《g施工组织管理.doc》由会员分享,可在线阅读,更多相关《g施工组织管理.doc(11页珍藏版)》请在三一文库上搜索。
1、breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines. Process: preparatory w
2、ork-dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familiarity with drawing paper,
3、 check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. above 12 bar 20# galvanized iron wire, 12 following reinforcement 22# galvanized iron wire banding banding. 4.1 the Foundation beams
4、 and reinforcement of waterproof plate: binding order: cable ink pop-up panels, beams, walls, marked with paint, model, pitch wear steel and .A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processing Shi allows deviation a
5、nd test method project allows deviation (mm) test method by force steel Shun length direction full length of net size 10 ruler check bent up steel of bent folding location 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel of varieties, and level,
6、 and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide 10 ruler check mesh size 20 ruler volume continuous three document, take maximum value lashing
7、steel skeleton long 10 ruler check wide, and high 5 ruler volume ends, middle the is, take maximum value by force steel spacing 10 ruler check row from 5 ruler check cover thickness based 10 ruler check column, and beam 5 ruler check Board , And wall, and Shell 3 ruler check lashing hoop reinforced,
8、 and horizontal steel spacing 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: check pre buried pieces center line location Shi, along long
9、itudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4 template engineering th
10、e engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template hasproblems that cannot be ignored. S
11、ome leaders unwilling to do masses work, masses concept weak, on masses feelings not deep, pendulum not are with masses of relationship, think masses work is revolutionary war era of things, now obsolete has, buried business work, ignored masses work of situation compared General; some leaders not d
12、o masses work, old method regardless of with, new not with, not understand masses psychological, not understand masses wishes, not said masses language, work method simple stiff, caused masses of conflict and antipathy; some leaders cant do masses work, Faced with a lot of contradictions among the p
13、eople worry about fear, panic set in encounter group events, and some are even mismanaged, inflame, so work has suffered heavy losses, and so on. These problems we are soberly aware, enhancing the partys ruling capability, the maintenance and development of the partys advanced nature and purity, and
14、 to enhance the ability of party committees and leading cadres are good people. Attach great importance to and is good at doing mass work, has become the new urgent situation strengthening the partys governing capacity-building tasks. Combined practice of maintaining flesh-and-blood ties with the ma
15、sses, urged the broad masses of party members and cadres, especially all levels . Processing to improve as a guide to the country. What I did is summed up these new things, be promoted. This is a vivid manifestation of the Deng Xiaopings mass. Deng also put people support does not support, agreed no
