1、implemented, the operating environment which does not comply with the safety requirements, workers have the right to refuse to work. Five, the lifting work safety license management 1. the lifting work safety license by the competent departments responsible for the management of the company. 2. this
2、 by lifting the Unit received, and conscientiously implement the hoisting and lifting head, operations people, and according to the requirements for approval. 3. the safety operating permits are not allowed to transfer, alter, no off-site use, or expand the scope of uses. 4. the persons listed in th
3、e safety operation card should be consistent with the field, when personnel changes should go through the signing procedures and related matters of the transition. 5. the certificate of safe operation of lifting operation does not complete within the allotted time, shall renew the certificate of saf
4、e operation of lifting. 6. in the event of relevant meetings, breaks, night work and other special reasons, that corresponds to the job ticket must be issued after approval, the personnel and, other officers will be to replace 7. two promissory notes, exchange equipment Management Department, head o
5、f the stock exchange operation. 8. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. Temporary power supply operation management system, to ensure that the companys safety, strengthen management of temporary electrical safety, avoid personal electr
6、ical shock, fire, explosion and electrical hazards, safe, regulate electricity system is formulated. II, scope of application apply to temporary power of company-wide operations and foreign construction electric work. Third, the contents and requirements (a) temporary electrical safety requirements
7、1. Temporary electrical work must apply for temporary power operating license, no temporary power operating license are not allowed to work. 2. distribution boxes, metal boxes, metal switch box installation and electrical normal uncharged metal base, shell must do to protect, such as zero, zero and
8、the zero line should use a separate Terminal Board connections. 3. temporary electricity switchboard, distribution boxes with numbers and measures rain, lighting, must be able to secure close switchboard door, at all levels of distribution boxes shall not be stacked within a 2 m radius of debris and
9、 rain protection measures. 4. each electrical device must have “a machine, a gate, a leak and a box“ System. Switch box and the horizontal distance control of fixed electrical equipment should not be more than 3 meters, the protector should match the capacity under the control of the device. 5. when
10、 a temporary electric lines overhead, cannot use bare wires, aerial height shall not be less than 2.5 m in the device, outside of not less than 3.5 metres, crossing roads shall not be less than 5 m; reliable protection measures are required when crossing a road, is strictly prohibited in the trees o
11、r on scaffolding erected temporary power lines. 6. underground lines must be installed “to the flag“ and safety signs. Cables shall be not less than 0.7 meters deep, through roads likely to be lots of mechanical injuries should take protective sleeve, cover plate, and so on. 7. portable lighting, pl
12、aces such as basements, metal containers, wet, when you must use a safe voltage up to 36V. Transformer 36V prohibited the use of . 3. the temporary electrical permit 30KW or more issued by the engineering equipment management, 30KW electric Management Department opened in four copies, a Security Min
13、istry archives, one for electric charge, a copy to the electricity sector, an electrician.We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to
14、further strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance
15、 with law. Deepening the information management to ensure full communication “zero resistance“. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system ap
16、plication of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees applica
17、tion information system of capacity and level. Humanistic care to ensure “zero.“ To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, ric
18、h employees life; strengthening health and labour protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fra
19、ternity of Humanities environment. To strengthen risk management, ensure that the business of “zero risk“. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, an
20、d energy-saving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and contr
21、ol feedback of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve “according to law, standardize and fair.“ Innovation of performance management, to ensure that potential employees “zero fly“. To strengthen performance management, process
22、control, enhance employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in “five type Enterprise“ construction in the of core role, and fighting fortress role and
23、pioneer model role; to continues to strengthening “four good“ leadership construction, full play levels cadres in enterprise development in the 4. the persons listed in the temporary electrical permit to work should be consistent with field personnel, when personnel changes should go through the sig
24、ning procedures and related matters of the transition. 5. in the temporary electrical permit to work is not completed within the stipulated time of electricity operations, ground-breaking of the applicant to apply for temporary power operating license. 6. in the event of relevant meetings, breaks, n
25、ight work and other special reasons, job ticket must be issued after approval, the request corresponds to staff and other officers will be in place. 7. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. High operation management system in the course
26、 of work, aimed at reducing high falls, objects to combat such incidents occur, ensure employee safety, regulations are formulated. II, scope of application apply to the company activities and project work scope of construction, but also into our external contractors and personnel. Three, responsibi
27、lities, company management is working at height safety management departments. D, contents, and request 1, referred to in this system fall at height refers to the height of 2 m above the base level (2 m) fall possible jobs. Working at height is divided into four levels: working at height at an altit
