《无机保温砂浆面砖工法.doc》由会员分享,可在线阅读,更多相关《无机保温砂浆面砖工法.doc(12页珍藏版)》请在三一文库上搜索。
1、the partys fine style, carry forward the traditional Chinese virtues, practicing the Socialist core values, vigorously carry forward the spirit of Jiao Yulu, Hongqi Canal spirit and spirit of persistence, honesty in politics, strict statesman, stick to the spiritual heights of the Communists. Four t
2、o devotion, as, do play a role in qualifying. Official Communist duty. To fulfill the partys purpose, maintain for the people themselves, and dedication, devotion, maintain pioneer, pioneering and enterprising spirit, active at the well-off extra practice, make contributions. The incentive function
3、of party organizations at all levels should give full play to advanced models, establish a representative, advanced and typical of the times, and guide the broad masses of party members to emulate. In honor of the 95 anniversary of founding as an opportunity to award in recognition of a number of ou
4、tstanding party members advanced grass-roots party organizations, outstanding party workers, and put the pioneer trees. Third, the reform efforts for example, be sure to change into. Learning to teachEducation in order to solve the problem, if it does not solve the problem, it will form, goes throug
5、h the motions. To strengthen the consciousness of problems and insisted on problem-oriented, problem-solving learning education for traction, truly deep investigation into change, modification. A checked swing. Learning education programme for party-building in our city actually proposed to focus on
6、 solution of fuzzy ideals and beliefs waver, consciousness, purpose of the party weak sense, honesty and self-discipline awareness is not strong, depressed, six issues of ethical misconduct study contents specific programmes for all party members and leading cadres above the county level shall focus
