1、Construction Document施工文件DIVISION 600第600部分INCIDENTAL STRUCTURES附属结构SECTIONS 601 602 :第601 602 节 Not Used未使用SECTION 603第 603 节METAL STRUCTURES金属结构603.1 - DESCRIPTION:说明:This work shall consist of the construction or reconstruction or extension of metal underpasses, arch structures culverts and pipel
2、ines, referred to jointly as metal structures, in accordance with these Specifications and in reasonably close conformity with the lines, grades, dimensions, and locations shown on the Drawings or established by the Engineer.根据技术规范要求及图纸或工程师确定的线、等级、尺寸和位置等规定,本工程包括施工或重建或金属桥下通道延伸、拱形结构涵洞和管道系统,统称为“金属结构”。T
3、he corrugated metal underpasses have been designed generally for minimum cover over the structure. The plate thickness varies with the size of the structure.The Contractor will be required to furnish details for approval by the Engineer波纹金属桥下通道通常经过设计,可极小覆盖该金属结构。金属板厚度因结构尺寸不同而所有不同。 要求承包商提供详情,然后提交工程师批准
4、。The structures required to be designed either based on the conceptual design provided in the Drawings or as alternative designs prepared by the bidder are given in Drawings.图纸中显示了根据图纸中概念设计或投标人准备的其他设计方案等要求进行设计的结构。The corrugated metal underpasses have been designed generally for minimum cover over th
5、e structure. The plate thickness varies with the size of the structure and the fabricator.The bidders will be required to consult with their selected vendor of the product for the plate thickness for the cover circumstances in each case. The Contractor will be required to furnish details for approva
6、l by the Engineer.波纹金属地下通道的设计至少要覆盖在整个结构上板子的厚度随着结构和加工厂的规格不同而不同。投标人按照要求与其选定的产品供应商协商,以确定各种情况下覆盖用金属板的厚度。要求承包商提供详情,然后提交工程师批准。The bidders are advised that at the location of each corrugated metal structure the elevation at the top of the embankment, the vertical height of the corrugated metal structure, a
7、nd the invert/road level within the corrugated metal structure can be extracted from the Drawings.投标人熟悉图纸中所包括的各个波纹金属结构位置上的路堤顶部高程、波纹金属结构垂直高度以及波纹金属结构内部仰拱面高程/路面水平等的信息。From these dimensions the embankment cover over the top of the structure can be determined.根据此类尺寸,可确定结构顶部路堤覆盖情况。With regard to the desig
8、n standards and specifications to which the metals structures shall conform, the bidders are informed that provided that the designs and specifications shall accord with acceptable codes of practice of international repute, which do not conflict with the requirements of the bidding documents, the En
9、gineer is unlikely to reject the design. However, the decision as to the acceptability of the alternative codes of practice shall rest solely with the Engineer.对于金属结构应遵循的设计标准和技术规范而言,投标人应知悉若设计和技术规范符合国际公认且可接受的操作规程要求,且与招标文件要求不冲突,则工程师不得拒绝该设计。但是,是否采纳其他操作规程则应仅取决于工程师的决定。The Contractor shall supply the Engi
10、neer with all supporting calculations prepared by the vendor and/or the Contractor which the Engineer shall deem necessary in order to arrive at such approval or otherwise承包商应向工程师提供由供应商和/或承包商确定的、工程师视为必要的所有辅助计算,以便确定是否予以批准。603.2 - MATERIALS:材料:Materials shall meet the requirement specified in the foll
11、owing Sub-Sections of Division 700:材料应符合下述第 700章中各个子节规定的要求:MATERIAL材料SUB SECTION子节Metallic Coated Corrugated Steel Pipe or Pipe Arch金属覆层波纹钢管或管拱713.2Fibre Bonded Full Bituminous Coated and Paved Invert Corrugated Steel Pipe胶合纤维全沥青涂层和铺面的仰拱波纹钢管713.2Bituminous Coated and Paved Invert Corrugated Steel Pi
12、pe or Pipe arch沥青涂层和铺面的仰拱波纹钢管或管拱713.3Full Bituminous Coated and Full Paved Corrugated Steel Pipe全沥青涂层和全铺面的波纹钢管713.4Fibre Bonded Full Bituminous Coated Corrugated Steel Pipe胶合纤维全沥青涂层的波纹钢管713.5Fibre Bonded Full Bituminous Coated Corrugated Steel Pipe Arch胶合纤维全沥青涂层的波纹钢管管拱713.5Fibre Bonded Full Bitumino
