安县河清灾毁耕地复垦(板房临时用地复垦)施工组织设计(1).doc
《安县河清灾毁耕地复垦(板房临时用地复垦)施工组织设计(1).doc》由会员分享,可在线阅读,更多相关《安县河清灾毁耕地复垦(板房临时用地复垦)施工组织设计(1).doc(42页珍藏版)》请在三一文库上搜索。
1、synchronous backup software does not respond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be supported across networ
2、k segments. In accordance with the above requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial investment company limited
3、 factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cause of security, as well
4、 as previous security experience, combined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65M x 234
5、.24M rectangular site. 1.2 scope for such dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory could not spend a great deal of manpower cost to post thr
6、ee steps, five steps and a whistle. As we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active solid border defense work. We recommend that you use infrare
7、d radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as
8、 video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevant int
9、ernational standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. Second, the design princip
10、les of the project design follows technology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. Design elements of the system is the system
11、atic, integrated and comprehensive; design has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy, used
12、 module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, for Ch
13、ina conditions and this project of features. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the system is the system used for various management levels, i
14、ts functions are configured to provide the user with comfortable, safe, fast and convenient to3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-1998) 3.3, the code第一章 工程概况一、工程综合说明1、工程概况1)拆除板房,拆除水泥通道,拆除地面附着
15、物,清理连砂石,土渣运输,新建生产路;2)复耕工程; 2、自然条件安县气候宜人,生态环境优美。属亚热带湿润季风气候,气候温和,雨量充沛,四季分明,日照充足,无霜期长。年均气温163,年均降水量1260mm,空气质量常年达国家二级标准。3、建设地点情况交通设施。安县河清镇交通便利,建设地点有通村公路,但村间仅有少部分机耕路零散分布,进入田间作业很不方便,主要靠田埂和土埂通行。4、编写依据通过对本工程各阶段具体情况的分析,结合我公司的技术实力,施工水平,我们认为本工程重点是保证土地平整和农田水利工程顺利进展,使这部分工程在雨期来临之前完成,及时还土,因此分片区分阶段的工序必须紧凑,安排要合理,在施
16、工过程中,要抓住以上重点,合理部署,切实做好技术、设备、材料的准备工作,制定合理可行的施工方案,保证工程如期完成。编制依据(1)安县河清镇灾毁耕地复垦(板房临时用地复垦)施工(2)施工图纸;(3)土地开发整理行业标准; (4)现行的施工操作规程,施工验收规范。第二章 施工总体规划通过对现场的踏勘及详细研读设计文件、图纸,利用我单位人员、设备及丰富的施工经验等诸多优势,拟对本工程施工作以下规划:一、机构设置本工程承建中,我单位将实行项目法施工,由单位技术主管任项目经理,负责本工程的施工。项目部对工期、质量、成本等综合经济效益进行高效有计划地组织协调和管理,并配备先进的机具设备。以科学的手段、先进
