“乐清市柳市文化中心工程”大型深基础施工组织设计(1).doc
《“乐清市柳市文化中心工程”大型深基础施工组织设计(1).doc》由会员分享,可在线阅读,更多相关《“乐清市柳市文化中心工程”大型深基础施工组织设计(1).doc(31页珍藏版)》请在三一文库上搜索。
1、1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparat
2、ion of the medium-and long-term planning and control water (a) plans, and their implementation. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the abi
3、lity to resist water damage. A, b, c, grass-roots leaders, leaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no high
4、er than c, higher than d, less than 5, mine main pumping station should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in
5、mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintained at a total capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with i
6、t. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c
7、mining, after the first had the suspects will find d, excavations will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizont
8、al distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall
9、 within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the Hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole surve
10、y water should use a dedicated . Exam exam elements 1. find out the Central thesis of the article 2: identify types of arguments summarized the arguments of the main content 3. identification of the methods used in this paragraph or sentence, and its benefits. 4. (this paragraph) demonstration (proc
11、ess) what is it? 5. taste the benefits or effects of some words in a sentence. 6. for an article to add a fact or reasonable argument 7. do you agree with the author? Please explain the reasons. Argumentative is talking about as the main expression of style. Through facts and reason, use logic to sh
12、ow that the authors views and attitudes to an issue and analysis on some phenomenon of insights and ideas. Three elements of argumentation elements: argument 1, argument: argument: authors opinions, views and ideas. (Right, distinct) Note: essays generally have only one argument, some around the cen
13、tral argument put forward several arguments, arguments are used to justify central argument. Find argument of method: a to see articles of title II to note argument in articles in the of location title reveals; b beginning proposed; c talk process in the sharp proposed; d end antibody; articles in t
14、he no proposed, needed readers himself antibody note distinguish topics and argument: topics is talk paper by to described of main content, and argument is author on by described of content by made of clear of judge of sentences. 2, looking for or refine the method arguments: (a), see topic (b), sta
15、rt (c), end (four), middle (five), his induction an honest man is always suffer? in the dark old days of corruption, honest people suffer is not surprising, even commonplace. However, with the development and progress of society, honest man suffer losses no longer become a common and normal phenomen
16、on. Dishonest people may be proud of a moment, but ultimately the expense of them. As Lu Xun said leasing will also drown his own. Illusion and lies was uncovered the day liar He Yan people? some flattery, speculative hack who soon would be appreciated by a boss, but he would always ride it? the say
17、ing goes: “clever to be wise“ dishonest people ultimately have to pay the price for his dishonesty. Overall, or doing an honest man does not suffer. This argument is an honest man does not lose exam: argument is that how come? Introduction of arguments: (1), straight to the central argument put forw
18、ard. For example: on the backbone of the proposed opening of “we Chinese are proud of“ (2), ask questions, add a central argument. For example: of the thinking and doing for “dreams“ and “death“ of the arguments. (3) cases, according to the experience of a life point (4), draws from the story proble
19、ms, arguments (5), the central argument put forward in some way. For instance, metaphor, comparing elements of the second: the arguments argument: the material to prove point. (Authentic) 1, argument type facts .宜顺论文网宜顺论文网 www.13Lwww.13L 摘要摘要 拟建项目“乐清市柳市文化中心”总建筑面积 35476.6m2,工程桩基 采用钻孔灌注桩,地下室二层,基坑开挖深度
20、9.3509.950m。 该工程特殊的地质及气候条件,对深基础的施工提出了较高的要求, 本施工组织设计通过对工程各方面情况通盘考虑,从施工部署、主要分 布分项施工工方法和措施、施工进度计划、资源供应计划、技术组织措 施、环境及职业健康安全管理目标及措施、工程协调等方面进行论述, 使工程施工在一定时间和空间内,得以有计划、有组织、有秩序地进行, 以达到工期短、质量优、成本低、效益好的效果。 关键词:关键词:深基础,施工方法,进度计划,组织措施 2 目目 录录 一、绪一、绪论论1 二、工程目标二、工程目标2 (一)工程质量目标 .2 (二)工期目标 .2 (三)安全文明施工目标 .2 三、施工准备
21、三、施工准备2 (一)技术准备 .2 (二)施工机具准备 .3 (三)劳动力准备 .3 (四) 施工现场准备3 四、主要分部、分项工程施工方法和技术措施四、主要分部、分项工程施工方法和技术措施3 (一)钻孔灌注桩工程 .3 (二)基坑支护工程 .5 (三)土方工程 .8 五、施工进度计划五、施工进度计划11 (一)工程目标 .11 (二)施工网络进度计划 .11 (三)进度保证组织及技术措施 .11 六、施工总平面布置六、施工总平面布置12 (一)场地使用计划安排 .12 (二)现场周边围界的设置 .12 (三)现场进出口的布置 .12 (四)办公区、生活区和施工区的划分 .13 (五)施工区
22、设施的布置 .13 七、资源供应计划七、资源供应计划13 (一)施工机械设备配置计划 .13 (二)周转材料配置计划 .14 (三)劳动力计划 .15 (四)投入本工程流动资金 .15 八、技术组织措施八、技术组织措施15 (一)质量组织保证措施 .15 (二)确保质量技术措施 .16 (三)进度保证措施 .17 (四)合同措施 .18 (五)信息管理措施 .18 (六)确保安全生产、文明施工的技术组织措施 .18 九、环境及职业健康安全管理目标及措施九、环境及职业健康安全管理目标及措施20 宜顺论文网宜顺论文网 www.13Lwww.13L (一)安全管理 .20 (二)施工用电 .21 (
23、三)施工机械 .21 (四)危险用品 .21 (五)坍塌事故 .22 (六)杜绝职业病 .22 十、节能环保内容:节能低碳十、节能环保内容:节能低碳22 (一)节能减排准备 .22 (二)节能减排原则 .23 (三)节能减排实施 .23 十一、工程协调十一、工程协调24 (一)总分包工程协调与管理 .24 (二)总承包外部协调关系措施 .25 参考文献:参考文献:26 0 “乐清市柳市文化中心工程乐清市柳市文化中心工程”大型深基础施工组织设计大型深基础施工组织设计 一、绪论一、绪论 深基础工程,按照中外工程界学术界的共识,主要是指桩基及基坑工 程两大范畴。前者为上部结构提供可靠的支承,后者为开
24、发利用地下空间 提供安全保障。进入 21 世纪 10 多年来,我国深基础工程取得了巨大成就, 成功地研发了适用于不同地质条件、不同工程要求的一系列新桩型,其中 常用的桩型包括钻孔灌注桩、预应力管桩等。 施工组织设计就是对工程建设项目在整个施工过程中的构思设想和具 体的安排,目的是要使工程建设达到速度快、质量好、效益高。 温州地区的深基础工程,绝大部分采用桩基础, 桩基设计时多以长桩 和超长桩为主。且基坑形式多变,开挖面积越来越大,开挖深度越来深, 支护方式越来越多。 “乐清市柳市文化中心工程”作为温州地区的代表性工 程,对深基础的施工(包括桩基础及基坑支护与开挖)提出了比较高的要 求。 (一)
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 乐清市 文化中心 工程 大型 基础 施工组织设计
链接地址:https://www.31doc.com/p-2062150.html