13、us Coated and Paved Invert Corrugated Steel Pipe Arch胶合纤维全沥青涂层和铺面的仰拱波纹钢管管拱713.5Structural Plate Pipe or Pipe Arch结构板管或管拱713.8Bituminous Coated Structural Plate Pipe or Pipe Arch沥青涂层的结构板管或管拱713.9Structural Plate Arch结构板拱713.8Bituminous Coated Structural Plate Arch沥青涂层的结构板拱713.9End Section for Corruga
14、ted Steel Pipe or Pipe Arch波纹钢管或管拱的末段713.20Bituminous Plastic Cement含沥青塑性胶泥708.9Granular Material for Culvert Bedding涵洞基床所用的粒状材料716.1.1.2Controlled Low Strength Material控制性低强度材料219Crushed Aggregate Backfill碎骨料回填704.6*Fine Aggregate*细骨料702*Fine Aggregate shall consist of crushed or uncrushed mineral
15、aggregate, which has 100 percent passing the 9.5mm sieve.*细骨料应包括碎或未碎的矿物骨料,可完全通过9.5mm 筛网。When the locations of manufacturing plants allow, the plants may be inspected periodically for compliance with specified manufacturing methods, and material samples may be obtained for laboratory testing for comp
16、liance with material quality requirements.This may be the basis for quality acceptance of manufactured lots.制造厂位置适宜时,此类工厂可进行定期检查,以便符合规定的制造方法,而且也可获得材料样本,进行实验室测试以确定是否符合材料质量要求。这可能是已加工批次产品质量验收的依据。 All materials will be subject to inspection for acceptance as to condition at the latest practicable time t
17、he Engineer has the opportunity to check for compliance prior to or during incorporation of materials in the work.工程实施中材料混合前或混合过程中,工程师伺机查验合规性的最近可行时间条件,对所有材料应进行验收检查。All references to corrugated steel pipe are considered applicable to uncoated pipe and the various combinations of coated pipes (bitumin
18、ous coated, fibber bonded, pre-coated, etc.) and paving classes (paved invert, full paved, etc.) for which the base metal conforms to AASHTO M 218 or AASHTO M 274.“波纹钢管”的所有参考值均可适用于未涂层的管材和各种已涂层管材的组合(沥青涂层、胶合纤维、预涂等)以及铺砌等级(铺面仰拱、全铺面等),其中基底金属符合美国公路和运输官员协会 M 218 或 M 274 要求。The sheet thickness for corrugate
19、d steel pipe and corrugated aluminium alloy pipe shall be as designated on the Drawings.波纹钢管和波纹铝合金管的薄板厚度应符合图纸中所述的规格。Corrugated metal pipe of 68mm by 13mm corrugation shall be furnished unless otherwise specified. Corrugated steel pipe and pipe arch with 68mm x 13mm, 75mm x 25mm and 125mm x 25mm corr
20、ugations shall be helically fabricated, except for fibre bonded pipe which may be fabricated with annular corrugations of 68mm x 13mm and 75mm x 25mm. Corrugated aluminium alloy pipe with 68mm x 13mm, 75mm x 25mm, 75mm x 25mm, and 150mm x 25mm corrugations and corrugated aluminium alloy pipe arch wi
21、th 68mm x 13mm corrugations shall be helically fabricated. Where 125mm x 25mm corrugations are specified for corrugated steel pipe and pipe arch, 75mm x 25mm corrugations may be substituted.应提供68mmx13mm 的波纹金属管,除非另有规定。68mm x 13mm、75mm x 25mm 和 125mm x 25mm的波纹钢管和管拱应按照螺旋绕法制造,但68mm x 13mm 和 75mm x 25mm环
22、形波纹制造的胶合纤维管除外。68mm x 13mm、75mm x 25mm、75mm x 25mm和 150mm x 25mm的波纹铝合金管和68mm x 13mm的铝合金管拱应按照螺旋绕法制造。若波纹钢管和管拱的波纹指定为 125mm x 25mm,则可取代75mm x 25mm的波纹。603.2.1 - QUALITY CONTROL TESTING:质量控制测试:Quality control of the fine aggregate, granular material and crushed aggregate backfill is the responsibility of t
23、he Contractor.承包商应负责细骨料、粒状材料和碎骨料回填的质量控制。Acceptance for gradation will be on the basis of the Contractors written certification that all such material used for this conforms to the specified requirements. The certification is to include the results of testing from samples obtained at a minimum freque
24、ncy of one sample per one-half day of aggregate production or stockpiling.等级验收应依据承包商的书面证明,即使用的所有此类材料符合规定的要求。证明包括按照骨料生产或存料中每半天一个样品的最低频率所获得的样品的试验结果。CONSTRUCTION METHODS施工方法603.3 - GENERAL:概述:Subject to the provisions prescribed, the flow line of a metal structure may be altered from that shown on the
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 国际 工程 FIDIC 条款 公路 施工 600 附属 要求 中英文 对照
链接地址:https://www.31doc.com/p-2060744.html