密 级: 保存期限: 共 卷 第 卷矿建单位工程施工技术资料组卷目录及表式质量管理资料一、开工准备阶段技术文件 质管矿11、开工报告质管矿1-12、设计交底、图纸会审记录质管矿1
23、-23、技术(安全)交底记录质管矿1-34、单位工程质量监督注册申报表质管矿1-4二、单位工程竣工质量验收资料 质管矿21、单位工程质量等级认证书质管矿2-12、监理单位工程质量评估报告质管矿2-23、设计单位工程质量检查报告质管矿2-34、单位工程竣工报告质管矿2-45、单位工程竣工验收证书质管矿2-56、单位工程质量检验综合评定表质管矿2-67、单位工程质量保证资料检查评级表质管矿2-78、单位工程观感质量评定表质管矿2-89、分部工程质量评定汇总表质管矿2-9三、工程测量记录 质管矿31、工程定位测量及复测记录质管矿3-12、工程施工测量记录质管矿3-2四、各种通知、记录及质量处理结果资
24、料 质管矿41、监理工程师通知单及回复单质管矿4-12、建设单位通知、指令、认定记录及处理资料质管矿4-2质量保证资料1、 钢材出厂合格证(含贴条) 质保矿12、 钢材力学试验报告 质管矿23、 焊条(剂)合格证 质管矿.34、 焊接 (螺纹套筒连接)试验报告质管矿45、 水泥出厂合格证和出厂检验报告(含贴条) 质管矿.56、 水泥试验报告 质管矿.67、 砖、砌块、料石出厂合格证 质管矿78、 砖、砌块、料石力学试验报告 质管矿.89、 砂子试验报告 质管矿.910、碎石试验报告 质保矿1011、外加剂出厂合格证和出厂检验报告(含贴条) 质保矿.1112、外加剂试验报告 质保矿1213、防水
25、材料出厂合格证 质保矿.1314、防水材料试验报告 质保矿1415、构件合格证 质保矿.1516、混凝土试块力学试验报告和见证取样证明 质保矿1617、混凝土抗渗试验报告 质保矿1718、商品混凝土出厂合格证 质保矿.1819、混凝土试块强度统计评定表 质保矿1920、喷射砼强度试验报告 质保矿2021、砂浆试块力学实验报告 质保矿.2122、砂浆试块强度统计评定表 质保矿.2223、隐蔽工程检查验收记录 质保矿.2324、施工组织设计、作业规程、技术措施 质保矿2425、砼用水PH值化验质保矿.2526、混凝土配合比通知单 质保矿2627、砂浆配合比通知单 质保矿2728、锚杆锚索锚固剂出厂
26、合格证和煤安标志 质保矿229、锚杆锚索锚固剂试验报告 质保矿.2930、锚杆抗拔力检测记录 质保矿3031、防火、防水、防爆等各种门出厂合格证 质保矿3132、井筒漏水量实测记录 质保矿3233、施工及质量自检记录 质保矿3334、分部工程质量检验评定表 质保矿3435、分项工程质量检验评定表 质保矿3536、工程质量事故报告 质保矿3637、工程质量事故处理记录 质保矿.3738、实测设备基础图 质保矿3839、检查钻孔地质报告 质保矿3940、地质预测和综合分析报告 质保矿.4041、主要巷道、硐室地质剖面素描图或井筒实测柱状图 质保矿.4142、施工图 质保矿.4243、设计变更通知单
27、 质保矿.4344、竣工图 质保矿.44质量管理资料工程名称: 施工单位: 质管矿.1质量管理资料一、开工准备阶段技术文件工程名称: 施工单位: 一、开工准备阶段技术文件资料目录序号资料编号资料名称份数/页数备注1质管矿NO.1-1开工报告2质管矿NO.1-2设计交底、图纸会审记录3质管矿NO.1-3技术(安全)交底资料4质管矿NO.1-4单位工程质量监督注册申报表5678910111213质管矿.1-1质量管理资料一、开工准备阶段技术文件1、开工报告工程名称: 施工单位: 质管矿.1-1-1开工报告单项工程名称工 程 地 点单位工程名称单位工程编号计划开工日期实际开工日期施工单位名称工 程
28、造 价工程简要内容及工程量简要内容:开工准备工作就绪,已具备了开工条件。施工单位:(公章) 年 月 日监理单位:(公章) 年 月 日建设单位:(公章) 年 月 日质管矿.1-2质量管理资料一、开工准备阶段技术文件2、设计交底、图纸会审记录工程名称: 施工单位: 质管矿.1-2-1设计交底、图纸会审记录单位工程名称主持单位负责人参加单位及人员建设单位:设计单位:监理单位:施工单位:图纸名称及编号存在问题及意见解决意见设计单位:(签章) 年 月 日建设单位:(签章) 年 月 日监理单位:(签章) 年 月 日施工单位:(签章) 年 月 日质管矿.1-3 质量管理资料一、开工准备阶段技术文件3、 技术
29、(安全)交底记录工程名称: 施工单位: 质管矿.1-3-1技术(安全)交底记录单位工程名称 分部工程名称分项工程名称交 底 内 容说明:交底人: 年 月 日接受人: 年 月 日质管矿.1-4 质量管理资料一、开工准备阶段技术文件4、单位工程质量监督注册申报表工程名称: 施工单位: 质管矿.1-4-1单位工程质量监督注册申报表工程名称工程地址建设单位设计规模设计概算 万元, 其中: 建安工作量: 万元开工日期年 月 日计划建设工期 个月工程概况:主要参建施工单位资质等级资质等级资质等级资质等级主 要参建勘察设计单位资质等级资质等级资质等级主要参建监理单位资质等级资质等级主要检测单位资质等级项目负