16、t to agree, happy happy, promise not to promise as a starting point and destination of developing guidelines, policies, and as the only standard for measuring compliance with the wishes of the masses of the people. Under the guidance of Deng Xiaoping theory, Central Government adopted a series of im
17、portant measures to strengthen links with the masses. In December 1989, the CPC Central Committee made on adhering to and perfecting the system of multi-party cooperation and political consultation under the leadership of the Chinese Communist Party, closely for CPC and the democratic parties and th
18、e relationship between the part of the masses that they contact, effectively carrying out the mass line, played a positive role. In March 1990, the 13 plenary session adopted the decision on strengthening contacts with the masses of the Party noted that created and developed in the long struggle of
19、the partys mass line, is to realize the partys ideological line, the fundamental political and organizational work route, can always maintain flesh-and-blood ties and development of the masses, is directly related to the rise and fall of the rise and fall of the party and State. In September 1994, 1
20、4 adopted by the plenary session of the Party on strengthening decision on several major issues of party building. The requirements of the decision of the partys leading bodies and leading cadres should develop a democratic style of work, come from the masses, to the masses, together, stick to the m
21、ass line. Party of 13 session four in the plenary yihou, to Jiang comrade for core of party公路工程施工组织与管理课程标准一、基本信息学习领域:公路工程施工组织与管理 制定时间:2011年8月适用专业:道路桥梁工程技术 所属系部:工程系参考学时:60学时 学 分:3.5制 定 人:赖晓龙 批 准 人:郑金兴二、课程性质公路工程施工组织与管理是高等工程类的一门主干专业课程。本课程的任务是使学生了解并掌握在工程项目组织与管理中如何进行全方位、全过程的科学组织管理和合理协调,具有从事公路工程建设的项目组织管理知
22、识,具有从事公路建设项目管理的初步实践能力,为学生在毕业后从事有关的公路工程建设组织与管理工作中奠定坚实的基础。公路工程施工组织与管理在专业人才培养方案及课程体系中的作用主要表现在以下方面:1、本课程从高等职业教育的特点出发,以就业为导向,课程的目标是提高学生的施工组织理论基础和培养学生实践应用能力。2、本课程是道路桥梁工程技术专业知识体系的职业核心课程,是一门理论性强、专业性强、实践性强的课程。3、本课程还注重培养学生的管理能力和分析能力,面对问题,学会融会贯通,用各种知识、技能、手段和方法去满足各方的要求和期望,达到将来作为施工员、质量员、安全员、助理项目管理师的基本素质。三、课程目标1、
23、专业能力目标能根据公路工程项目管理规划的基本理论,能够按项目组织管理规范实行公路工程项目组织与管理。会运用公路工程项目全面质量管理的基本方法,初步具备公路工程项目质量、安全和文明施工管理的能力,能够整理竣工验收文件及工程备案资料,会签订工程保修合同。能熟悉资源管理、信息管理和资料管理的基本内容和基本方法,初步具备资料员的基本素质和应用计算机软件进行建筑工程项目管理的能力。能掌握进度控制的各种措施,会编制和调整优化一般的横道图计划和网络计划。2、方法能力目标持续学习,不断更新有关公路工程组织与管理的专业知识;能迅速根据不同施工项目的情况,编写施工组织计划;培养学生勤于思考、认真工作的良好作风;培
24、养学生分析问题、解决实际问题的能力。3、社会能力目标具有良好的敬业精神和职业道德。具有一定的计划、组织和协调能力。具有团队意识和一定的人际沟通能力。具有实际动手操作能力。四、学习情境设计1、设计思路公路工程施工组织与管理采用以行动为导向、工作过程系统化课程开发方法进行设计。分析梳理职业岗位所需要的知识、能力、素质要求,在课程标准编写中,以能力分析为基础设计课程,以能力培养为中心组织教学,以能力形成为目标引导学生学习,以企业认可的能力指标体系评价学习成果。整个学习领域由6个学习情境组成。学习情境的设计主要考虑以下因素:(1)以课程目标为依据,选取课程内容本课程以教学主题模块为基本单元,将项目管理
25、的各个方面作为组织学生课程学习的主要线索,适当使学生了解后继课程与教学内容的联系。通过案例教学等手段,使学生逐步认识到本课程的学习对提高专业理论知识和技能的重要性。(2)注重实践教学本课程的一大特点就是注重学生的实践能力,通过去工地参观考察实习的方式,使学生能更好的抓住此门课程的核心内容。利用案例教学这一行之有效的教学方法来加深学生对此方课程的理解,保持与企业之间的良好关系,为学生的实践提供便利条件。2、情境划分序号学习情境名称学时课内讲授课内实训情境1工程项目管理概论40情境2工程项目组织管理62情境3施工项目进度管理146情境4施工项目质量管理82情境5公路工程施工项目信息与资料管理62情
26、境6公路工程施工项目职业健康、安全与环境管理64breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines
27、. Process: preparatory work-dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familia
28、rity with drawing paper, check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. above 12 bar 20# galvanized iron wire, 12 following reinforcement 22# galvanized iron wire banding banding.
