1、synchronous backup software does not respond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be supported across networ
2、k segments. In accordance with the above requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial investment company limited
3、 factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cause of security, as well
4、 as previous security experience, combined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65M x 234
5、.24M rectangular site. 1.2 scope for such dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory could not spend a great deal of manpower cost to post thr
6、ee steps, five steps and a whistle. As we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active solid border defense work. We recommend that you use infrare
7、d radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as
8、 video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevant int
9、ernational standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. Second, the design princip
10、les of the project design follows technology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. Design elements of the system is the system
11、atic, integrated and comprehensive; design has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy, used
12、 module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, for Ch
13、ina conditions and this project of features. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the system is the system used for various management levels, i
14、ts functions are configured to provide the user with comfortable, safe, fast and convenient to3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-1998) 3.3, the code别样城四期 施工组织设计 1 编制依据及编制说明1.1 编制依据1.别样城四期工程项
15、目建安工程总承包招标文件等。2.深圳市华阳国际工程设计有限公司设计的别样城四期工程施工图及中南标相应标准图集。3.现状施工条件及场地情况;4.我司QEO(质量/环境/职业健康)管理体系的相关文件要求和经验资料;5.我司的技术装备及资源情况;6.我司类似的工程施工经验;7.公司编制实施的施工工法及中国华西建筑工程施工工艺标准;8.现行国家、广东省及惠州市现行有关文件、技术标准和验收规范,满足下列规范但不限于下列规范:(1)测量规范GB50026-2007(2)地基与基础工程施工质量验收规范GBJ50202-2002(3)砌体工程施工质量验收规范GB50203-2011(4)混凝土结构工程施工质量
16、验收规范GB50204-2011(5)屋面工程质量验收规范GB50207-2012(6)地下防水工程质量验收规范GB50208-2011(7)建筑地面工程施工质量验收规范GBJ50209-2010(8)建筑装饰装修工程质量验收规范GB50210-2011(9)建筑节能工程施工质量验收规范GB50411-2007(10)建筑给水排水及采暖工程施工质量验收规范GB50242-2002(11)建筑电气安装工程施工质量验收规范GB50303-2002(12)电梯工程施工质量验收规范GB50310-2002(13)建设工程文件归档整理规范GB/T50328-20011.2编制说明1.本工程体量大,工期要
17、求紧,施工方面应充分考虑,综合协调,确保优质工程的实现,工期力争提前,确保惠州市安全生产文明施工示范工地、争创广东省安全文明施工示范工地。本施工组织中提出的方案、施工方法与措施,力求具体、实用、针对性强,同时积极慎重地推广应用先进、成熟的新材料、新设备、新技术、新工艺,向科技要质量,要工期,要效益。2.本施工组织设计作为指导施工的依据之一,围绕质量、工期和安全目标,针对项目施工管理、劳动力组织、施工进度计划控制、机械设备及周转材料配备、主要技术方案及措施、安全和工期保证措施,文明施工及成品保护等诸多方面,作了统筹考虑,突出其科学性和可行性。3.项目在具体组织实施时,可在本施工组织设计的基础上,
18、根据施工图纸及实际情况等作更进一步的深化细致的补充,如编写创优策划书,大体积砼施工、外架施工、转换层大梁施工、屋面工程施工、施工用电、大型机械安拆等专项施工方案,以及编写在总进度计划控制下的季度、月、旬进度计划等,以一个完整的、切合实际的科学施工组织设计来指导施工。2 工程概况及特点2.1 总体概况序号项 目内 容1工程名称别样城四期2工程地点惠州市惠阳区淡水尧刚下刘屋3建设单位惠州市惠阳区花千里实业有限公司4设计单位深圳市华阳国际工程设计有限公司5承包范围别样城四期工程项目施工图建安工程总承包,6承包方式包工、包料、包质量、包安全、包文明施工等总承包施工7工期要求总工期730天,开工竣工时间
19、:2013-12-31至2015-12-308质量要求达到现行国家验收标准合格的规定,确保惠州市建设工程优质奖,争创广东省建设工程优质奖9安全文明要求确保惠州市安全生产文明施工示范工地,争创广东省安全生产文明施工示范工地2.1.1建筑概况 表2-1序号项 目内 容1建筑功能本工程集商品住宅、商业、停车为一体的商住楼2建筑平、立面特点本工程建筑主体为29、32、33层塔楼以及二层麦当劳店,塔楼上部为住宅,部分底部一层或二层为商业,地下一层为车库及局部设备用房(建筑面积为28072.34),战时局部为2个核6常6级二等人员掩蔽所和1个核5常5级防空专业队员掩蔽部。住宅部分均为剪力墙结构,麦当劳店部
20、分为框架结构,地下室为框架-剪力墙结构。基础采用人工挖孔桩。本工程建筑物包括50#60#楼11栋高层(29、32、33层)住宅、商业及61#楼(麦当劳店),总建筑面积为158620.42m2(含地下室)。其中50#、51#楼;56#、57#楼一层为商业,局部架空层,二层局部商业及住宅,三层以上为住宅,共计32层,建筑高度97.75m; 52#楼;53#、54#楼一层为商业,局部架空层,二层以上为住宅,共计29、33层,建筑高度分别为86.75m、98.35m;55#楼(32层);58#楼;59#、60#楼(33层)一层为架空层,二层以上为住宅,建筑高度分别为98.55m和97.95m;61#楼
21、为2层麦当劳店,建筑高度8.35m。本工程建筑一层大堂室内地坪标高为0.000米,相当于绝对高程22.00米。2F建筑面积指标、层高、功能布局楼层建筑面积(m2)层高(m)功能布局-1F28072.344.555.05主要以车库为主,其它附属配电间、风机房、变配电房、消防控制室、垃圾转运站及电话、电视、网络机房、人防、污水处理间1F5054#商业:6.4;5657#商业:6.4; 55#楼:6; 5860#楼:6;商铺、架空层2F5051#商业:5.3;5254#商业:2.9;5657#商业:2.9; 55#楼:3; 5860#楼:2.95054#:商业;5657#:商业; 55#楼:商品住宅
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。