1、to clean and repair, it is strictly forbidden to head reaches into the mechanical stroke range. 17th article: in overhead transmission line following work should blackout, cannot blackout Shi, due isolation protection measures, crane shall not in overhead transmission line following work, through ov
2、erhead transmission line should will lifting arm falls, in overhead line side work Shi, regardless of in any situation Xia, lifting arm, and rope or weights, and overhead transmission line of recently distance should not is less than Xia table provides: transmission line voltage 1000 v following 1-1
3、5 kV 20-40 kV 60-110 kV 220,000 v Allow minimum distances with the transmission line (m) vertical 1.5 level 1 1.5 2 3 4 5 6 4 6 18th: lamp voltage may not exceed 36 volts, when working in a damp place or metal containers, lamp voltage may not exceed 12 volts. 19th: pressure vessel should have a safe
4、ty valve, pressure gauge, and avoid sun exposure, collisions, oxygen cylinders to prevent contaminated oil; of acetylene gas, LPG, must have a safety device to prevent tempering. 20th: x-ray and gamma-ray flaw detector operation area, non-operator, not allowed to enter. Article 21st: corrosion, dust
5、 and radioactive and toxic work, protective measures are required, and to carry out regular inspection. Spider-man 22nd section III: Spider-man to regular medical examinations of the medical diagnosis, who suffer from high blood pressure, heart disease, anemia, epilepsy and other discomfort in the S
6、pider-man shall not engage in aerial work. 23rd: Spider-man dressed spirit, banned the wearing of hard bottom and easy slip-on shoe nail. 24th: Spider-man material stack stationary, tools should turn into a tool bag, transfer prohibited throwing of objects. 25th: in case of bad weather (such as wind
7、 in the above grade) construction safety, prohibition of the open air, lifting and piling. 26th article: ladder shall not deficiency document, no padded using, ladder cross document spacing to 30 cm suitable, using Shi top to tied prison, bottom should take anti-sliding measures, single ladder and g
8、round angle to 60 degrees suitable, ban II people while in ladder Shang job, as needed received long using, should lashing firm, people Word ladder in end of feet pulled prison, in channel at using ladder, due guardianship or set fence. 27th: no security measures, prohibited in hip joints, supports,
9、 trusses of the roof truss cantilever beams, and choose the frame and half fixed widget or job to walk on, Spider-man and the ground . Nine, ten basic security to prevent vehicle damage claim 1, without legal training of qualified certified personnel not familiar with vehicle performance is not driv
10、ing a car. 2, should insist on doing defense work, vehicle brake, Horn, steering systems, lighting and other safety components such as poor are not allowed out of the car. 3, dump truck, dump truck car hop is strictly prohibited, prohibited goods mixing, loading of vehicles should not overload,stave
11、bn tm vdce mst een. een by mlo zahrnovat analzu rizik, monost nehod charakteristik a nouzovch postup, nouzov zpracovn a obsah opaten. 4, integrovan pohotovostn plny, speciln havarijn plny a mst een by mly bt mezi sebou a s ostatnmi jednotky zapojeny v nouzi, kter jsou vzjemn propojeny. 5, havarijn p
12、ln by ml zahrnovat havarijn personl a organizace kontakt, nouzov rezervn seznam a dal informace. Informace by mly bt pravideln aktualizovny a zajist, e informace jsou pesn a platn. tyi, havarijn pln revize 1, Recenze pohotovostn plny pezkoumn formul a prvky pezkumu a opaten pijatch dvma zpsoby. Kdy
13、host slou pedevm pro havarijn plny pro zznam v podob Recenze, prvek hodnocen pro nouzov hodnocen. . Kd pro porn ochranu konstrukce budov a nsk republice ny exploze nebezpen oblasti elektrick bezpenostnch pedpis a pedpis o porn ochranu design rafinaci ropy a chemickch podnik, napklad poadavky na pedp
14、isech a nazench. 2. pi provdn instalace me zpsobit por, exploze, kter sti by mly bt pln nastaven peht, petlaku, micch pstroj, alarm (zvuk a svtla). 3. kde je holav plyn (pra) me unikat , holav plyn koncentrac detekce, alarm by mla bt nastavena. 4. vechny komunikoval s holav, vbun zazen s inertnm ply
15、nem, plynov penosov potrub, by mla bt nastavena zabrnit holavch a vbunch ltek do zazen, ale nemla bt samostatn zptn ventil. 5. holav plyn (pra) nastavit plamen svodi odvzduovac vvod, snadno pracovat, kde se zastavit ventily, aby pi vstupn vtrac potrub je v plamenech, peruil por plynu odvzduovac potr
16、ub ml bt nainstalovn v nejni hasicho zazen. 6. kdy dopravu holavch materil by mla odpovdat prmru potrub a stedn mrn odpor, sprvn zen prtoku, co nejvce se vyhnout statick elektiny. Antistatick opaten, jako jsou zazen, potrub, by mlo bt v souladu s technickmi pedpisy pro uzemnn design pro chemick podn