7、 on further refinement to the problems. Specific to every party member and every cadre, also requires a combination of actual and controlled, focused and really put yourself in, people see things, see, with their own specific problems to learn Constitution Party rules, series, address, so precision
8、to find the problem, laying a solid foundation for further corrective action. B to make change. For check put of problem, through established rectification Taiwan account, and take special supervision, and on account PIN, approach, insisted do side learn side modified, and that know that modified, w
9、hile focused on put two learn a do learning education rectification with grasp party of mass line education practice activities and three strict three real topic education problem rectification combined up, consolidation expanded has made of rectification results, strongly corrected for officer not
10、for, and Chi and endless corrected four wind, and regulation masses side of abuses, ensure work advance more powerful, and problem solution more completely. Third, we must consolidate our achievements. For more public, some party members who focus on the outstanding issues, combining concentrated无机膨
11、胀玻化微珠保温砂浆涂料饰面外墙外保温系统施工工法北京振利高新技术有限公司北京振利建筑工程有限责任公司1 前言无机膨胀玻化微珠保温砂浆外墙外温系统是一种现场抹灰成型的无空腔外墙外保温做法。目前,无机玻化微珠外保温系统技术比较成熟,已被越来越多的工程所采用。2 特点玻化微珠保温砂浆由工厂预拌干混料在施工现场按比例加水和轻骨料玻化微珠,搅拌均匀即可使用,可直接抹与建筑维护结构上。该系统具有良好的保温隔热性、抗裂性,优异的防火性、抗风压性,适应墙面及门、窗、拐角、圈梁、柱等变化,操作方便。材料的利用率高,基层剔补量小,节约人工费。是一种适用范围广、技术成熟度相对较高、施工可操作性强、施工质量易控、性价
12、比优良的外墙外保温系统。3 适用范围 适用于建筑节能50%和65%目标要求,基层墙体为钢筋混凝土、各类砌体等新建、扩建和既有房屋改造的工业民用建筑;保温砂浆直接抹与建筑基层作为单独的保温层;外饰面采用面砖粘贴。4 工艺原理本工法保温层采用现场抹灰成型的做法。墙体基层用界面砂浆处理,使吸水率不同的材料附着力均匀一致;保温层形成一个整体,无板缝,减缓增长强度的配比及大量纤维的添入使保温层不易发生空鼓;抗裂防护层采用抗裂砂浆复合热镀锌钢丝网,由尼龙胀栓锚固于基层墙体,抗震性能好;饰面层采用的专用面砖粘结砂浆及面砖勾缝料均具有粘结力强、柔韧性好、抗裂防水效果好。系统各构造层材料柔韧性匹配,热应力释放充