17、的技术,优质高效地完成本项工作。项目部组织机构见附图项目部组织机构图。1、项目经理部的组成项目经理:代表单位负责本工程合同责任的全面履行,实施对本项目的全面管理,负责项目的行政、技术、财务和施工等各项管理工作,为本项目的管理核心。技术负责人:协助项目经理负责所有技术与质量安全管理工作。项目经理部共设五个部门,各部门职责如下:l 技术科:负责项目部的施工技术、计划与方案;工程施工管理测量、统计与计量;图纸设计、竣工资料的整理、技术资料的保管。l 质检科:负责工程质量的检测、验收、试验与控制。l 施工科:负责整个工程的现场施工。机构设置框图项目经理项目技术主管施工员后勤人员专职安全员工程管理组施工
18、班组施工技术组专职质检员专职试验员l 安全科:负责安全生产的管理、监督及工地治安工作。l 财务、后勤科:负责项目的财务管理,包括工作款单编制、报送;所需材料、配件的采构与供应;机电设备的管理、维修、保养;项目部的后勤行政管理,包括接待、医务、炊事、营地管理等。2、人员组成项目的管理人员包括工程师和高级技师将由我单位人员组成。大部分技工、熟练工在单位范围内选用,普工计划在当地雇佣。3、组织管理措施 为加强施工管理,项目经理将采取措施,以启发调动全体职员工作、生产的自觉性与积极性,保持良好的秩序,确保优质高速完成全同规定的施工任务,要点如下:l 制定严格的管理制度,实行命令式生产指挥模式,令行禁止
19、,纪律严明。l 制定明确的岗位经济责任制,使每位员工的工作成果与工资收入密切挂钩,奖勤罚懒,赏罚分明。二、目标计划1、质量目标:恢复原地形地貌,对原来附着在地面的混凝土、连砂石(建筑垃圾)清理完毕。先翻耕回填原剥离表土,再新客土回填种植土及培肥,土层厚度不低于50cm,土壤无污染。耕作层厚度不低于25cm,基本无砾石,有机质含量不低于15g/kg或保持耕地原有有机质含量,ph值在5.0-8.5之间或保持耕地原有ph值。并按照土地开发整理项目验收规程(TD/T1013-2000)和其他相关规范达到合格标准。2、工期目标:60日历天。3、工程施工安全目标 确保工程施工无重大安全事故,无等级火警事故
20、。4、施工文明目标 实行标准化管理,争创文明施工样板工地。5、环保及水土保持目标 严格按环保及水土保持部门有关规定进行施工,遵守国家有关环境保护的法令,控制施工用水污染,减少粉尘及空气、噪声污染,保持生态平衡,防止水土流失,创造良好的生态环境。同时为保持施工区内的环境卫生,施工、生活场地将派人定时清扫处理。在工程完工后,拆除一切必须拆除的施工临时设施,并对拆除的场地进行清理。三、 施工总体布署根据本工程的工期目标,本工程的工程量较大较散,关键是施工质量的保证,根据我单位以往对类似工程施工积累的丰富施工经验以及在护坡、砌石、砼浇筑等工程积累的经验,对本工程作以下规划:土方工程在本工程中占了相当的
21、比重,由于本工程战线长,可以同时在多个工作面作业,土方的开挖回填采取上足机械劳力,多点开花。表层土方和基槽土方的开挖、回填采用机械施工,对不能进行机械施工的地段,采用密集型人力多个工作面同时进行。砌体工程用人工作业,严格按规范施工。砼、水泥砂浆等工程,用熟练工人作业,在施工过程中,各工序、工种相互配合,力争在合同工期内把本工程做好,工程质量达到合格力争优良。我们认为本工程重点是保证土地平整和农田水利工程顺利进展,使这部分工程在雨期来临之前完成,及时还土,因此分片区分阶段的工序必须紧凑,安排要合理,在施工过程中,要抓住以上重点,合理部署,切实做好技术、设备、材料的准备工作,制定合理可行的施工方案
22、,保证工程如期完成。第三章 施工总体平面布置一、施工用地和场内交通施工用地由业主征用,按施工实际需要使用,场内大多数渠道沿线都有道路,可以当作施工用材料、机械进退场道路使用。部分不能行车或行车困难的路段,施工中结合设计修建临时道路,使用完毕可直接改建为设计道路。二、施工用电施工和生活用电由业主指定点接入,施工用电和生活用电将分开架设。按规定安装施工区和生活区的的全部照明系统,确保满足各种作业区的照明度。三、施工用水施工用水在河道或山坪塘中抽取,因工程项目施工用水量不大,考虑边抽边用,各拌和系统配用3mm薄钢板焊成的小水箱一个,容量为1.5m3,可移动使用,配备2.2kw潜水泵。输水管道采用高压
23、软管,生活用水考虑由市政自来水管路接入。四、通讯由于工程地点移动通信信号良好,日常通信可以移动电话解决。经理部可申请安装值班电话一台,并配备对讲机若干,用于测量中使用。五、砂石料本项目砂考虑外购,可由附近的料场供应。第四章 工程进度计划与措施 本工程时间相对来说比较紧,但可以多个工作面同时进行施工,所以工期能确保在60日历天内完成。在施工中,必须进行合理的施工安排,确保各道工序顺利进行,尽量减少和避免施工中的干扰,并根据施工强度进行合理的施工机械和人员的配置,必要时实行三班全天候作业,确保本工程在保证质量的前提下,满足业主对施工进度的要求。本项目涉及土地整理面积广阔,分布较分散,各片区必须同时
24、投入相应机械设备进行施工。这一阶段人员投入相对较少,主要为机械操作人员,可就近租住片区内村舍。由于各村分布相对分散且独立,不利于各片区间相互呼应,因此这一阶段经理部可暂设立于一个村上,租住民房,使用两轮摩托车作为交通工具,巡弋于各片区施工点间。及时协调解决施工中的相关问题。在这一阶段,道路施工班组也应大力开展相关项目的施工。道路可与土地平整结合,在平整的同时进行田间道和生产路的铺筑、夯实,经机械车辆通行压实后,稍作清理即可进行路肩砌体的砌筑。道路铺筑应优先于土地平整项目尽早完成,使平整所用机械有固定路线进出施工场地,避免对耕地进行过度碾压。另外,防冲工程应在进场之初即安排开展。该项目任务繁重,
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 安县 河清灾毁 耕地 复垦 板房 临时 用地 施工组织设计
链接地址:https://www.31doc.com/p-2041977.html