17、iky pslunch ustanoven. 7. nhl vbun petlaku nebo rychlho rozkladu vrobnch zazen nebo skladovacch zazen by mly bt vybaveny vbuchu (nevbun membrna), vvoz nonel trubice smrem k bezpenosti a aby prevence sekundrnch exploz, protiporn opaten. 8. vrobnthe principle of simplified EIA of construction projects
18、 in the region. In terms of land, linked to the implementation of urban and rural construction land increase and decrease, replacement indicators for priority areas project. Charges, into the projects of water, electricity, administrative charges and preferential policies. In the area of taxation, a
19、nd settled in areas of industry and its production company, within 5 years after the completion of fiscal incentives to enterprises. In terms of financing, integration of land, tax, financial and other resources, and construct Government credit + business credit credit system, establishment of marke
20、tization, commercialization and modernization of the investment and financing platform; effective Bank-enterprise docking, encourages private capital into the Park, to raise industry development fund. 5, optimize the environment and service industries. To create policy lowlands, Highlands, integrity
21、 of service land, development land as the goal, to optimize the area under development environment. All administrative law enforcement departments to appoint a full-time personnel stationed in areas dedicated to coordinating and solving problems associated with businesses in this sector. When there
22、are substantial issues, sector leaders arranged to personally intervene, in-person, in-person push tangible area building a green light, easy line. To further reduce and standardize administrative examination and approval items, simplify examination and approval links, improve efficiency; according
23、to the .Since the educational practice of the mass line of the party, himself seriously in the education, practical control central eight rules and opposing the four winds and practicing three Suns, and check the spirit of Jiao Yulu, ideology, solicit opinions based on outstanding problems checked s
24、wing, careful analysis and reflection. Will now check report is as follows: first, adherence to the partys political discipline, eight in the central provision, change the style of the basic situation of 1, in compliance with the partys political disciplines. Conscientiously abide by the partys poli
25、tical discipline, abide by the Constitution and the rules and regulations of the party, in the political, ideological and maintain highly consistent with the CPC Central Committee on the action, there is no violation of the partys political discipline problems. 2, in the implementation of the centra
26、l authorities of the eight provisions. Improving research, improving research methods, but there are less grass-roots units, primary first-hand an inadequate grasp of the problem, which is to be strengthened in the future. Second, construction, strictly in accordance with the provisions to streamlin
27、e and improve the quality of meetings of the Conference. Third, streamlining file briefs, culture involves all aspects of propaganda and ideology, sometimes due to the practical needs of invention notifications, this area needs further京石二通道(大苑村-市界段)高速公路工程六环加宽桥T梁架设及加宽路基占路施工方案中铁十三局集团第一工程有限公司京石二通道(大苑村-
28、市界段)高速公路工程一标段项目经理部2013年4月北京to clean and repair, it is strictly forbidden to head reaches into the mechanical stroke range. 17th article: in overhead transmission line following work should blackout, cannot blackout Shi, due isolation protection measures, crane shall not in overhead transmission line
29、 following work, through overhead transmission line should will lifting arm falls, in overhead line side work Shi, regardless of in any situation Xia, lifting arm, and rope or weights, and overhead transmission line of recently distance should not is less than Xia table provides: transmission line v
30、oltage 1000 v following 1-15 kV 20-40 kV 60-110 kV 220,000 v Allow minimum distances with the transmission line (m) vertical 1.5 level 1 1.5 2 3 4 5 6 4 6 18th: lamp voltage may not exceed 36 volts, when working in a damp place or metal containers, lamp voltage may not exceed 12 volts. 19th: pressur
31、e vessel should have a safety valve, pressure gauge, and avoid sun exposure, collisions, oxygen cylinders to prevent contaminated oil; of acetylene gas, LPG, must have a safety device to prevent tempering. 20th: x-ray and gamma-ray flaw detector operation area, non-operator, not allowed to enter. Ar
32、ticle 21st: corrosion, dust and radioactive and toxic work, protective measures are required, and to carry out regular inspection. Spider-man 22nd section III: Spider-man to regular medical examinations of the medical diagnosis, who suffer from high blood pressure, heart disease, anemia, epilepsy an
