陕西省防汛抗旱会商中心信息化提升改造工程-监理规划.doc
《陕西省防汛抗旱会商中心信息化提升改造工程-监理规划.doc》由会员分享,可在线阅读,更多相关《陕西省防汛抗旱会商中心信息化提升改造工程-监理规划.doc(62页珍藏版)》请在三一文库上搜索。
1、letters and calls, and do practical things for the masses combine good, effective through reaching people at the service of the last mile. Third, foster the development of new energy, new General Secretary XI Jinping stressed development of innovation forest restructuring, revitalization of the old
2、industrial bases in Northeast China is the States major strategy, Central has issued comprehensive opinions of revitalizing Northeast China and other old industrial bases, the CPC Central Committee on revitalization in Northeast China were . Vigorous determination does not waver, the work does not s
3、lacken off. Be firm with in the development has more to do with hard, and not muddle along, passive inaction. To rely on their own efforts, cant wait, cant wait, stand still. This not only provides new opportunities for development in our region, and gave us new requirements. We must seize the oppor
4、tunity, full use of national policy, has to be more complicated, to start and target, give full play to the initiative of leading cadres at all levels, active, active, focusing on building new momentum for development, accelerating transformation of forest development. To implement the new developme
5、nt philosophy. Philosophy is the action guide, new ideas and new developments. Carrying out innovation, coordination and development of green, open, shared ideas, must be measurable, direct action with new development concepts, training cadres. In a new development concept as a yardstick. Establishe
6、d in line with the new concept of evaluation system and evaluation criterion, embodies the new development policy, organization, mandate implementation, always measured by the new development philosophy, continuous correction of forest transition course. In a new development concept for the path com
7、mand. As part of the implementation of the new development philosophy followed and action guidelines, firmly adjusted, corrected and reject unsuitable, inappropriate and even against the new development ideas, behaviors and practices, more pragmatic approach based on a broad vision, and creatively c
8、arry out ecological construction, industrial development, improving peoples livelihood, such as the work to ensure that new development ideas take root in forest areas. In a new development concept for weapon training cadre. Education leaders in the new, nothing two articles, enhancing vitality and
9、power. Combined development six big industry, and implementation three big engineering, and create two big environment, strengthening on new development, and new economy concept of learning, and grasp and using, real put thought and action unified to new development concept up, at with new developme
10、nt concept armed himself, and guide practice, effective do advocate innovation, and focused on coordination, and advocate green, and thick plant open, and advance shared. Second, we must rely on Science and technology affects. Technical innovation is the promotion of economic transformation and upgr
11、ading, quality and efficiency first power. 陕西省防汛抗旱会商中心信息化提升改造工程监理规划 陕西省防汛抗旱会商中心信息化提升改造工程监理规划编制单位:陕西省信息系统工程监理中心有限公司编制时间:2010年1月文档编号:SISC/C/GJ/JG/ 002/2010分 类:C层密 级:普通陕西省防汛抗旱会商中心信息化提升改造工程监理规划工程名称陕西省防汛抗旱会商中心信息化提升改造工程工程编号2010SISC002版 本1.0工程类型信息系统工程共 页建设单位陕西省水利厅承建单位陕西北斗恒星科技发展有限公司陕西大道电子工程有限公司西安天曦数码音视系统有限公
12、司监理单位陕西省信息系统工程监理中心有限公司工程总监赵健编 制赵健审 批日 期2010-1目 录1.工程概况31.1工程建设任务31.2本工程具有以下特点:31.3工程实施中应把握的重要环节32.监理范围、监理服务期与监理原则42.1监理范围42.2监理服务期52.3监理原则53.监理任务53.1质量控制63.2进度控制133.3投资控制173.4变更控制183.5信息管理193.6合同管理203.7安全管理203.8沟通协调213.9监理重点224.监理目标335.监理依据345.1质量控制的依据345.2进度控制的依据365.3投资控制的依据366.监理组织机构及人员376.1监理组织机构
13、376.2监理人员安排计划387.监理工作方法与控制措施407.1监理工作方法407.2监理控制措施418.监理工作程序439.监理工作制度5410.监理设施55监理设施一览表如下表:5611.监理服务质量保证措施5812.监理报表601.工程概况1.1工程建设任务工程名称:陕西省防汛抗旱会商中心信息化提升改造工程项目类别:信息系统工程工程地址:陕西省水利厅2号楼陕西省防汛抗旱会商中心信息化提升改造工程包括:1. 陕西省防汛抗旱会商中心信息化提升装修改造工程2. 信息化设备配置工程包括:投影显示系统、数字会议系统、音响扩声、数字录播系统、会议中央控制系统、信号切换、桌面显示、沙盘等系统;3.
