y镇江万科抗裂防渗漏设计施工方案2008.3.doc
《y镇江万科抗裂防渗漏设计施工方案2008.3.doc》由会员分享,可在线阅读,更多相关《y镇江万科抗裂防渗漏设计施工方案2008.3.doc(22页珍藏版)》请在三一文库上搜索。
1、1.to the head person in charge, charge 50 Yuan, head of biotech Chief, Chief of the 50 Yuan, company manager of 100 Yuan. 66th water, gas, electricity, oil theft, unit leader, head, Chief, head of biotechnology, each of 500 Yuan, competent leader 1000 Yuan. The 67th running water, gas, electricity,
2、oil, risking serious can or cannot be adjusted according to the actual needs of the time wasted, found an assessment responsible unit head of biotech Chief, Chief of the 500 Yuan, competent leader led 500 Yuan 1000 Yuan, in charge of the company. Nineth day carbon company incentives 68th incentives:
3、 for employees of one of the following achievements should be rewarded: rationalization proposals were adopted by the company and to receive benefits. In production, scientific research, technical aspects of design, improving working conditions, invention, improvement, achieving significant results.
4、 The introduction of new technologies, upgrading equipment to achieve results. Inspections found that major equipment defects and potential rewards. Note way, eliminating equipment major defects or otherwise contributing to the safety. Huairenhuaishi of courage to expose damage, theft of public prop
5、erty and to the detection of service personnel. Saving energy, repair and recycling, contributing staff. Improving enterprise management, improve economic efficiency has made remarkable achievements and contribute more to the company. Protection of public property, prevent or save power, the company
6、 benefits from significant losses. Consistently loyal, active and responsible, integrity, self-sacrifice, outstanding deeds. Struggle with bad people and bad things to maintain the normal order of production and work order, maintenance of public order, there was a significant achievement. Production
7、 index in competitions, achieved the position of teams or individuals. 69th awards program will award application for newspaper production technology section. Production technology section in accordance with signed opinions submitted to the competent leadership for approval. Production department or
8、 directly to the company leadership and Management Department reports on reward units and individuals.Party branch Secretary of a party lecture of two speeches: tutoring covers all of the new party Constitution two education has kicked off. Study of the Constitution of this practice is a very import
9、ant part. Today Ill give you a new section of the Constitution on the counselling of learning lessons, hope, through todays tutorial, further consolidation of all the party members of the new party Constitution study results to help you better understand and grasp the important knowledge in the new
10、Constitution. This tutorial has the following three components: one is the importance of studying and implementing of the new party Constitution; second, compared with the 17 adopted by the party Constitution, the main changes in the content and interpretation of the new Constitution; the third is a
11、t this stage how to make full use of the new essence of the content of the Constitution to guide party building. Two thematic education in party lecture notes, and study and carry out the significance of the new Constitution (a) studying and implementing the party Constitution is the most basic obli
12、gations of each party member. We party party yilai, has been put learning implement Constitution as a items regular of work one of implement Yu always, and in different history background and the different reality need of situation Xia, also will as a items important sex work, concentrated to, and h
13、ighlight to, and separate to be arrangements, only on reform more than 30 years to, most important of concentrated learning implement Constitution on has four times: (ii) learning implement Constitution, is maintenance party of solidarity unified, and completed party of the task of strong guarantee.