13、分。基本构造见表1。表1 面砖饰面无机玻化微珠保温砂浆外保温系统基本构造基层墙体面砖饰面无机玻化微珠保温砂浆外保温系统基本构造构造示意图界面层保温层抗裂防护层饰面层混凝土墙及各种砌体墙界面砂浆玻化微珠保温砂浆第一遍抗裂砂浆+热镀锌钢丝网(用尼龙胀栓与基层锚固)+第二遍抗裂砂浆面砖粘结砂浆+面砖+勾缝5 工艺流程及操作要点5.1 施工工艺流程基层处理配制玻化微珠保温砂浆铺钉热镀锌四角网,用尼龙胀栓锚固抹第二遍抗裂砂浆配制基层界面砂浆喷刷基层界面砂浆吊垂直、弹控制线抹玻化微珠保温砂浆做灰饼、冲筋抹第一遍抗裂砂浆配制面砖粘结砂浆粘贴面砖配制面砖勾缝料面砖勾缝配制抗裂砂浆钢网展平、裁剪等预处理图1 无
14、机玻化微珠保温砂浆面砖饰面外墙外保温施工流程5.2 操作方法和要求5.2.1 施工准备(1)基层墙体应符合混凝土结构工程施工质量验收规范(GB 50204-2002)和砌体工程施工质量验收规范(GB 50203-2002)及相应基层墙体质量验收规范的要求,保温施工前应会同相关部门做好结构验收的确认。如基层墙体偏差过大,则应抹砂浆找平。(2)房屋各大角的控制钢垂线安装完毕。高层建筑及超高层建筑时,钢垂线应用经纬仪检验合格。(3)外墙面的阳台栏杆,雨漏管托架,外挂消防梯等安装完毕,并应考虑到保温系统厚度的影响。(4)外窗的辅框安装完毕。(5)墙面脚手架孔,穿墙孔及墙面缺损处用相应材料修整好。(6)
15、混凝土梁或墙面的钢筋头和凸起物清除完毕。(7)主体结构的变形缝应提前做好处理。(8)根据工程量、施工部位和工期要求制定施工方案,要样板先行,通过样板确定定额消耗,由甲方、乙方和材料供应商协商确定材料消耗量,保温施工前施工负责人应熟悉图纸。(9)组织施工队进行技术培训和交底,进行好安全教育。(10)材料配制应指定专人负责,配合比、搅拌机具与操作应符合要求,严格按厂家说明书配制,严禁使用过时浆料和砂浆。(11)根据需要准备一间搅拌站及一间堆放材料的库房,搅拌站的搭建需要选择背风方向,靠近垂直运输机械,搅拌棚需要三侧封闭,一侧作为进出料通道。有条件的地方可使用散装罐。库房的搭建要求:要求防水、防潮、
16、防阳光直晒。材料采取离地架空堆放。(12)施工时气温应大于5,风力不大于4级。雨天不得施工,应采取防护措施。5.2.2 基层墙面处理墙面应清理干净、清洗油渍、清扫浮灰等。墙面松动、风化部分应剔除干净。墙表面凸起物大于10mm时应剔除。 图2 基层墙面处理为使基层界面附着力均匀一致,墙面均应做到界面处理无遗漏。基层界面砂浆可用喷枪或滚刷喷刷。砖墙、加气混凝土墙在界面处理前要先淋水润湿,堵脚手眼和废弃的孔洞时,应将洞内杂物、灰尘等物清理干净,浇水湿润,然后按要求将其补齐砌严。5.2.3 吊垂直、弹控制线根据建筑物高度确定放线的方法,高层建筑及超高层建筑可利用墙大角、门窗口两边,用经纬仪打直线找垂直
17、。多层建筑或中高层建筑,可从顶层用大线坠吊垂直,绷铁丝找规矩,横向水平线可依据楼层标高或施工0.000向上500mm线为水平基准线进行交圈控制。根据调垂直的线及保温厚度,每步架大角两侧弹上控制线,再拉水平通线做标志块。 图3 吊垂线 做灰饼 5.2.4 做灰饼、冲筋在距楼层顶部约100mm和距楼层底部约100mm,同时距大墙阴或阳角约100mm处,根据垂直控制通线做垂直方向灰饼(楼层较高时应两人共同完成),作为基准灰饼,再根据两垂直方向基准灰饼之间的通线,做墙面找平层厚度灰饼,每灰饼之间的距离按1.5m左右间隔粘贴。灰饼采用玻化微珠保温砂浆预制块或直接用稍干的玻化微珠保温砂浆成型。待垂直方向灰
18、饼固定后,在两水平灰饼间拉水平控制通线,具体做法为将带小线的小圆钉插入灰饼,拉直小线,使小线控制比灰饼略高1mm,在两灰饼之间按1.5m左右间隔水平粘贴若干灰饼或冲筋。每层灰饼粘贴施工作业完成后水平方向用5m小线拉线检查灰饼的一致性,垂直方向用2m托线板检查垂直度,并测量灰饼厚度,冲筋厚度应与灰饼厚度一致。用5m小线拉线检查冲筋厚度的一致性,并作记录。5.2.5 抹玻化微珠保温砂浆保温层(1) 界面砂浆基本干燥后即可进行保温砂浆的施工。(2) 在施工现场搅拌质量可以通过测量湿表观密度并观察其可操作性、抗滑坠性、膏料状态等方法判断。(3) 玻化微珠保温砂浆应分层作业施工完成,每次抹灰厚度不宜大于
19、20mm,保温砂浆底层抹灰时顺序按照从上至下,从左至右抹灰。第一遍抹灰后应当拉毛,尽量做到表面粗糙,使得其与第二遍灰粘结牢固。每层施工间隔为24小时。(4)保温砂浆面层抹灰厚度要抹至与标准贴饼一平。涂抹整个墙面后,用大杠在墙面上来回搓抹,去高补低,最后再用铁抹子压一遍,使表面平整,厚度一致。 图4.1 第一遍抹保温砂浆毛面处理 图4.2 最后一遍找平保温层(5) 保温层修补应在面层抹灰23小时之后进行,施工前应用杠尺检查墙面平整度,墙面偏差应控制在2mm。保温面层抹灰时应以修为主对于凹陷处用稀浆料抹平,对于凸起处可用抹子立起来将其刮平,最后用抹子分遍再赶抹墙面,先水平后垂直,再用托线尺,2m杠
