r二灰碎石道路基层施工方案.doc
《r二灰碎石道路基层施工方案.doc》由会员分享,可在线阅读,更多相关《r二灰碎石道路基层施工方案.doc(12页珍藏版)》请在三一文库上搜索。
1、project task list system by a competent Builder to open the task list for job team, written the days production and complete the tasks time and meet the quality standards. Consumed materials production tasks, open project task lists while picking the open limit to control the material requisition nu
2、mber, picking the material according to limit issuing material to the operations team. Operations team task required to complete the task, the builder checks whether the task is complete to meet the requirements, quality inspection quality compliance, check whether the material consumption of materi
3、als beyond the fixed requirements, and process operating under the team project. Operations team each week with the engineering tasks of checking procedures in place for settlement. 3.6 project concealed works of system testing, acceptance of the three-tier system: the team from inspection-project q
4、uality testing-our quality inspection. Three levels of acceptance before the engineer test. New technologies inspection, must be approved by the Chief Engineer . Officer for check acceptance, through the layers of quality control to ensure that the project meets quality standards. 3.9 breach of cons
5、truction regulations, construction techniques according to the person in charge of construction quality accident reporting system specifications, design and construction process guide the construction personnel, shall not be an illegal command. The operator must operate in accordance with the releva
6、nt norms and regulations is, not brutal construction. Construction managers found that the operators violated the construction specifications, be stopped immediately, and report technical leader, urged the operator immediately corrected. Quality accident on violations of construction rules, and size
7、, as appropriate, timely escalation the company, management and owners and record in writing reports. Quality the right to stop any violations of construction quality accident of construction can occur. 3.10 summary quality improvement system for a week on a regular basis the quality of construction
8、 of the project for a comprehensive measurement and evaluation, the use of statistical techniques in quality scientific statistical methods, identifying the principal contradiction. To find out the major quality problems and quality problems by the relevant departments to seriously study, find out w
9、ays to solve the quality problems and take corrective and preventive action. 3.11 quality rewards companies for projects, construction crews and other layers of quality responsibility documents signed, linked with the economy. Clear rewards and punishments, strictly cash. 3.12 quality return system
10、to track the quality of completed operations, monitoring, and problems with corrective action in a timely manner, and recorded for analysis in order to improve the experience for the future construction level. 4, quality control system:sistema de carreteres daccs dexpropiaci de terrenys, evitant ver
11、dures i matries primeres, per la qual es cases van resultar inundades i drenatge de la carretera i matries desprs de la finalitzaci daccs. 9.3.2 desplegament de planificaci de construcci de drenatge basat en directrius de construcci combinada drenatge daiges avall daigua riu amunt drenatge requisits
12、 Sinotrans per la facilitat de moviments de terra maquinria complet-1 1-1#-drenatge 13 # pous Wan Jia Lai carretera, canonades de drenatge establint connexi 9.3.3 reforat amb tubs de drenatge de formig. Aquesta fuga de formig armat de projecte sn tots els tubs en dimetres superiors d1000mm, aquesta
13、secci principalment d1200 formig armat canonada, longitud 1003m, ubicat en la barreja carril a ambds costats. (1) tecnologia construcci dexcavaci de rasa (2) del formig armat drenatge tub flux: excavaci de rasa de canonada per tall obert construcci, profunditat de solc cuneta en lmbit del projecte n
14、o superava els 5M, excavaci excavaci de tots els nivells en lmbit del projecte, segons la situaci real del sl segons les disposicions per a lamplada excavaci i construcci pendent de seguretat rasa. Com a resultat desfavorables condicions geolgiques i excavaci cara no s suficient, hauria daugmentar e
15、l suport boca per garantir la seguretat de la construcci, excavaci tipus com excavaci de rasa i suport de diagrama de nivell de la secci. Abans de lexcavaci de rasa excavaci i secci de suport indiquen el nivell de claveguera, ha de fer abans de la sortida aiges avall ms gran oleoducte prospecci supe
16、rficial identificar elevaci i dimetre de la canonada s coherent amb el disseny, com ara la discrepncia notificar immediatament les parts rellevants com solucions de disseny. Excavaci de rasa, mesura estrictament control alada, excavaci mecnica a lelevaci final sobre 20cm, parada de mquina, dissenyat
17、 per neteja manual a lalta per evitar excessivament. Groove sl substrat per prova de penetraci dinmica: si no pot arribar el disseny requisits de crrega, podria considerar-se durant lompliment de grava graduada o enfortir soterrani (ampliaci i refor) per complir els requisits de disseny. Trinxera fo
18、ns vores 30cmx30cm conjunt temporals Drens, cada conjunts secci el drenatge ben episodi de rases a banda i banda, assegurar que els solcs no sn daigua. Ranurat en lloc, desprs de completar el test dautoavaluaci per assolir els estndards, propietaris i altres supervisi personal pertinents, supervisi
19、de qualitat, inspecci i compleix els requisits, immediatament va posar sorra pis base o abocament de formig. (3) petit, canonada de seguretat: canonada daigua mtode dinstallaci de three-in-one, que posant una base plana pis base desprs dassolir el 70% de fora de canonades de formig, formig canonada
20、abocant interfcie, tres processos contnuament. Tub servir centre de gesti frontera control seguretat, amb lelevaci elevaci controlIn order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safe
21、ty accidents, follow the prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions, make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of President security work leading group. The h
22、ead teacher to the leadership team is responsible for, implementation of the accountability system. 2, school monthly student knowledge about safety education, education should be diversified in the form every safety education for students of classes per week should be targeted. To carry on emergenc
23、y issues dealing with education in General, self-help and mutual rescue knowledge. Emergency calls (such as 110, 119, 122, 120, and so on) use common sense in education. 3, the establishment of major accident reporting system. School students report major accident within an hour of education; studen
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 碎石 道路 基层 施工 方案