fq立筒仓钢漏斗制作安装施工方案.doc
《fq立筒仓钢漏斗制作安装施工方案.doc》由会员分享,可在线阅读,更多相关《fq立筒仓钢漏斗制作安装施工方案.doc(33页珍藏版)》请在三一文库上搜索。
1、units, one month, one inspection, one month, one dispatch to ensure emission reduction work smoothly. Also cooperate with provincial and municipal environmental protection Department many times inspection, problems existing in the supervision, tracking, and urge enterprises to implement action plan.
2、 First half of 2015, COD indicators in our County has completed Twelve-Five cuts. NOX targets because the County has no specific projects, the indicator exceeds the value. 1. the air pollutant emissions. Enhance Yixin steel, Baosteel Dresdner and min-light steel three supervisory management, require
3、s companies to establish emissions reduction facilities operation management system and standardize the emissions account records standard abatement equipment operation and fault reporting system. Yi Xin min light steel and iron and steel sintering was removed (pellet) FGD bypass, improved availabil
4、ity and integrated desulphurization efficiency of desulfurization facilities. 1-September, Yixin sintered steel (pellet) desulfurization facilities running stable, desulfurization efficiency desulfurization facilities can reach above 80%; min light company two sintering machines of desulfurization f
5、acilities running stable, integrated desulphurization efficiency can reach 80%. 2. wastewater treatment plant emissions. Strengthening sewage treatment plant daily environmental regulation, and urge enterprises to standardize the operation of sewage treatment facilities to ensure that . Level of eut
6、rophication. In marine sediments once total chromium, copper, lead, and mercury, arsenic and other 6 indicators can reach the marine sediments of limit values of category II quality standard requirements. Third, Jingang monitoring groundwater quality indices have met the standards for groundwater qu
7、ality (GB/T14848-93) category 3 standards, groundwater quality is good, meet the zoning requirements. (E) the ecological County to create a working 1. create eco-cell. Currently, I County provincial ecological County within industry material prepared work basic ready, County has 10 a township throug
8、h provincial above ecological Township acceptance and named, which Fengshan, and Matsuyama, and fly bamboo through national ecological Township acceptance and named, bi in, and Jian Jiang, and in the room, and Huo Kou, and TA, and started through national acceptance; County has 167 a village through
9、 city level above village named, ecological cell created has reached provincial ecological County assessment requirements. 2. environmental remediation projects in rural areas. 2013 rural environmental comprehensive renovation project involved 4 townships (White Tower, beginning, Sealand, Hong Yang)
10、 projects with a total investment of 6.4367 million Yuan, the Central grant of 2.3 million Yuan, provincial matching of 2.7 million Yuan, County finance supporting 1.4367 million Yuan. Time frame for completion end of 2014. As of May 4 Township projects have been completed and put into use, June 8,
11、through acceptance of the expert group. Currently about 3 million yuan of special funds allocated, the remaining funds to finish the budget of the project allocated. 3. livestock breeding pollution control work. Attention of the County Government to develop the further strengthening of 2015 views of
12、 livestock breeding pollution control work (Luo Zheng Heald (2015), 148th) in accordance with the year abatement and water supply, urban demolition, combined with the project principle, 9 towns in our County involvingThis Conference is by municipal Standing Committee research decided held of, main t
13、ask is in-depth learning implement XI General Secretary on two learn a do learning education of important indicates spirit and provincial Secretary XXX important speech spirit, according to central deployment and provincial requirements, on I city two learn a do learning education work for arrangeme
14、nts deployment, education guide General members further firm ideal faith, and keep on party loyalty, and set breeze upright, and courage to play as, for in province first full built well-off social, and Building higher levels of ecological vitality city provide a strong organizational guarantee of h
15、appiness. All party members in the Constitution Party rules, series of speeches, be qualified party members education, Party Central Committee to deepen the inner-party education, advancing the comprehensive yet another important practice in strictly administering the party, is to promote the inner-
16、party education from key minority to the vast number of party members expanded, from the concentration of important measures to extend education to regular education, is leading the task of party building this year. This year, the XI General Secretary on many occasions two study and education issued
17、 instructions, profoundly illustrates the significance of education, brilliantly describes the overall objectives, basic requirements and main tasks of education, made clear that the main responsibility of the head of the party organization at all levels and shall carry out, point in the right direc
18、tion for the us to carry out study and education, provide the fundamental follow. On April 6, Liu Yunshan, Comrade Zhao Leji in Central two Forum on educational work, a careful deployment of this work, put forward a clear requirement. On April 13, the Party Secretary, Xie Fuzhan, Director of the pro
19、vincial peoples Congress, the provinces two study educational Conference, made specific arrangements to carry out study and education in the province. We want to seriously study led And further implementation. Party according to the spirit of the Central and provincial requirements, based on actual
20、city, research has developed a two educational programmes and study contents specific programmes, we want to pay special attention to follow-up. Now, I make a few remarks. First, deepening understanding, enhancing grasp two educational responsibility since the partys 18, Comrade XI Jinping as Genera
21、l Secretary of the CPC Central Committee made a series of major deployment around the partys construction, making a series of punch, construction of a new political styles and the aspirations of the Party greatly condensed. Two study and education, reflects the interlocking, step by step, further pr
22、omote the comprehensive strictly administering the partys firm determination and political will, to push forward the four comprehensive strategy is of great significance. We should be supported by political and overall中粮米业(巢湖)立筒仓钢漏斗制作安装工程施工方案江西省群力钢结构工程有限公司目 录一、工程概况3二、编制依据3三、主要施工方案和措施4四、安全措施及劳动纪律9五、劳
23、动力及进度计划11六、工程技术管理、质量管理13七、文明施工管理、HSE(健康、安全、环境)要求 14八、施工现场突发事件应急预案21一、工程概况 1.1、工程名称: 中粮米业(巢湖)立筒仓钢漏斗制作安装工程。1.2、建设单位: 安徽天成建设有限公司巢湖中粮项目部。1.3、施工单位:江西省群力钢结构工程有限公司。1.3、建设规模:详见中粮米业(巢湖)立筒仓钢漏斗制作安装工程施工图。1.4、工程地点环境概况:该工程位于安徽省巢湖市,场地平整、供水、供电设施齐备、设备及材料的运输条件良好。1.5、工作内容及施工承包方式:本工程包括立筒仓钢漏斗制作安装等零星工程。以设计图纸及甲方提供的工程量清单作为
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- fq 筒仓 漏斗 制作 安装 施工 方案
链接地址:https://www.31doc.com/p-2121424.html