20、尺检测后达到验收标准。(6) 保温施工时,在墙角处铺彩条布接落地灰,在可施工时间范围内,落地灰可直接使用,过时的落地灰严禁使用。(7) 阴阳角找方、门窗侧口、滴水线应按下列步骤进行: 用木方尺检查基层墙角的直角度,用线坠吊垂直检验墙角的垂直度。 保温砂浆面层大角抹灰时要用方尺压住墙角浆料层上下搓动,抹子反复检查抹压修补,基本达到垂直。然后用阴、阳角抹子压光,以确保垂直度偏差2mm,直角度偏差2mm。 门窗口施工时应先抹门窗侧口、窗台和窗上口,再抹大面墙。施工前应按门窗口的尺寸截好单边八字靠尺,做口应贴尺施工以保证门窗口处方正。5.2.6 抗裂砂浆层及饰面层施工待保温层施工完成37d且保温层施工
21、质量验收合格以后,即可进行抗裂砂浆层施工。图5 抹第一遍抗裂砂浆 图6 铺贴钢丝网,胀栓固定施工时抹第一遍抗裂砂浆,厚度控制在23mm。热镀锌电焊网分段进行铺贴,热镀锌电焊网的长度最长不应超过3m,为使边角施工质量得到保证,施工前预先用钢网展平机、剪网机及挝角机对热镀锌电焊网进行预处理。先用钢丝网展平机将钢丝网展平并用剪网机裁剪四角网,用挝角机将边角处的四角网预先折成直角。铺贴时应沿水平方向,按先下后上的顺序依次平整铺贴,铺贴时先用U型卡子卡住四角网使其紧贴抗裂砂浆表面,然后按双向500梅花状分布用尼龙胀栓将四角网锚固在基层墙体上,有效锚固深度不得小于25mm,局部不平整处用U型卡子压平。热镀
22、锌电焊网之间搭接宽度不应小于两个网格,搭接层数不得大于3层,搭接处用U型卡子、钢丝固定。所有阳角钢网不应断开,窗口侧面、女儿墙、沉降缝等钢丝网收头处应用水泥钉加垫片使钢丝网固定在主体结构上。 图7 粘贴面砖锚固点分布图 图8 锚固热镀锌四角钢网四角网铺贴完毕应重点检查阳角钢网连接状况,再抹第二遍抗裂砂浆,并将四角网包覆于抗裂砂浆之中,抗裂砂浆的总厚度宜控制在810mm,抗裂砂浆面层应平整。 预留孔洞 图9 门窗洞口网格布铺贴方法 图10 抗裂砂浆层5.2.7 粘贴面砖 (1) 饰面砖工程深化设计:饰面砖粘贴前,应首先对涉及未明确的细部节点进行辅助深化设计,按不同基层做出样板墙或样板件,确定饰面
23、砖排列方式、缝宽、缝深、勾缝形式及颜色、防水及排水构造、基层处理方法等施工要点。饰面砖的排列方式通常有对缝排列、错缝排列、菱形排列、尖头形排列等几种形式;勾缝通常有平缝、凹平缝、凹圆缝、倾斜缝、山型缝等几种形式。确定粘结层及勾缝材料、调色矿物辅料等的施工配合比,外墙饰面砖不得采用密缝,留缝宽度不应小于5mm;一般水平缝10-15mm,竖缝6-10mm,凹缝勾缝深度一般为2-3mm。排砖原则确定后,现场实地测量层结构尺寸,综合考虑找平层及粘结层的厚度,进行排砖设计,条件具备时应采用计算机辅助计算和制图。做粘结强度试验,经建设、设计、监理各方认可后以书面的形式进行确定。(2) 弹线分格:抗裂砂浆基
24、层验收后即可按图纸要求进行分段分格弹线。同时进行粘贴控制面砖的工作。以控制面砖出墙尺寸和垂直度、平整度。注意每个立面的控制线应一次弹完。每个施工单元的阴阳角,门窗口,柱中、柱角都要弹线。控制线应用墨线弹制,验收合格后班组才能局部放细线施工。(3) 排砖:排砖时宜满足以下要求:阳角、窗口、大墙面、通高的柱垛等主要部位都要排整砖,非整砖要放在不明显处,且不宜小于1/2整砖;墙面阴阳角处最好采用异型角砖,如不采用异型砖,宜留缝或将阳角两侧砖边磨成45角后对接;横缝要与窗台平齐;墙体变形缝处,面砖宜从缝两侧分别排列,留出变形缝;外墙饰面砖粘贴应设置伸缩缝,竖向伸缩缝宜设置在洞口两侧或与墙边、柱边对应得
25、部位,横向伸缩缝可设置在洞口上下或与楼层对应处,伸缩缝应采用柔性防水材料嵌缝;对于女儿墙、窗台、檐口、腰线等水平阳角处,顶面砖应压盖立面砖,立面底皮砖应封盖底平面面砖,可下突3-5mm兼作滴水线,底平面面砖向内翘起以便于滴水。(4) 浸砖:吸水率大于0.5%的瓷砖应浸泡后使用。吸水率小于0.5%的瓷砖不需要浸砖。瓷砖浸水后应晾干后方可使用。(5) 贴砖: 贴砖施工作业前,应在粘贴基层上充分用水湿润;贴砖作业一般为从上之下进行。高层建筑大墙面贴砖应分段进行。每段贴砖施工应由下至上进行。先固定好靠尺板贴最下一皮砖,面砖贴上后用灰铲柄轻轻敲击砖面使之附线,轻敲表面固定;用开刀调整竖缝,用小杠尺通过标