14、网络机房工程标准化机房建设1.2本工程具有以下特点:投资大,设备多、系统多;技术含量高;工程质量和信息安全、系统可靠性要求高;涉及部门较多,协调量大1.3工程实施中应把握的重要环节本工程质量要求高,项目实施过程中应把握好以下重要环节实施方案和施工图纸的审核确认设备、材料进场验收隐蔽工程验收系统测试工程资料审查系统培训工程验收2.监理范围、监理服务期与监理原则2.1监理范围1、机房建设、会商装修、设备采购与安装监理 (1) 审核承建方提交的设计方案是否满足招标文件及建设单位的需求 (2) 对承建方所做方案及设计图纸做出评估与合理化建议(3) 协调承建方以及建设方关系(4) 质量控制与进度控制(5
15、) 监督与审核机房建设是否符合规范。(6) 参与和协调与已制定方案需临时变更的各类事项(7) 确认承建方提供的各类设备与材料(8) 对承建方提供的各种电器设备进行加电验收(9) 评估机房建设方案(10)监督审核机房建设工程2、培训与系统运行测试 在试运行阶段,监理方的主要责任为: 监督承建方为试运行作好保驾护航,作好试运行记录及故障排除。 监督承建方严格按照培训计划对业主工作人员进行各类培训 3、系统验收监理方参与工程验收,出具验收报告编制并提交监理工作总结报告帮助制定系统运行管理规章制度2.2监理服务期自监理合同签订之日起至项目验收、交付使用。2.3监理原则委托原则严格按照委托监理合同中确定
16、的监理范围和内容进行项目的控制和管理。独立公正原则 本项目监理项目部将公正、独立、自主地开展监理工作,为建设单位提供监理服务,同时依法维护施工单位的合法权益。保密原则对在监理过程中所涉及的有关本项目的财务、商务和技术方案等方面的资料严格保密。总监理工程师负责制3.监理任务监理机构依据国家相关法律法规、技术标准和规范、工程技术合同、委托监理合同、招标文件、投标文件和设计方案,对本项目的质量、进度、投资、变更进行有效控制,监理工程师对合同、工程信息、信息安全进行科学、规范管理,沟通、协调合同各方工作关系,使工程项目顺利开展。本项目的监理任务概括为以下内容:l 制定项目监理方案、落实监理组织l 使本
17、项目能在计划的投资、进度和质量目标内建成使用l 监理内容包括项目的质量控制、投资控制、进度控制,项目建设的信息管理、合同管理,协调业主单位和承建单位双方的工作l 开工前根据项目情况制定监理规则和实施细则l 组织监理机构,确定监理人员l 审查本工程的技术文件l 评审系统配置的合理性、可靠性、保密性、经济性l 审查设计方案及图纸资料的合理性、可行性l 审查施工方案及进度计划的合理性、可行性l 审查安全保障是否完善可行l 审查保密措施是否完善可行l 审查质量保障体系是否完善可行l 评审预算方案的合理性l 工程实施过程的质量检查监督,工程质量评估及验收 l 审查以上各项合格后提交审查书面报告3.1质量
18、控制一、质量控制的原则(1)以主动控制为重点,以预控为前提,对本工程项目实施质量控制及管理;(2)积极督促承建方建立、健全质量管理和质量保证体系,对工程项目建设的人、机、料、法、环等生产要素实施全方位的质量控制。(3)未经监理工程师审核或经审核其资格不合格的供货单位,不得进行本工程供货任务; (4)未经监理工程师验收或经验收不合格的材料、够配件、设备、软件等不准在本工程上使用;(5)未经监理工程师验收或验收不合格的工序不予签认,且承建方不准进入下一道工序施工。(6)施工质量应符合有关的国家标准、行业标准。同时应符合本工程招标文件、建设合同要求和工程设计方案要求。二、质量控制关键点(1)需求调研
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 陕西省 防汛 抗旱 会商 中心 信息化 提升 改造 工程 监理 规划
链接地址:https://www.31doc.com/p-2041401.html