合成高分子防水卷材防水层施工工艺(1004-1996)(Construction technology of waterproof layer for synthetic polymer waterproof roll (1004-1996)).doc
《合成高分子防水卷材防水层施工工艺(1004-1996)(Construction technology of waterproof layer for synthetic polymer waterproof roll (1004-1996)).doc》由会员分享,可在线阅读,更多相关《合成高分子防水卷材防水层施工工艺(1004-1996)(Construction technology of waterproof layer for synthetic polymer waterproof roll (1004-1996)).doc(13页珍藏版)》请在三一文库上搜索。
1、合成高分子防水卷材防水层施工工艺(1004-1996)(Construction technology of waterproof layer for synthetic polymer waterproof roll (1004-1996))2.1 materials and requirements:2.1.1 synthetic polymer coil:2.1.1.1 three yuan EPDM rubber waterproofing membraneSpecifications: thickness l.2mm and 1.5mm, length 20m, width 1m;T
2、echnical performance: see table 10-9Table three performance of EPDM rubber waterproofing membrane 10-9Project performance indexTensile strength (MPa = 7)Fracture elongation (%) = 450The thermal aging retention rate of elongation (%) = 70(80 + 2 C, 168h) tensile strength (%) = 80Low temperature, cold
3、 and crisp humidity (DEG C) below -40 centigradeWatertightness (MPa * min) = 0.3 x 302.1.1.2 Dian CPE sweat Pennant wave Luan Yu G?Specifications: thickness l.2mm, 1.5mm, length 20m, width LM, 2m;Technical performance: see table 10-10.Properties of chlorinated polyethylene rubber common temperature
4、waterproof membrane 10-10Project performance index adhesiveTensile strength (MPa = 7.36)Elongation (%) = 450Low temperature flexibility (DEG C) below -30Watertightness (MPa * min) 0.3 * 302.1.1.3 chlorinated polyethylene waterproof rollSpecifications: thickness l.2mm, length 20m/ rolls, width 0.9m;T
5、echnical performance: see table 10-11.Properties of chlorinated polyethylene waterproofing membrane 10-11Project performance indexTensile strength (MPa = 9.8Elongation (%) = 10Watertightness (MPa * h) 0.3 * 2Thermal aging (DEG * h) 100 * 720h, strength does not decreaseLow temperature (DEG) -30 DEG
6、C, no crack around Phi 10mmNote: the synthetic polymer membrane shall meet the requirements of GB 12952, 2, GB 12953, 1, HG 2402, 2. And comply with the design requirements, factory and retest qualified certification materials.2.1.2 synthetic polymer waterproof roll material selection see table 10-1
7、2.Material selection table for synthesis of molecular waterproof coiled material l0-12Three EPDM waterproofing membrane supporting materials using chlorinated polyethylene Dian Luan? Blended waterproof coiled material using chlorinated polyethylene waterproof coiled material used1. primer polyuretha
8、ne component B xylene diluent polyurethane coating dilution or emulsion coating spraying dilute binder of ethyl acetate: gasoline (1: 1)2. basic CX-404 glue glue or adhesive CX-404 LYX-603-3 409 adhesive glue, light yellow transparent viscous liquid, peel strength is not less than 20N/2.5cm3. roll s
9、eam adhesive butyl rubber adhesive component B or one component of butyl rubber adhesive chloroprene rubber adhesive system CX-404 CX-401 LYX-603-2 glue adhesive, gray sticky liquid transfer, peel strength of 25N/2.5cm4. enhanced sealant polyurethane sealant (a, b) polyurethane sealant polyurethane
10、sealant5. stain for roofing coloring (silver grey) paint, coloring paint (silver grey), coloring paint (silver grey)6. self vulcanizing adhesive tape, butyl tape or other rubber tape2.2 main machines and tools:2.2.1 electric mixer, high pressure blower.2.2.2 iron roller, pressure roller, pressure ho
11、lding, Xiaoping shovel, bucket, gas burner, scissors, steel tape, broom, small line, color powder, chalk.2.3 operating conditions:2.3.1 review the drawings before construction, and prepare the roof waterproof construction plan,And technical disclosure. The roof waterproof project must be certificate
12、d by the professional construction team.2.3.2 paving waterproof layer of the base must be completed construction, and after maintenance and drying, waterproof layer should be cleared before the construction of grass-roots surface, and at the same time grass-roots acceptance, qualified before the con
13、struction of waterproof layer.2.3.3 grass slope should meet the design requirements, no hollowing, cracking, sanding, peeling and other defects; the moisture content should be less than 9%.2.3.4 waterproof layer construction, according to the design requirements, ready to coil and supporting materia
14、ls, storage and operation should be far from the fire source, to prevent accidents.3.1 process:Base cleaning; brushing the base treatment agent; adding additional layer construction; coating the surface of the coil and the base layerThe laying of materials, winding head, bonding, sealing of coil joi
15、nt, storage of water test, protection layer3.2, clean the grassroots: Construction of waterproof layer before the acceptance of the grass-roots surface cleaning. Dust, debris and other defects affecting the quality of waterproof layer shall not be allowed.3.3 brushing base treatment agent: coating p
16、olyurethane bottom adhesive.Preparation of 3.3.1 adhesive polyurethane outsole: polyurethane material according to a: B =1: 3 (weight ratio) ratio, stirring evenly coated by polyurethane material construction; also can according to a: B: xylene =1: 1.5: 1.5 ratio, stirring and coating construction.3
17、.3.2 polyurethane adhesive coating: large area coating, paint brush bottom glue in the corner, Guan Gen and outfall details such as complex parts evenly over polyurethane adhesive. Then use a long roll brush to brush in a large area. Xu brush bottom rubber (equivalent to cold base oil), thickness sh
18、ould be consistent, shall not have brush, gray and other phenomena.The 3.4 part: the construction of additional layers of yin and Yang, Guan Gen and outfall must first do an additional layer, using self adhesive or sealant polyurethane coating, can also be paving a layer of synthetic polymer waterpr
19、oofing materials. Should be determined according to the design requirements.3.5 coil and base wheat surface coating:3.5.1 coil surface coating: the coil spread on a clean base, with long rolling brush dipped in CX-404 rubber, roll evenly. Should be left to overlap parts, not glue, and the edge of th
20、e head vacated 100mm.The adhesive coating thickness should be uniform, there shall be no leakage or condensation of substances; membrane gelatinize 10 20min after static drying, when the finger is not sticky, raw material barrel will glue surface outward rolled up, flat head end roll, roll stiffness
21、, diameter should not be a big head, a head small, and to avoid getting involved in the sand and debris, keep clean.3.5.2 surface is coated with adhesive glue: after drying, the surface coating of CX-404 glue, with long brush dipped in CX-404 glue, not in a repeated brushing, prevent the formation o
22、f sticky glue or since the end of condensation, the detail position can brush evenly, static dry paving material.3.6 coil laying: coil and base have been coated with glue, basically dry (hand touch non stick, general 20min or so), you can do paving, coil construction. The number of plies and thickne
23、ss of the coil shall comply with the design requirements.3.6.1 membrane should be parallel to the roof from the eaves covered slope, two-way flow sheet lap should shun the direction of the water flow, lap width long side and end, such as empty shop, sticky, sticky, are 100mm; fully adhered method wa
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 合成高分子防水卷材防水层施工工艺1004-1996Construction technology of waterproof layer for synthetic polymer roll 1004-1996 合成
链接地址:https://www.31doc.com/p-2059163.html