33、d other discomfort in the Spider-man shall not engage in aerial work. 23rd: Spider-man dressed spirit, banned the wearing of hard bottom and easy slip-on shoe nail. 24th: Spider-man material stack stationary, tools should turn into a tool bag, transfer prohibited throwing of objects. 25th: in case o
34、f bad weather (such as wind in the above grade) construction safety, prohibition of the open air, lifting and piling. 26th article: ladder shall not deficiency document, no padded using, ladder cross document spacing to 30 cm suitable, using Shi top to tied prison, bottom should take anti-sliding me
35、asures, single ladder and ground angle to 60 degrees suitable, ban II people while in ladder Shang job, as needed received long using, should lashing firm, people Word ladder in end of feet pulled prison, in channel at using ladder, due guardianship or set fence. 27th: no security measures, prohibit
36、ed in hip joints, supports, trusses of the roof truss cantilever beams, and choose the frame and half fixed widget or job to walk on, Spider-man and the ground . Nine, ten basic security to prevent vehicle damage claim 1, without legal training of qualified certified personnel not familiar with vehi
37、cle performance is not driving a car. 2, should insist on doing defense work, vehicle brake, Horn, steering systems, lighting and other safety components such as poor are not allowed out of the car. 3, dump truck, dump truck car hop is strictly prohibited, prohibited goods mixing, loading of vehicle
38、s should not overload,ch zazen, budov a konstrukc, tanky a jin zsuvky prmyslov vody, krom ustanoven vodu tak, by mlo bt instalovno v oblasti s vodou k utsnn vrtu, uzavrac ventil, aby se zabrnilo velk mnostv holavch a vbunch materil do kanalizace. 9. pouit v holavch, vbunch plyn pojistn ventil a vtra
39、c potrub, je nutn export trubice je umstn mimo a vy ne 2 metry nad budovou. (B) pouvn ohn, ohe (viz systm sprvy prce) (c) porn zazen a organizac 1. realizace prevence prvn a integrovan prevence ohe politiku, pijmout modern technologie poru a vbuchu prevence a pomoci, provdn zen podle cl. 2. zzen ved
40、en spolenosti a vedouc jednotlivch oddlen Porn bezpenost vboru, workshop zaloena porn ochrany, vedouc skupiny a nastavit dobrovolnch hasi. 3. spolenost tvaru ochrany spotebitele na pln vazek hasii, hasii formulovat pln protiporn prevence a akn pln, provdn zen podle cl, pravideln proveden publicitu p
41、orn prevence a vzdlvn a kolen, v kombinaci s oekvan porn cvien. 4. soubor stacionrn ohn uvnit spolenosti zazen, protiporn zazen mus bt v Sprva slueb, rozvoj provozn postupy a systmy zen. 5. porn zazen na serveru nastavit jasn, pstup k pohodln a bezpen msto, pravideln kontroly drby, ti (to je, pevn,
42、fixn typ a mnostv, podle odbornk), a nem nikdo nenapadal, pachatel dle systmu ke zpracovn. 6. vechny holav a vbun ltky ve spolenosti a potenciln ped porem a vbuchem nebezpen vroby, skladovn, prodej a pouvn procesu a jeho souvisejc vybaven, psn zen. 7. kdy je ohe, pole tby okamit uspodejte do boje s
43、ohnm, a ohledn vroby, plnovn, alarmy a ohn a adresu urit sti ohn a pinastreamlining. Four are standard visits, except as required to participate in training, no other activity. Five is to improve news reporting, for propaganda work strictly according to the regulations. Six is strictly your presenta
44、tion published strictly according to the regulations. Seven is strictly thrift, required the use of vehicles and office space and corporate hospitality. 3, change the style. Propaganda and ideological work of the new situation and new requirements of the new tasks, had done a lot of fruitful work, h
45、as made many achievements, but further closer to the grass roots, close to reality, close to the masses and also inadequate innovation must continue to improve. Second, the four winds some outstanding issues 1, oppose formalism. One theory is that he didnt, with less close contact. Theoretical study
46、 of consciousness is not high enough, system performance is not strong enough; more passive learning, active learning few generalities and learn more, delving into less. Especially based on rational thinking on major issues, applying theory to guide the work done is not good enough, not really under
47、stand and grasp the spirit and essence of the scientific Outlook on development, did not truly achieve mastery, to apply, to a certain extent, affect the development and implementation of ideas and initiatives. Second, work arrangements, and less supervision. Propaganda and ideological work is the objective, which needs to keep the continuity efforts deployed, but stressed in the work time, less supervision. For example, color weekends in the summer theatrical activities, city square performances, urging townships, communities and rural areas shows the implement