14、 Both history and reality show that only determined to uphold the supremacy of the Constitution, according to the educational management of party members and cadres at the request of the party Constitution to ensure the party strictly implement the partys policy and discipline, to maintain party uni
15、ty, completed the partys various tasks to provide a strong guarantee. (C) studying and implementing the party Constitution, consolidating the partys ruling status, and the inevitable requirement of maintaining the advanced nature of the party. Comrade XI Jinping pointed out: the Constitution is the
16、fundamental law of the party, the party must follow the General rules. In all the activities of the party organization at all levels, will continue to guide the broad masses of party members and cadres, especially leading cadres, conscientiously study the party Constitution, abide by the party Const
17、itution, the implementation of the party Constitution and maintaining party Constitution, should strengthen party spirit, enhance the consciousness, purpose awareness, power awareness, situation awareness, sense of responsibility, earnestly sharing sorrow for the party, responsible for the country,
18、for the people and dedication. (D) studying and implementing the party Constitution, is to solve the problems the partys actual needs. Comrade XI Jinping said all party members must achieve, leading cadres should first do whatever the上海家树建筑工程有限公司目 录一、工程概况11、现场地块概况12、工程实体概况1二、防渗漏重点2三、屋面防裂防渗漏方案31、设计方案
19、32、施工方案4四、外墙防裂缝防渗漏方案71、材料保证72、施工方案7五、塑钢门窗防渗漏方案111、材料保证112、施工方案11六、厨卫间防渗漏方案121、设计方案122、施工方案12七、全装修工程防渗漏方案14八、质量保证措施151、事前控制172、质量过程管理173、人员管理174、事后验收17九、质量检验方案171、屋面泛水渗漏的检验方法172、门窗喷淋试验173、雨天防水工程验收174、穿屋面、楼地面立管和落水头处渗漏检验175、卫生间地坪盛水试验18一、工程概况工程建设概况一览表 表2-1工程名称镇江万科红郡二期项目工程地址镇江市檀山路与蛋山北路、交汇南侧地块建设单位镇江润桥置业有限
20、公司设计单位南京市民用建筑设计研究院有限公司勘察单位江苏省岩土工程勘察设计研究院受监单位监理单位工期300日历天建筑面积18000 m2合同造价万元总承包单位上海家树建筑工程有限公司桩基分包单位1、现场地块概况镇江万科红郡二期项目位于镇江市檀山路西侧,蛋山北路南侧,场地原为小土山和部分民房,地势东高西低,局部土山已挖平,15#、16#、10#、11#、18#楼已具备施工条件。应甲方要求先开工15#楼,其余等甲方书面通知再决定。本工程由九幢错落分明的联排公寓、景观绿地、市政道路、停车场组成。气候特点:镇江市位于长三角,属于亚热带季风气候,具有冬冷夏热、四季分明,温差较大的特点,夏季多雨,平均年降
21、水量在1000左右。2、工程实体概况本工程总建筑面积约为18000,由九幢三层联排公寓组成。采用钢筋混凝土框架结构体系(局部剪力墙结构)。地下室层高2.60m,一层层高3 m,二层层高3.0 m,三层层高3.06.123 m,总高12.123m,檐口高9.7 m,屋脊高12.88 m。基础结构:采用承台伐板基础。主体结构:全部采用钢筋混凝土框架(局部剪力墙)结构体系。结构混凝土强度等级如下表:楼层标高构件强度等级抗渗系数地下室-3.20底板、承台、基础梁C30S6半地下室外墙C30S6半地下室内墙、柱、梁、板C30一层以上0.0012.88墙、柱C30梁、板C30其他基础垫层C15构造柱、圈梁
22、、过梁、压顶梁C20钢筋采用HPB235级、HPB335级、HRB335和HRB400钢筋,预埋件钢板采用Q235-B板,吊钩、吊环均采用HPB235级钢筋。HPB235钢筋采用43XX型,HRB335、HRB400钢筋采用50XX型,钢筋与型钢焊接按钢筋定焊条。0.00以下与土壤接触或处于潮湿环境的砌体采用MU15混凝土普通砖,M10水泥砂浆砌筑。0.00以上采用250、200、100厚粉煤灰加气混凝土砌块(容重7.0Kg/m3,强度3.5N/mm2),顶层和女儿墙用M7.5混合砂浆,其他层采用M5.0混合砂浆砌筑。外墙采用200厚砼空心砖砌筑,20厚1:3防水水泥砂浆找平层,专用粘结剂粘结
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 镇江 万科抗裂防 渗漏 设计 施工 方案 2008.3
链接地址:https://www.31doc.com/p-2057204.html