x消防水池工程施工质量验收分项分部.doc
《x消防水池工程施工质量验收分项分部.doc》由会员分享,可在线阅读,更多相关《x消防水池工程施工质量验收分项分部.doc(33页珍藏版)》请在三一文库上搜索。
1、2, responsible for fire analysis and enter the Tower, tanks of gas metering and analysis data reported to the authorities. 3, responsible for accident investigation, statistics and reporting work. 1 electrical safety responsibilities, conscientiously study and abide by the safety rules and regulatio
2、ns, in strict compliance with the prohibitions and provisions of safety, perform guard duties. 2, before the operation, wear appropriate PPE, implement security measures, issuing safety permits, inspection tools, instruments are in good condition. 3, any electrical appliance without inspection, shal
3、l be deemed to have access to electricity, is forbidden to touch. 4, electrical maintenance, you must stop, cut off power, and hang up the no close warning signs before they can work. 5, good job in electricity, maintenance records, easily lead to key parts of ongoing supervision and inspection of t
4、he accident. 1. safety advance teams and individuals, by the workshop (Department) to fill in the security work incentive assessment report production technology section, approval approval of the company led by. 2. Advanced shop by production technology section to complete the work of reward and pun
5、ishment assessment form, company leaders executed. 3. with regard to personnel and Unit Awards, presented by the workshop and team, the security sector review, reported that the companys leadership approved for implementation. V, annex 1, from the date of approval of the system implementation. Secti
6、on I of the sixth chapter of carbon safety regulations on rewards and punishments discipline 1th late, leave early, absence from work, according to the Department of business administration and the Ministry of personnel issued the assessment methods perform. 2nd during the depressed, sleepy, found o
7、ne evaluation responsibility for 50 Yuan. 3rd strictly comply with normal leave program while off duty and simulation system, no special circumstances non-compensatory time off and overtime compensation without permission and phone calls leave and so on. 4th pre-shift and post-shift system strictly,
8、 not routine leave that fails to participate, each assessment 30. 5th before I go to work not to drink, where to work after drinking, ordered to rest, treated as lay-off in this class. 6th during work to maintain a good state of mind, self and work-related things, offender assessment 20 Yuan. No lac
9、k of concentration during the 7th stocktaking, to talk to others, engaged in work not related to stocktaking, found a check 30 yuan, in January found that more than two in a row, evaluation responsibility 100, charge 50 Yuan. 8th rigid equipment patrol inspection system, inspection should be control
10、led within an hour or so of time, late or inspection are not serious, equipment defects not found in time, each assessment 30. 9th in the class go out without permission is strictly prohibited. Failure to perform normal leave out, according to the time length of assessment 30 yuan, more than 30 minu
11、tes as truant. Employee absenteeism, a deduction of wages this month 20%. Chain gang during the 10th non-work, found gang assessment 30 yuan. 11th respect for分项工程质量验收记录编号:0803010101 表3.0.18-3单位(子单位)工程名称七里嘎山风电场49.5MW工程升压站附属建筑及室外工程(消防水池)分部(子分部)工程名称地基工程(定位及高程控制)检验批数1施工单位佳木斯新第一建筑工程有限责任公司项目经理曹宇成项目技术负责人谢秋
12、生分包单位/分包单位负责人/分包项目经理/序号检验批及部位、区段施工单位检查结果监理(建设)单位验收结论1消防水池单位工程定位放线自检合格检验批验收记录完整性核查施工单位检查结果 自检合格项目专业质量检查员:项目专业技术负责人: 年 月 日监理(建设)单位验收结论专业监理工程师:(建设单位项目专业技术负责人) 年 月 日分项工程质量验收记录编号:0803010201 表3.0.18-3单位(子单位)工程名称七里嘎山风电场49.5MW工程升压站附属建筑及室外工程(消防水池)分部(子分部)工程名称地基工程(土石方工程)检验批数1施工单位佳木斯新第一建筑工程有限责任公司项目经理曹宇成项目技术负责人谢
13、秋生分包单位/分包单位负责人/分包项目经理/序号检验批及部位、区段施工单位检查结果监理(建设)单位验收结论1土方开挖自检合格检验批验收记录完整性核查施工单位检查结果 自检合格项目专业质量检查员:项目专业技术负责人: 年 月 日监理(建设)单位验收结论专业监理工程师:(建设单位项目专业技术负责人) 年 月 日分项工程质量验收记录编号:0803010202 表3.0.18-3单位(子单位)工程名称七里嘎山风电场49.5MW工程升压站附属建筑及室外工程(消防水池)分部(子分部)工程名称地基工程(土石方工程)检验批数1施工单位佳木斯新第一建筑工程有限责任公司项目经理曹宇成项目技术负责人谢秋生分包单位/
14、分包单位负责人/分包项目经理/序号检验批及部位、区段施工单位检查结果监理(建设)单位验收结论1土方回填自检合格检验批验收记录完整性核查施工单位检查结果 自检合格项目专业质量检查员:项目专业技术负责人: 年 月 日监理(建设)单位验收结论专业监理工程师:(建设单位项目专业技术负责人) 年 月 日分项工程质量验收记录编号:0803020101 表3.0.18-3单位(子单位)工程名称七里嘎山风电场49.5MW工程升压站附属建筑及室外工程(消防水池)分部(子分部)工程名称水池结构(钢筋混凝土结构)检验批数1施工单位佳木斯新第一建筑工程有限责任公司项目经理曹宇成项目技术负责人谢秋生分包单位/分包单位负
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 消防 水池 工程施工 质量 验收 分部
链接地址:https://www.31doc.com/p-2056071.html