28、ude of 2-5 meters, called the high level operations; Height working height of more than 5 meters to 15 meters, as second class at height; Height working height of more than 15 metres to 30 metres, known as the three levels of working at height; Working at height safety management regulations height
29、working height is more than 30 meters, called super high job; Due to work reasons, the company only relates to one, working at height, there is no grade, super high assignment. Once the work above there are three levels of the construction project, in accordance with the provisions of the relevant p
30、rocedures. 2, where there is one, working at height, of the communication construction safety rules must be strictly adhered to. 3, and all personnel involved in the construction of working at height must be trained and the climbing permits, without training and aerial work permit-free personnel for
31、 aerial work is strictly prohibited. 4, and all had high blood pressure, heart disease, anemia, epilepsy is not suitable for working at height and other personnel shall not engage in working at height. 5, high operating personnel must fasten your seat belt, helmet, clothing to flexible, banned the w
32、earing of hard bottom and nails easy slip-on shoes for working at height. 6, seat belts must be hung on the fixed objects, hanging low, must be higher than the waist, prohibited the use of any substitute in place of seat belts. 7, in adjacent areas, with release of toxic, harmful gases and dust outs
33、ide the allowed concentrations of chimney and equipment is prohibited for working at height. In the allowed range, should also take effective protective measures. In the more than six-level wind and lightning, heavy rain, fog and other adverse weather conditions affect safety during construction,of
34、backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve independent Commission against corruption work level, strengthening on enterprise business key link of effectiveness monitored. , And maintain stability
35、. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the education, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up the Olympic security controls, promot
36、ing integrated management to a higher level, higher standards, a higher level of development. Employees, today is lunar calendar on December 24, the ox Bell is about to ring, at this time of year, we clearly feel the pulse of the XX power generation company to flourish, to more clearly hear XX power
37、 generation companies mature and symmetry breathing. Recalling past one another across a railing, we are enthusiastic and full of confidence. Future development opportunities, we more exciting fight more spirited. Employees, let us together across 2013 full of challenges and opportunities, to create
38、 a green, low-cost operation, full of humane care of a world-class power generation company and work hard! The occasion of the Spring Festival, my sincere wish that you and the families of the staff in the new year, good health, happy, happy 道路交通管理设施(声屏障)施工组织设道路交通管理设施(声屏障)施工组织设 计计 implemented, the o
39、perating environment which does not comply with the safety requirements, workers have the right to refuse to work. Five, the lifting work safety license management 1. the lifting work safety license by the competent departments responsible for the management of the company. 2. this by lifting the Un
40、it received, and conscientiously implement the hoisting and lifting head, operations people, and according to the requirements for approval. 3. the safety operating permits are not allowed to transfer, alter, no off-site use, or expand the scope of uses. 4. the persons listed in the safety operation
41、 card should be consistent with the field, when personnel changes should go through the signing procedures and related matters of the transition. 5. the certificate of safe operation of lifting operation does not complete within the allotted time, shall renew the certificate of safe operation of lif
42、ting. 6. in the event of relevant meetings, breaks, night work and other special reasons, that corresponds to the job ticket must be issued after approval, the personnel and, other officers will be to replace 7. two promissory notes, exchange equipment Management Department, head of the stock exchan
43、ge operation. 8. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. Temporary power supply operation management system, to ensure that the companys safety, strengthen management of temporary electrical safety, avoid personal electrical shock, fire,
44、explosion and electrical hazards, safe, regulate electricity system is formulated. II, scope of application apply to temporary power of company-wide operations and foreign construction electric work. Third, the contents and requirements (a) temporary electrical safety requirements 1. Temporary elect
45、rical work must apply for temporary power operating license, no temporary power operating license are not allowed to work. 2. distribution boxes, metal boxes, metal switch box installation and electrical normal uncharged metal base, shell must do to protect, such as zero, zero and the zero line shou
46、ld use a separate Terminal Board connections. 3. temporary electricity switchboard, distribution boxes with numbers and measures rain, lighting, must be able to secure close switchboard door, at all levels of distribution boxes shall not be stacked within a 2 m radius of debris and rain protection m
47、easures. 4. each electrical device must have “a machine, a gate, a leak and a box“ System. Switch box and the horizontal distance control of fixed electrical equipment should not be more than 3 meters, the protector should match the capacity under the control of the device. 5. when a temporary elect
48、ric lines overhead, cannot use bare wires, aerial height shall not be less than 2.5 m in the device, outside of not less than 3.5 metres, crossing roads shall not be less than 5 m; reliable protection measures are required when crossing a road, is strictly prohibited in the trees or on scaffolding e
49、rected temporary power lines. 6. underground lines must be installed “to the flag“ and safety signs. Cables shall be not less than 0.7 meters deep, through roads likely to be lots of mechanical injuries should take protective sleeve, cover plate, and so on. 7. portable lighting, places such as basements, metal containers, wet, when you must use a safe voltage up to 36V. Transformer 36V prohibited the use of . 3. the temporary electrical permit 30KW or more issued by the engineering equipment management, 30KW electric Management Department opened in four copies, a Security M