26、准点调整平整度和垂直度,用靠尺随时找平找方;在粘结层初凝时,可调整面砖的位置和接缝宽度,初凝后严禁振动或移动面砖。砖缝宽度可用自制米厘条控制,如符合模数也可采用标准成品缝卡。墙面突出的卡件、水管或线盒处宜采用整砖套割后套贴,套割缝口要小,圆孔宜采用专用开孔器来处理,不得采用非整砖拼凑镶贴。粘贴施工时,当室外气温大于35,应采取遮阳措施。贴砖时背面打灰要饱满,粘结灰浆中间略高四边略低,粘贴时要轻轻揉压,压出灰浆最后用铁铲剔除灰浆.粘结灰浆厚度宜控制在3-5mm左右。面砖的垂直、平整应与控制面砖一致。粘贴纸面砖时应事先制定与纸面砖相应的模具,将模具套在纸面砖上,然后将模具后面刮满粘结砂浆厚度为25
27、,取下模具,从下口粘贴线向上粘贴纸面砖,并压实拍平,应在粘结砂浆初凝前,将纸面砖纸板刷水润透,并轻轻揭去纸板,应及时修补表面缺陷,调整缝隙,并用粘结砂浆将未填实的缝隙嵌实。图11 粘贴面砖5.2.8 面砖勾缝(1) 保温系统瓷砖勾缝施工应用专用的勾缝胶粉。按要求加水搅拌均匀制成专用勾缝砂浆。(2) 勾缝施工应在面砖施工检查合格后进行。粘结层终凝后可按照样板墙确定的勾缝材料、缝深、勾缝形式及颜色进行勾缝,勾缝要视缝的形成使用专用工具;勾缝宜先勾水平缝再勾竖缝,纵横交叉处要过渡自然,不能有明显痕迹。砖缝要在一个水平面上,缝深2-3mm,连续、平直、深浅一致、表面压光;采用成品勾缝材料应按厂家说明操
28、作。图12 勾缝(3) 缝勾完后应立即用棉丝或海绵蘸水或清洗剂擦洗干净,勾缝完毕对大面积外墙面进行检查,保证整体工程的清洁美观。5.2.9 细部节点图图13 细部节点做法6 工程材料6.1 干拌建筑基层界面砂浆(界面剂)、玻化微珠保温砂浆、抗裂砂浆(抗裂剂)、面砖粘结砂浆、面砖勾缝粉及面砖的主要技术指标见无机轻集料保温砂浆及系统技术规程(DB33/T10542008)中的相关要求;热镀锌电焊网的主要指标见胶粉聚苯颗粒外墙外保温系统(JG 158-2004)中的相关要求。6.2 尼龙胀栓由螺钉和带圆盘的尼龙膨胀套管两部分组成,其中螺钉采用经过表面防锈蚀处理的金属制成,尼龙膨胀套管应采用聚酰胺、聚
29、乙烯或聚丙烯等制作,不得使用回收的再生材料。尼龙胀栓应满足下表性能指标:表2 尼龙胀栓的性能指标项 目单 位指 标有效锚固深度hefmm25圆盘直径mm50单个胀栓抗拉承载力标准值(混凝土墙)kN0.80尼龙胀栓存运条件:无腐蚀介质、空气流动、相对湿度不大于85%的仓库中。运输:避免冲击、挤压、雨淋、受潮及化学品的腐蚀。可按非危险品办理。6.3 水泥:强度等级42.5或32.5普通硅酸盐水泥,水泥性能符合通用硅酸盐水泥(GB 1752007)的要求。6.4 中砂:应符合普通混凝土用砂、石质量及检验方法标准(JGJ 522006)的规定。7 机具设备7.1 机械设备表3 机具设备 序号设备名称单
30、位规格1小推车辆0.14m2砂浆搅拌机台0.3 m3380V橡套线米五芯4220V橡套线米三芯5配电箱(三项)套砂浆机及临电6钢网展平机ZP1台7钢网剪网机YD1台8钢网挝角机YC1台7.2 常用工具(1)铁抹子:保温砂浆施工宜使用抹子面积较大的矩形抹子。(2)阳角抹子,阴角抹子:保温砂浆施工宜用塑料材质,抗裂砂浆宜用钢材质。(3)托灰板(4)杠尺:铝合金杠尺长度2-2.5m和长度1.5m两种。(5)靠尺:木靠尺2-3m单面为八字尺。(6)猪鬃刷:2寸(7)方头铁锹(8)筛子:孔径2.5-3.0mm。(9)手推车(10)木方尺:单边长不小于150mm。(11)常用的检测工具:高层采用经纬仪及放
31、线工具、2m托线板/杠尺、方尺、水平尺、探针、钢尺等。(12)电源线,动力线及照明线。8 劳动组织以外墙保温面积10000m2、工期90天,无机保温砂浆保温层厚度为30mm厚,其具体的劳动组织如下:8.1 劳动力计划 表4 劳动力计划 万m2序号工种名称需求人数(人)备注1抹灰工1202壮工603管理人员4项目经理1人质检员1人安全管理员1人材料员1人8.2 材料计划 表5 材料计划 万m2序号材料名称平米耗量总用量1界面砂浆干拌建筑基层界面砂浆1.212000界面剂0.7700230厚无机保温砂浆0.03m3300m33抗裂砂浆水泥砂浆抗裂剂330000干拌抗裂砂浆12kg120000kg4
