哈尔滨市建设工程抗震设防和抗震加固管理办法(Measures for seismic fortification and seismic strengthening management of construction projects in Harbin).doc
《哈尔滨市建设工程抗震设防和抗震加固管理办法(Measures for seismic fortification and seismic strengthening management of construction projects in Harbin).doc》由会员分享,可在线阅读,更多相关《哈尔滨市建设工程抗震设防和抗震加固管理办法(Measures for seismic fortification and seismic strengthening management of construction projects in Harbin).doc(14页珍藏版)》请在三一文库上搜索。
1、哈尔滨市建设工程抗震设防和抗震加固管理办法(Measures for seismic fortification and seismic strengthening management of construction projects in Harbin)Promulgated by the peoples Government of Harbin Municipality (promulgated by the peoples Government)19980626 (time of promulgation)19980701 (time of implementation)Decree
2、No. eighth (No.) of Harbin Municipal Peoples GovernmentMeasures for seismic fortification and seismic strengthening management of construction projects in HarbinChapter I General ProvisionsThe second chapter, earthquake resistance and disaster prevention planningThe third chapter, seismic fortificat
3、ionThe fourth chapter seismic appraisal and reinforcementThe fifth chapter is examination and approval and supervisionThe sixth chapter, legal responsibilityThe seventh chapter is the supplementary provisionsIn accordance with the decision of the peoples Government of the Harbin Municipality on 13 g
4、overnment regulations and normative documents on Amending the measures for the administration of the safety of the winter on the river in Harbin, the present Measures shall be amended as follows:(1) the fourteenth paragraph of the two paragraph is revised as follows: the construction, construction a
5、nd reconstruction of major construction projects and serious secondary disasters may be carried out, and the seismic safety assessment shall be carried out. The construction unit shall, in accordance with the results of seismic safety evaluation, determine the seismic fortification requirements and
6、carry out seismic fortification.(two) the twenty-fourth article is revised as follows: in the preliminary design document of the newly built, expanded or rebuilt project, there must be an earthquake fortification section.Chapter I General ProvisionsThe first is to strengthen project seismic and seis
7、mic strengthening construction management, prevention and mitigation of earthquake disaster, according to the relevant provisions of the Peoples Republic of China earthquake disaster prevention law and other national and provincial, combined with our situation, formulated.Article second these Measur
8、es shall apply to the administration of seismic fortification and aseismatic reinforcement of construction projects within the administrative area of this municipality.The term seismic fortification as mentioned in these Measures refers to the design and construction of new construction, expansion a
9、nd technical renovation projects, in accordance with the codes and regulations for seismic design of the state and the province. Third.The term seismic reinforcement as mentioned in these Measures refers to the reinforcement of the existing buildings and structures in accordance with the relevant pr
10、ovisions on seismic fortification.Fourth construction projects earthquake prevention, the implementation of prevention oriented, flat earthquake approach.Fifth new construction project seismic fortification costs should be included in the capital construction investment plan. The funds needed for se
11、ismic reinforcement shall be raised by the unit itself. Special projects, such as important cultural relics, value and commemorative buildings, may be applied for special funds according to their administrative powers. In the earthquake of special funds for other purposes is strictly prohibited.Sixt
12、h municipal construction administrative departments in charge of the citys construction works seismic fortification, earthquake reinforcement work.The administrative department for construction of counties (cities) shall be responsible for the seismic fortification and earthquake reinforcement work
13、of the construction projects within the jurisdiction.The departments concerned in planning, planning, real estate, municipal administration, earthquake, etc. shall, in accordance with their respective functions and responsibilities, cooperate in the work of earthquake prevention and aseismatic stren
14、gthening and administration of construction projects.The second chapter, earthquake resistance and disaster prevention planningThe seventh city and county (city) construction of earthquake disaster prevention planning, the municipal or county (city) construction administrative departments in conjunc
15、tion with the relevant departments jointly compiled, county (city) earthquake disaster mitigation plan, approved by the peoples government at the same level after the implementation of.The plan for earthquake resistance and disaster prevention of large industrial and mining enterprises shall be orga
16、nized by the enterprise itself and incorporated into the enterprise development plan, which shall be examined and approved by the competent department, and the administrative department shall make a record of it.The contents of the eighth construction of earthquake disaster prevention planning mainl
17、y include: planning, engineering seismic damage prediction, seismic zoning, earthquake lifeline engineering, building engineering facilities and equipment and reinforcement, earthquake disaster prevention, earthquake site layout and evacuation road arrangements, repair plans and other emergency resp
18、onse and emergency engineering earthquake.Lifeline engineering as mentioned in the preceding paragraph refers to such projects as power supply, water supply, air supply, heating, transportation, communication, medical and health care, fire control, food and so on.The ninth city and county (city) con
19、struction of earthquake disaster prevention plan, by the municipal or county (city) construction administrative departments and other relevant departments in accordance with the city and county (city) earthquake disaster prevention planning, and incorporated into the city and county (city) urban con
20、struction plan.The tenth city and county (city) construction of earthquake disaster prevention planning, by the municipal or county (city) construction administrative departments in conjunction with the relevant departments jointly organized and implemented; large construction projects of industrial
21、 and mining enterprises, earthquake disaster prevention planning program, implemented by the organization.Eleventh, in the urban construction planning, for the earthquake may cause serious secondary disaster new projects, not in the city site location; already built in urban areas, should be combine
22、d with urban transformation and gradually move out.Construction projects which may induce serious secondary disasters by the preceding paragraph of this article, refers to the construction project after the earthquake damage may lead to flood, fire, explosion, hypertoxic or strong corrosive material
23、s leakage and other serious secondary disasters, including dams, dikes and storage, storage, storage of flammable and explosive toxic or corrosive substances the engineering facilities and other potentially serious secondary disasters.The third chapter, seismic fortificationTwelfth, in the town plan
24、ning area of new construction, expansion or reconstruction project, must be seismic fortification, does not meet the earthquake fortification standards of the project, not allowed to carry out construction.Room with thirteenth towns and villages, village in the construction of public buildings, the
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 哈尔滨市建设工程抗震设防和抗震加固管理办法Measures for seismic fortification and strengthening management of construction 哈尔滨市
链接地址:https://www.31doc.com/p-2059680.html