场地清理施工方案.doc
《场地清理施工方案.doc》由会员分享,可在线阅读,更多相关《场地清理施工方案.doc(10页珍藏版)》请在三一文库上搜索。
1、promotion of employment, form a reasonable and orderly pattern of income distribution, build a more fair and sustainable social security systems, medical and health system reform. The plenary, innovation of social governance, must focus on the maintenance of fundamental interests of the overwhelming
2、 majority of the people, maximize factors, enhance social development, improving social governance, the interests of national security, ensure that the people live and work, social stability and order. To improve social governance, stimulating social organization, innovative and effective system of
3、preventing and resolving social conflicts, improving the public security system, set up the National Security Council, national security systems and national security strategy to ensure national security. Plenary session, the construction of ecological civilization, you must establish systems of eco
4、logical system, using the system to protect the ecological environment. To improve natural resources asset property right system and use control, red line of delimitation of ecological protection, resources paid use system and ecological compensation system in ecological environment protection manag
5、ement system reform. Plenary session, centering on building a listening party command, can win and having a fine style of the peoples army, a strong army under the new situation of the party Goals, restricting the development of national defense and army building is solved outstanding contradictions
6、 and problems, innovation and development of military theory, enhance military strategic guidance, improve the military strategy in the new period, building a modern military force system with Chinese characteristics. To deepen the adjustment of personnel system reform in the army, military policy a
7、nd system reform, promote the development of military and civilian integration depth. Plenary session stressed that comprehensive reform must be to strengthen and improve the partys leadership, give full play to the core role of the party commands the overall situation and coordinating all parties,
8、improving the partys leading water . Margin. Challenged the leadership of the Communist Party of China, Marxism-Leninism and Mao Zedong thought by Deng Xiao-pings flag, replaced by three representatives and the harmonic society. The former Communist Party spirit and social cohesion point of almost a
9、ll political makeover. Characteristics of socialism public ownership is shifting to private ownership, planned regulation and market regulation, the proletarian regime controlled by the elite. Of universal equality, fairness and basic principles of distribution system is socialist society, however a
10、fter economic monopolized by powerful, vested interests grow, employers do not have the same status, hardly seems fair social distribution. State key protection of capital interests rather than the interests of citizens, had been hits the bottom of the proletariat湖州南浔至长兴姚家桥高速公路项目承包单位:山东省交通工程总公司 监理单位
11、:温州市交通工程咨询监理有限公司浙江省交通厅工程质量监督站监制合 同 号: 六合同 编 号: SSZW-06-001 浙路(JB)103 分项工程开工报告上一步中间交工证书编号(如果有):项目名称:建议开工日期年 月 日地点或桩号:计划完工日期年 月 日现场负责人:施工员质检员施工准备情况说明承包人: 年 月 日附 件序号名 称说明1标准试验审批表2工艺试验审批表3到场材料审批表4到场设备审批表5施工进度计划、工艺流程图6质量控制方法和手段7安全生产规程8重要施工技术措施9技术交底记录现场监理意见现场(专业)监理工程师: 年 月 日审核意见驻地监理工程师: 年 月 日湖州南浔至长兴姚家桥高速公
12、路项目承包单位:山东省交通工程总公司 监理单位:温州市交通工程咨询监理有限公司合 同 号: 六合同 编 号: SSZW-06-001 浙路(JB)118 进场设备报验单 年 月 日致总(驻地)监理工程师:下列施工设备已按合同规定进场,请你查验签证,准予使用。承包人(签名公章): 年 月 日序号设备名称规格型号数量进场日期技术状况拟用何处备注致合同段项目经理部: 经查1、 性能、数量能满足施工需要的设备: (准予进场使用的设备) 2、 性能不符合施工要求的设备: (由承包人更换后再报的设备)3、 数量或能力不足的设备: (由承包人补充的设备)4、 请你们尽快按施工进度要求,配齐、配足所需设备,保
13、持适用设备的良好状态。监理工程师: 日期:注:本表由承包人填报。一般为一式三份。湖州南浔至长兴姚家桥高速公路项目承包单位:山东省交通工程总公司 监理单位:温州市交通工程咨询监理有限公司合 同 号: 六合同 编 号: SSZW-06-001 浙路(JB)117 建筑材料报验单 年 月 日监理工程师:下列建筑材料经自检试验符合本工程有关要求,报请验证,并准予进场使用。承包人: 年 月 日材料名称材料来源、产地材料规格用途(工程或部位)本批次材料数量试样数量抽检自检取样地点、日期试验日期、操作人试验结果材料(预计)进场日期致承包人项目经理部: 现证明上述材料的取样、试验等是符合(不符合)规程要求的,
14、经抽检复查试验的结果,表明这些材料,符合(不符合)本工程的有关要求,可以(不可以)进场在指定的工程部位使用。试验(材料)监理工程师: 日期:注:本表由承包人填报一式三份。湖州南浔至长兴姚家桥高速公路项目承包单位:山东省交通工程总公司 监理单位:温州市交通工程咨询监理有限公司合 同 号: 六合同 编 号: SSZW-06-005 浙路(JB)103 施工技术(工艺试验)方案报审单致监理工程师:现报上 浙江申苏浙皖高速公路六合同工程的 场地清理 施工技术(工艺试验)方案,请予审核和批准。承包人: 年 月 日附件:施工技术(工艺试验)方案详细说明和图表。浙江省交通厅工程质量监督站监制专业监理工程师审
15、查意见:审核人: 年 月 日驻地监理工程师审查意见:审核人: 年 月 日业主审查意见:审核人: 年 月 日注:1、特殊技术、工艺方案要公司工程部批准,一般的由驻地监理工程师批准;2、技术、工艺方案批准前是否要专家论证,由公司工程部决定;3、本表由承包人填报一式三份,公司、监理、承包人各存一份。场地清理施工方案一、 工程概况:本合同段共计场地清理内容: 公路用地范围及借土场地的清理、拆除和挖掘,以及必要的平整场地等有关作业。二、 前期准备:1、 排水:清理场地前,先挖好临时排水沟。2、 进场道路:本合同段便道与主要运输道路贯通,以便施工机械进场作业。3、 机械安排:4、 人力安排:项目经理:房义
16、营项目付总工:高永青质检科材料科工程科软基施工处:李志军粉喷桩施工队队 长:葛 放技术员:刘桂海三、 施工方案:测量放样:施工前确定现场工作界限,并保护所有规定保留和监理工程师指定的要保留的植物及构造物。开挖临时排水沟:在永久征地界内侧开挖临时排水沟,临时排水沟与沿线河塘、沟渠相互连通,以排除场地内积水及雨水。清理场地场地清理前将路基用地范围内的树木、灌木丛等砍伐或移植,砍伐的树木堆放在路基用地之外或妥善进行处理。采用推土机配合人工的方式清除路基范围内的垃圾、有机物残渣及原地面以下至少100300mm内的草皮、农作物的根系和表土,并弃到指定的地点;场地清理完成后,测量其顶面高程并报监理工程师复
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 场地 清理 施工 方案
链接地址:https://www.31doc.com/p-2081732.html