32、钢网1.212000 m25面砖粘接砂浆6kg60000 kg6勾缝粉2.5kg25000 kg8.3 施工进度计划表6 施工进度计划天工序施 工 进 度 计 划13581115182124273033363942455055606570基层处理涂刷界面砂浆抹保温砂浆抹第一遍抗裂砂浆铺贴固定四角钢网抹第二遍抗裂砂浆粘贴面砖勾缝8.4 劳动定额表7 劳动定额项 目111213无机保温砂浆50mm厚无机保温砂浆加气砼基层混凝土基层每增减10mm名 称单 位数量人工技 工工 日0.189 0.189 0.008 普 工工 日0.019 0.019 材 料1建筑用界面剂akg0.703 0.700 2
33、干拌界面砂浆akg1.202 1.200 3无机保温砂浆m30.031 0.031 0.010 4水泥砂浆抗裂剂bkg3.001 3.001 5干拌抗裂砂浆bkg12.000 12.000 6热镀锌电焊网m21.151.15712号镀锌铁丝kg0.0260.0268尼龙胀栓个5.000 5.000 9干拌砖粘结砂浆kg6.000 6.000 10面砖勾缝料kg2.500 2.500 注:a. 建筑用界面剂和干拌界面砂浆两种基层处理材料可任选一种,如选界面剂还需另按使用说明书加水泥和中砂。b. 水泥砂浆抗裂剂和干拌抗裂砂浆两种抗裂材料可任选一种,不能同时使用,如选水泥砂浆抗裂剂需另按使用说明加水
34、泥和中砂。9 安全措施9.1 安全规定表8 现场安全规定序号安全生产项目检查内容检查人工作依据结论1砂浆机出厂电机不漏电,配件齐全,安装符合要求专职安全员机器安装规定不漏电,运转正常2380V、220V相套线表皮破坏情况,皮内是否断线专职安全员按电器安装规定不破坏,不断线3阀箱箱内配套齐全并有安全装置专职安全员按电器安装规定使用时开关灵活,保证安全4小型机械开关、线是否漏电专职安全员按电器安装规定运转正常5架子搭设是否符合规范专职安全员架子搭设安全规定符合要求6劳保用品立杆、横杆、小排木、安全网、脚手板、安全帽、安全带专职安全员按劳保规定符合规定齐全7高空作业架子、板、安全帽、安全带及作业要求
35、专职安全员按架子规定及安全交底达到要求8吊篮安全帽、安全带及作业要求、限定人员数量专职安全员按吊篮规定及安全培训及交底达到要求9.2 严格遵守总包方的安全管理条例,严格遵守相应的建筑工程施工安全操作规程。9.3 建立安全责任制,进入现场前,对工人进行安全技术交底和安全培训工作。对施工机械、吊篮等操作进行培训,专职安全员作好安全检查工作。9.4 使用电源箱,要符合安全用电规章制度及施工现场临时用电安全技术规范(JGJ4688)。9.5 进入施工现场并在施工时,要带好安全帽,系好安全带,施工现场严禁吸烟,严禁酒后施工。9.6 上吊篮前经吊篮负责人同意后方可进入,施工人员必须系好安全带、带好安全帽,
36、手中工具抹子、杠尺、灰板,不准随意乱放,防止掉下砸人。9.7吊篮施工限定人员数量,防止过载,不是吊篮组装和升降操作人员,不准私自操作。10 质量要求10.1 质量控制10.1.1 基层处理。基层墙体垂直、平整度应达到结构工程质量要求。墙面清洗干净,无浮土、无油渍,空鼓及松动、风化部分剔掉,界面均匀,粘接牢靠。10.1.2 玻化微珠保温砂浆平整度控制。要求达到设计厚度,墙面平整,阴阳角、门窗洞口垂直、方正。10.1.3 抗裂砂浆的厚度控制。抗裂砂浆层厚度为810mm,墙面无明显接茬、抹痕,墙面平整,门窗洞口、阴阳角垂直、方正。10.1.4 热镀锌四角钢网与抗裂砂浆握裹力强,玻纤网布与抗裂砂浆握裹
37、力小,面砖饰面不易采用抗裂砂浆复合玻纤网做法。10.1.5 热镀锌四角钢网铺设平整,阳角部位钢网不得断开,搭接网边应被角网压盖,胀栓数量、锚固位置符合要求。10.2 质量验收本工法实施过程中应严格执行以下技术标准:建筑工程施工质量验收统一标准(GB 503002001)建筑节能工程施工质量验收规范(GB 504112007)建筑保温砂浆(GBT 204732007)膨胀玻化微珠(JCT 10422007)外墙外保温工程技术规程(JGJ 1442004)无机轻集料保温砂浆及系统技术规程(浙江标准)11 效益分析无机玻化微珠保温砂浆面砖饰面外保温系统在高层建筑中应用,采取相应的安全加固措施,有效抵
