自升式门架升降机施工方案(1).doc
《自升式门架升降机施工方案(1).doc》由会员分享,可在线阅读,更多相关《自升式门架升降机施工方案(1).doc(10页珍藏版)》请在三一文库上搜索。
1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold
2、and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A)
3、 lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, t
4、he County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the E
5、limination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water
6、source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Do
7、mestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural dom
8、estic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud
9、, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out
10、mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intens
11、ity of鄂东职业技术学院16#学生公寓楼自升式门架升降机施工方案鄂东职院16#学生公寓主体工程开始时就安装2台SH100自升式门架升降机,以解决工程垂直运输的问题。自升式门架升降机的生产厂家为武汉建筑机械厂。 安装前的准备工作: 1、场地布局 我项目部通过对总平面布置图的研究和分析,对自升式门架升降机的安置位置已基本确定,具体位置详见附录现场平面图。根据厂家的的使用说明书,对于自升式门架升降机的基础土方开挖深度为0.5米,宽度为0.9米,长度为4米。自升式门架升降机的方位具体详见施工现场平面布置图。 2、基础的设置 土方开挖后,先进行人工清理基坑的虚土,然后采用蛙式打夯打夯,最后浇筑砼。
12、基础砼浇筑的技术要求: (1)、基础坑开挖后必须夯实,禁止在沉降不均的基础上浇筑砼; (2)、混凝土标号原设计为C20现采用商品砼C25。 (3)、各种预埋件按图纸要求制作、安装。3、安装拆卸的预定时间: 本自升式门架升降机安装拆卸根据施工需求进行安拆。 安装的施工方法: 1)、安装的基本要求 (1)、自升式门架升降机的安装严格按本说明收所规定的顺序和要求进行。 (2)、作业人员在安装时应戴安全帽,佩带安全带,穿工作鞋。 (3)、开口销必须张开到规定程度,轴端挡板(或U型卡),螺栓绳卡、钢丝绳压板螺栓及其它连接螺栓必须坚固可靠。 (4)、本机所配用的卷扬机必须有产品合格证,并制动灵活,可靠,不
13、得随意代用。 (5)、安装时,各销轴和销孔必须涂抹滑脂。 (6)、吊装组件时,必须按图纸给出的数值核算吊装设备的起吊能力。 (7)、一般情况下,吊篮中不允许站人。如站人进行维修时,吊篮需有可靠支承。(可利用停靠装置) (8)安装场地应平整,无杂物及障碍场地上空无输电线。 2)、安装程序 安装底架 (1)、安装底架,将底架放置在混凝土基础上,并用水平仪测量其水平,误差不得大于1MM,然后用设置的地脚螺栓坚固。 (2)、将升降台放在安装好的底架上。 (3)、安装基础节左右各一节。 (4)、安装吊杆。 (5)、在两个基础节有顶部各安装一专用支架。 (6)、将两个手拉葫芦装在专用支架上,并各挂住升降台
14、的一边。 (7)、拉动手拉葫芦将升降台提升到基础节上部,并使升降台上的卡板将升降台固定在两基础节间。 (8)、取下二个专用支架(暂放在升降台上),并将其中一个手拉葫芦挂在吊杆上。 (9)、转动吊杆拉动手拉葫芦,分两次起吊两个标准节,分别加在两个基础节上,并用螺栓坚固。 (10)、在两个标准节上部再安装上专用支架及手拉葫芦,将升降台到标准节最上部并固定。 (11)、将吊篮放置两柱架之间的底架上。 (12)、穿主卷扬机钢丝绳,缠绕示意图所示通过以上步骤,就完成了升降机的基础安装和第一次加节,此时升降机进入工作状态,吊篮可通过主卷扬升降。 升降机的加高 (1)、在吊篮中立放两个标准节,并注意附着管朝
15、上,并靠近建筑物,分别在吊篮上部横梁的两侧,起升吊篮约3M高,停车。 (2)、先拆下非卷扬机侧面立柱顶端的专用支架,并用螺栓坚固,然后在吊柱上悬挂手拉葫芦,再将第2个标准节吊起放置于升季台上。 (3)、将吊篮放回到地面,并使主钢丝绳放松,将卷扬机侧的主钢丝绳挂在升降台上。 (4)、拉手拉葫芦将第2个标准节放置在卷扬机侧柱架顶端用螺栓坚固。 (5)在加高的两个标准节顶端再装上专用支架,并装上手拉葫芦。 (6)、拉动手拉葫芦,使升降台上升,同时操纵主卷扬机,徐徐放松钢丝绳,放松量约9.5m,待升降台到柱架顶部时,固定住升降台。 (7)将主钢丝绳绕好。 这样通过以上步骤,便完成了升降台的第二次加高,
16、随着建筑物的升高,以后的加节步骤同上循环,直到所需要的高度。但每次加节后,须测量立柱的垂直度,误差不大于总高度的1/1000。 升降机的附着 当升降机随着建筑物升高而加高的同时,需要对本机进行附着,本机采用管扣件,架管与建筑物连接,除基础节外,从第二节开始,每两节进行一层附着。附着方式与位置见图示。注意:升降机的附着与升降机的加高必须同时进行,架管与标准节和建筑物的连接须可靠。通过以上几个步骤,这样整个升降机就完成全部安装工作,本机可进行施工运行。3)、升降机的拆卸拆卸的要求及注意事项(1)、升降机拆卸前必须将相关的附着架拆去。(2)由于施工完毕后,场地变得狭小,故要注意安全,杜绝事故发生。拆
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 升式门架 升降机 施工 方案
链接地址:https://www.31doc.com/p-2040022.html