h大型施工方案评审及经济比选管理办法20091225.doc
《h大型施工方案评审及经济比选管理办法20091225.doc》由会员分享,可在线阅读,更多相关《h大型施工方案评审及经济比选管理办法20091225.doc(13页珍藏版)》请在三一文库上搜索。
1、pension Gold 8*60 5, living allowance 13*568 four main 1, 2015, financial, education, design section, under the leadership of our accountants to study the countrys financial policies, laws, and familiarity with financial system actively studying accounting, master professional knowledge and master t
2、he accounting technique, adhere to principles, properly implement superior departments accounting requirements. 2, give full play to accounting initiative, careful budgeting annually, and do a year-end work on the budget no budget expenditure, budget expenditures, strictly control expenditures. Ofte
3、n communicating with school leaders reported financial position, and in terms of revenue ideas, ways to strictly implement the financial system, two lines of income and expenditure. 3, further standardize the schools financial management system, created the democratic financial management group, dem
4、ocratic financial group checks the school each semester accounts. Reporting annually to the schools financial income and expenses, so that all the teachers of school finances be aware. 4, with the school leadership greater control in school debt, does not give to the debt did not comply with procedu
5、res in the accounts. 5, various infrastructural projects to the school can do to teach . The poverty alleviation of poverty alleviation and training with the combination of the proposed by 2014. In the province, the city poverty alleviation and immigration office careful guidance and county Party co
6、mmittee and government of the correct leadership, the county seriously practice the scientific development view, and counties around the target, and comprehensively implement the Central Committee and the State Council on poverty alleviation immigration policy, adhere to the, strengthen infrastructu
7、re construction, accelerate the poor areas and immigration of education, health, culture and other public welfare undertakings development, the whole village advancement and the new rural construction, through the entire village advancement, poverty alleviation immigration, intellectual, social, ind
8、ustrial and other means, increasing the masses of poor and immigrant economic income a year, I do all the work staff Through joint efforts and struggle, and achieved excellent results, 2014 for 2666 million yuan project funds, and 2013 compared to increase by 60%, poverty alleviation and resettlemen
9、t work was named the citys third, Tan Lun Tan reservoir migrants synthetic immigration village as the citys economy to inspect a major bright spot, makes the contribution to the economic and social development in Qianshan. For 2020 together to achieve well-off society to make enormous contribution,
10、is now on the 2014 since the county to carry out the implementation of poverty alleviation and resettlement work are summarized as follows: A, poverty alleviation work 1, entire village advancement. Our countys agricultural population of 38 million people, poverty population of 4.9 million people, a
11、ccounting for 1 2.9%. The county, Twelfth Five Year Plan, will focus on poverty alleviation in the village of 14, since poor agricultural village has a total population of 2.55 million, poverty population 0.518 million people, accounting for 20%.2014 years, total planning project 20, 851 million yua
12、n of total investment, including 280 million yuan of poverty relief funds of central finance, county matching funds of 70 million yuan department support funds 3.76 million yuan, self大临设施方案评审及经济比选管理办法桥总2010 号第一条 为加强工程项目的技术管理,明确大临设施方案编制内容,规范审核程序,确保方案的科学性、经济型和实用性,并保证方案顺利实施,依据集团公司发布的标准化项目管理制度体系文件(2009年
13、8月)、施工组织设计和技术方案分层审核、优化、审批制度 (中铁一施2007109号)、施工技术管理条例 (中铁一施2007269号)和中铁一局桥梁公司危险性较大工程安全专项施工方案编制及专家论证审查实施办法(桥总20095号)及相关安全生产法律法规等制定本办法。第二条 大临设施方案设计、鉴定实行总工程师(技术负责人)技术负责制,方案的设计、鉴定必须在各级总工程师(技术负责人)组织下进行。第三条 重难点工程在编制实施性施工组织设计和开工报告前必须进行大临设施方案评审及经济比选。编制大临设施方案时必须有两套及以上,都具有可行性的比选方案,每个方案都有初步设计,具备第七条包含的内容。第四条 大临设施
14、方案分公司和集团公司两级审批、鉴定。公司审批鉴定范围的方案,由施工管理部、总工办、项目管理部、安全质量监察部共同核定。集团公司审批鉴定范围的方案,汇总公司四部门审核意见,报集团公司施工技术管理部审核、鉴定。1.施工管理部为主责部门,负责审核方案的可行性,是否满足施工生产进度、质量、工艺和规范要求。2.总工办负责对方案设计、计算资料、材质、测试手段及结果机械审查和核定。3.项目管理部对方案的经济性进行审核。4. 安全质量监察部负责审定方案的安全措施和应急预案是否满足相关要求,对大临设施进行验收鉴定,并对方案实施过程进行安全监督检查。第五条 大临设施方案的分类1.桥梁工程类:预制吊装施工方案、缆索
15、吊、挂篮、爬模、造桥机、移动模架、现浇支架、大块模板、施工便桥、水中平台、钢围堰、钢吊箱、深基坑防护方案等。2.隧道工程类:洞门施工作业平台,洞内施工作业平台、斜井与竖井提升装置以及其他临时支护等。3.路基工程类:高边坡施工安全设施等。第六条 集团公司审批鉴定的范围1.自制起吊临时设施吊重在50吨以上或吊跨34.5m以上的架桥机或门式起重机。2.缆索吊2.1 塔架高度在30m以上。2.2 缆索吊跨度在200m以上。2.3 缆索吊吊重在5吨以上。3.施工便桥单跨32m及以上,荷载汽20及以上的。4.在特殊情况下需载人的缆索吊,无论规模大小,其设计必须报集团公司审批鉴定。大型方案编制完成后,编写人
16、签字,总工程师审核,交项目经理签署意见后,报施工管理部组织审核、审批。第七条 大临设施方案编制的内容1. 编制说明:编制依据,编制目的,适用范围等;2. 工程概况:工程简介,水文地质条件,施工条件(准备情况)等;3. 技术重、难点分析及对策措施;4. 主要施工技术方案、工艺流程、工程进度计划、平面布置图等;5. 设计验算;6. 主要机械设备;7. 技术经济指标。第八条 大临设施方案必须严格执行“设计-审批-制安-鉴定-投入使用”的程序。报公司审批的项目,报送的资料须有设计者、复核者签名,审定必须有项目负责人的签字并加盖项目公章。第九条 未尽事宜,按集团公司发布的标准化项目管理制度体系文件(20
17、09年8月)、施工组织设计和技术方案分层审核、优化、审批制度 (中铁一施2007109号)、施工技术管理条例 (中铁一施2007269号)和中铁一局桥梁公司危险性较大工程安全专项施工方案编制及专家论证审查实施办法(桥总20095号)办理。附表一大临设施方案评审申报表方案名称单 位日 期设 计复 核审 核工程概况1.设计情况:2.最高墩 米。3.最大桩径 米,最长桩 米。4.设计建议施工方法:5.工期:6.总造价 万元。施工调查1.气候:2.洪水期:3.最深水位: 米,最大流速 米/秒。4.地质、地形情况:5.陆路交通情况:6.水路交通情况:7.类似工程施工方法:方案简介施工方法:施工工况:结构
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 大型 施工 方案 评审 经济 管理办法 20091225
链接地址:https://www.31doc.com/p-2043350.html