38、抗热应力、火、水或水蒸气、风压、地震等外界作用力直接作用于建筑物表面,防止出现饰面开裂、饰面砖起鼓、脱落等质量事故,使建筑物和外保温系统的安定性稳定可靠。该系统施工速度快、工程质量好、平整度好、可靠性高,市场前景广阔,具有较高的使用性。(作者:胡永腾 林燕城 黄振利 朱青)附件参考标准:1. 建筑装饰装修工程质量验收规范(GB50210-2001)2. 通用硅酸盐水泥(GB 1752007)3. 建筑保温砂浆(GBT 204732007)4. 建筑工程施工质量验收统一标准(GB 503002001)5. 建筑节能工程施工质量验收规范(GB 504112007)6. 膨胀玻化微珠(JCT 104
39、22007)7. 施工现场临时用电安全技术规范(JGJ4688)8. 普通混凝土用砂、石质量及检验方法标准(JGJ 522006)9. 无机轻集料保温砂浆及系统技术规程(DB33T10542008)reinforcing declare hidden wall reinforcing test next step. Base plate Joint: reinforced joints staggered,aasxq Taiwan. C. According to the design prepared templates, connectors, and support, release a
40、gents, cleaning preparations for material preparation and manipulation tools. D. numbers after assembling, and paint release agents, specification pile up. E. place axis, template line level elevation, template, locate the line of control and the line of control, templates should do the leveling lay
41、er at the bottom. F. installation sequence: a. before installation check: must be carefully inspected before installation template edge level elevation, template, the line of control and the correctness of the line of control, check the smoothness of leveling layer at the bottom of the template, spo
42、nge form is correct, Complete. B. welding wall spacer bars: from the roof at 50mm, according to the axis of the wall wall positioning of welding steel, using steel 600 12, welding. Basements outer defence walls and air walls are made of steel 900 12, plum blossom features as wall thickness control b
43、ased on, and positive and negative zero wall above the middle of the basement wall with grade concrete with wall support 600 plum blossom arrangement to ensure the wall thickness. C. template installation: template installation should be in place, calibration, and installation ofrectification and strengthening the management of daily education, the spirit of reform short of the complete system, pay close attention to system implementation, really make the party organization and party mem