c锚喷护壁施工方案.doc
《c锚喷护壁施工方案.doc》由会员分享,可在线阅读,更多相关《c锚喷护壁施工方案.doc(11页珍藏版)》请在三一文库上搜索。
1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free
8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i
9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
21、cadres in enterprise development in the目录一、工程概况2二、主要工程数量(未延伸10m)2三、施工方法31、土钉锚杆32、挂网33、喷射砼3四、环境保护及文明施工措施41、环境保护措施42、文明施工5五、安全生产措施51、喷射砼施工52、应急避险措施6六、施工现场临时用电6附图一、平面图7附图二、原方案沟槽断面图8附图三、重新锚喷支护沟槽断面图9附图四、土钉锚杆布置示意图10一、工程概况本工程为顶管工作坑东侧明开槽敷设管道工程,敷设管材采用D=2.6m钢筋混凝土管,开挖深度最深部位为10m,最浅部位为6.2m,敷设长度为28.4m(其中竖井中敷设管道5.
22、6m)。因沟槽北侧为居民楼房,原方案采用沟槽北侧锚喷支护,开挖坡度为1:0.4;沟槽南侧采用大开挖方式,从顶端按1:1.25坡度开挖至4米位置,留10米台阶,然后按1:1.25坡度放坡挖至基坑底。现阶段沟槽开挖施工已完成过半,西侧已挖深至6m,东侧已挖深至4m。已挖完的沟槽北侧边坡锚喷支护已完成,但因土体稳定性较差,且东侧与支护结构终点的土体出现塌方,造成北侧边坡锚喷支护结构下沉,对锚喷支护结构造成了破坏。原锚喷支护结构无法满足施工的需要经现场勘查后决定将原护壁以北1m土方采用1:0.624坡度人工取土取出,并随取土随凿除原护壁钢筋混凝土。人工取土时每次取土深度不大于0.7m,长度不大于5.0
23、m,严禁超挖,随取土随进行锚喷支护。沟槽北侧重新施作锚喷护壁,护壁采用25土钉锚杆+6网片+喷射C25混凝土结构形式进行支护。锚喷混凝土厚度为15cm,锚杆长度为5.0m。 为保证锚喷结构整体的稳定性及楼房地基安全,楼房处10m长锚喷护壁将设置地锚,将护壁连接筋与 2m长42钢管(壁厚3.25mm)地锚焊接连接。地锚需锚入原楼房地梁或混凝土地面内。沟槽西侧端头靠近竖井位置处开挖坡度同沟槽一致,随开挖对裸漏土壤部位进行锚喷支护。因沟槽北侧放坡系数为1:0.624,与我单位施工段所接沟槽处放坡系数需大于1:0.9,如若不能满足,为保证施工安全建议护壁长度延伸10m。二、主要工程数量(未延伸10m)