30、责人: 电 话:申报单位:(盖 章) 年 月 日质管矿NO. 2质量管理资料二、单位工程竣工验收资料工程名称: 施工单位: 二、单位工程竣工质量验收资料目录序号资料编号资料名称份数/页数备注1质管矿NO. 2-1单位工程质量等级认证书/2质管矿NO. 2-2监理单位工程质量评估报告/3质管矿NO. 2-3设计单位工程质量检查报告/4质管矿NO.2-4单位工程竣工报告/5质管矿NO.2-5单位工程竣工验收证书/6质管矿NO. 2-6单位工程质量检验综合评定表/7质管矿NO. 2-7单位工程质量保证资料评级表/8质管矿NO. 2-8-1单位工程观感质量检验评定表立井井筒/9质管矿NO. 2-8-2
31、单位工程观感质量检验评定表斜井(巷)、平峒、井底车场、主要运输巷道(石门、总回风巷)/10质管矿NO. 2-8-3单位工程观感质量检验评定表主要硐室/11质管矿NO. 2-8-4单位工程观感质量检验评定表主要运输线路铺轨12质管矿NO. 2-9分部工程质量评定汇总表/质管矿No.2-1质量管理资料三、单位工程竣工质量验收资料1、单位工程质量等级认证书工程名称: 施工单位: 质管矿NO. 2-1煤 炭 工 业 建 设 工 程单 位 工 程 质 量认 证 书单项工程名称: 单位工程名称: 工 程 类 别: 工 程 性 质: 认 证 等 级: 工程质量监督站 年 月 日单位工程名称资金来源建设单位项
32、目负责人勘察单位资质项目负责人设计单位资质工地代表施工单位资质施工负责人监理单位资质总监理工程师检测单位资质负责人设计工程量完成工程量计划工作量完成工作量开工日期竣工日期工程内容及技术特征:各方责任主体质量行为(结合日常监督)情况:质量核查结果:1、分部工程共 分部,合格 分部,优良 分部,优良率 %,指定分部质量等级 。2、质量控制(保证)资料共 项,基本齐全 项,齐全完整 项。 3、质量观感评分,应得 分,实得 分,得分率 %。工程质量认证等级 。认证意见:总工程师审核: 站长签发:认证组人员(签名) 工程质量监督站(公章) 年 月 日 组长: -成员: 注:此表由矿区工程质量监督站填写1
33、.本认证书一式3份,质监站存档1份、发给建设、施工单位各1份。2.工程类别:填矿建、土建或机电安装。3.工程性质:填主要单位工程或一般单位工程。质管矿No.2-2质量管理资料二、 单位工程竣工质量验收资料2、监理单位工程质量评估报告工程名称: 施工单位: 质管矿No.2-2-1监理单位工程质量评估报告单位工程名称监理单位名称监理单位地址监理单位邮编联系电话 1、监理单位质量责任行为的履行情况:2、监理单位执行工程监理规范的情况:3、在施工过程中,执行国家有关法律、法规、强制性标准、条文和设计文件承包合同的情况:4、施工过程中签发的“监理工程师通知单”,“监理工程师通知单回复单”及监督机构签发的
34、“质量问题整改通知单”,施工单位按要求按时限落实整改情况:5、对质量等级的核定情况:6、对工程遗留质量缺陷的处理意见: 7、执行旁站、巡视平行检查监理形式的情况:8、其它需要说明的情况:总监理工程师: 年 月 日监理单位公章监理单位技术负责人: 年 月 日监理单位法人代表: 年 月 日质管矿No.2-3 质量管理资料二、 单位工程竣工质量验收资料3、设计单位工程质量检查报告工程名称: 施工单位: 质管矿No.2-3-1设计单位工程质量检查报告单位工程名称设计单位名称设计单位地址设计单位邮编联系电话设计合理使用年限质量验收意见:1、 通过现场全面检查,工程质量是否满足设计文件的要求,是否体现设计
35、意图,是否认可施工单位的自评意见。2、 本工程是否依法进行设计,是否根据批准的矿井地质勘探报告资料进行设计的。3、本工程是否按强制性标准和强制性条文进行工程设计。4、在施工过程中,设计单位签发的设计文件(包括设计变更通知单和技术核定单等)是否符合国家规范、强制性标准要求,实体质量是否与设计文件相符。5、在施工过程中,是否发现结构性的质量缺陷。6、本工程是否完成工程设计文件要求的各项内容。项目负责人: 年 月 日设计单位公章单位技术负责人: 年 月 日单位法人代表: 年 月 日质管矿No.2-4 质量管理资料二、单位工程竣工质量验收资料4、单位工程竣工报告工程名称: 施工单位: 质管矿No.2-4-1单位工程竣工报告单位工程名称 工程地点建设单位支护类型工作量工程量计划开工日期实际开工日期计划竣工日期实际竣工日期工期是否延期及延期原因:竣工条件说明:施工单位: 日 期: 年 月 日质管矿No.2-5 质量管理资料二、单位工程竣工质量验收资料5、单位工程竣工验收证书
链接地址:https://www.31doc.com/p-2034224.html