29、4.1 the Foundation beams and reinforcement of waterproof plate: binding order: cable ink pop-up panels, beams, walls, marked with paint, model, pitch wear steel and .A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processin
30、g Shi allows deviation and test method project allows deviation (mm) test method by force steel Shun length direction full length of net size 10 ruler check bent up steel of bent folding location 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel
31、of varieties, and level, and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide 10 ruler check mesh size 20 ruler volume continuous three document, tak
32、e maximum value lashing steel skeleton long 10 ruler check wide, and high 5 ruler volume ends, middle the is, take maximum value by force steel spacing 10 ruler check row from 5 ruler check cover thickness based 10 ruler check column, and beam 5 ruler check Board , And wall, and Shell 3 ruler check
33、lashing hoop reinforced, and horizontal steel spacing 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: check pre buried pieces center line
34、location Shi, along longitudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4
35、 template engineering the engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template hasof third g
36、eneration Central led collective, banner Deng Xiao-pings theory great flag, insisted liberation thought, and facts, and times, in both at home and abroad political storm, and economic risk, severe test before, relies on party and people, defended China features Socialist, created socialist market ne
37、w system, created full open new situation, advance party of construction new of great engineering, founded three a representative important thought, Continue to steer the ship of reform and opening up forward on the right. Comrade Jiang Zemin said: strengthening and improving the partys mass work in
38、 the new situation, it is of decisive significance to consolidating the ruling Foundation of the party. Through our party and some of the worlds major lessons learned from the success of the old party of the party, Comrade Jiang Zemin pointed out: the biggest political advantage of our party is in c
39、lose contact with the masses, the most dangerous after the ruling party was divorced from the masses. He said: our reform and construction, only the understanding, support and participation of the people, peoples enthusiasm and creativity into full play in order to advance; the leadership of the par
40、ty, only the tie and win the masses embraced, can be consolidated and strengthened. He pointed out that strengthening and improving the partys work style construction, maintaining the partys flesh-and-blood ties with the masses is the core problem, the key is to do solid work, implement, resolutely
41、oppose and overcome formalism. Comrade Jiang Zemin stressed that all the work and policies of the party, are in compliance with the fundamental interests of the overwhelming majority of the people to the highest degree, to the majority of people are not satisfied with the fundamental guidelines, str
42、ive to make our workers, farmers, intellectuals and other people enjoy . Single, everyone seemed to know. But well known does not mean perfect. Some party members and leading cadres, consider contacting their small departments, within a small circle of people, or contact individual owners, the entre
43、preneur, is the masses, this idea is obviously not correct. The Communist Party of China, people should have three characteristics. First, the people should be the most social, is a Department within the scope of the majority. Specific to the party and Government departments, especially the cadres w
44、orking in the Central and State organs, mass is the 1.3 billion Chinese people, work for the party members and cadres, masses are the land within the jurisdiction of the common people. The second characteristic of the masses, is that we have common interests. Masses are manifestations of each specif
45、ic people, but the crowd is a comprehensive political concept, refers to people with common political and economic interests in the period of social transformation, social differentiation between the interests of the masses is large, if you do not find the interest in doing mass work, the party memb
46、ers and cadres, will be in a passive position. The third characteristic of the masses3、情境描述学习领域公路工程施工组织与管理总学时60学习情境1工程项目管理概论参考学时4学习目标掌握工程项目管理的概念与分类;了解工程项目管理的基本内容和方法;掌握建设工程项目管理的相关内容及程序;了解工程项目监理相关内容。教学方法和建议讲述法; 实践法;为配合课堂教学,可有计划、有针对性地组织学生到有代表性的建筑地参观并现场教学,增强学生的感性认识和理论联系实际的综合能力。主要内容工程项目管理的概念与分类;工程项目管理的基本
47、内容和方法;建设工程项目管理的相关内容及程序;工程项目监理相关内容。工具与媒体多媒体教学设备与教学课件;案例;技术标准、规范。学生知识与能力准备项目管理的基础知识;编制管理规划的能力。教师知识与能力要求熟悉项目管理的内容和分类;掌握建设工程项目管理和施工项目管理的区别;熟悉项目管理规划的分类;能够引导学生展开讨论。学习领域公路工程施工组织与管理总学时60学习情境2工程项目组织管理参考学时8学习目标掌握项目组织管理原理、了解项目组织管理内容;掌握施工项目组织管理的设计原则;了解施工项目组织管理设计的程序;掌握项目管理组织的设计类型。教学方法和建议讲述法;理论与案例结合教学法;启发式教学法;带学生到施工企业参观施工项目管理组织机构图、了解施工企业组织机构的设置以及项目部各岗位职责,从面增强学生的感性认识。主要内容项目组织管理原理、项目组织管理内容;施工项目组织管理的设计原则;施工项目组织管理设计的程序;项目管理组织的设计类型。工具与媒体多媒体教学设备与教学课件;案例;技术标准、规范。学生知识与能力要求根据项目特征,站在整个项目的角度,选择项目管理组织的实施形式;组织能力;管理能力。教师知识与能力要求熟悉建设工程项目管理组织机构的形式;熟悉项目经理责任制;熟悉项目经理的职责。学习领域公路工程施工组织与管理总学时60学习情境3施工项目进度管理参考学时20学习目标掌握工
链接地址:https://www.31doc.com/p-2040827.html