mq220kV 大型变电所电气主接线方案与设备布置初步设计.doc
《mq220kV 大型变电所电气主接线方案与设备布置初步设计.doc》由会员分享,可在线阅读,更多相关《mq220kV 大型变电所电气主接线方案与设备布置初步设计.doc(126页珍藏版)》请在三一文库上搜索。
1、ocusing on ways and means of improving and upgrading work, further development of three to split. (A) fully grasp no unauthorised created. The township no unauthorised created the existing building one household, one document survey and file storage work must be unconditional and full coverage. Main
2、 corridor leading to the town (road, river) village, the Central built-up area of the town on both sides must be to create a no unauthorised village. According to five hundred villages created and shanty towns, villages, old houses, reconstruction of old plant, expand create, upgrading creates files
3、, the real no unauthorised village created into the benefit of the people of very good thing. (B) to strictly manage count as unauthorised controls. Promoting the new control work to move the center of gravity, management measures to the front, and earnestly pipes effectively. A strict new unauthori
4、sed network responsibility. Sectors such as land, housing and basic stations (stations) and the Township of grid accountability mechanisms must be strictly in accordance with the new regulatory requirements, effective implementation of the area of responsibility of the new inspections, suppression,
5、demolition work to ensure that the new zero tolerance. Second, public security, water, electricity, water, oceans and fisheries, tourism collaboration, market supervision departments should strictly enforce the illegal construction of disposal of relevant provisions of the regulations, effective ful
6、filment of responsibilities, particularly in electricity and water supply, and other units may not be new illegal buildings to supply water and electricity supply. While more regulation to prevent personal privacy violations. Illicit trading in illegal construction in the Ministry of public security
7、 sector to strictly from the blow. Three is to create additional offence reporting system of incentives. According to building law and covers an area of nature, to report timely degree divided report grade, effective after the removal of certain incentives. (C) integrated implementation , building d
8、emolition, modification, use combination. Demolition is the means and purpose built is. To adhere to the building demolished, combination of construction and demolition waste, demolished with combined efforts to improve the scientific level of three to split; second, we must pay attention to three t
9、o split and five hundred and five water treatment, three of the four sides, the shackDistrict transformation, and dangerous old room transformation and two road sides, series work organic combined up, active do River, and along demolition work, and manpower advance village in the, and old residentia
10、l demolition work, to improved masses housing conditions and live environment; three to put three modified a split as traditional low, and small, and bulk industry structure transformation upgrade of important initiatives to caught, speed up advance industry Park, effective optimization park environ
11、ment220kV 大型变电所电气主接线方案与设备布置初步设计and improve idle land of utilization, real achieved environment improved and productivity development mutual promoting total win. Five, firmly implement, promoting work ahead, to create highlights. Third deployment, implementation of seven, then it is imperative to str
12、engthen responsibility and improve the mechanisms and implementation. All localities and departments must be convinced that goals, going all out, mustering spirit, work together to ensure that this years objectives carry out tasks, at the forefront. First, we must strengthen the leadership to implem
13、ent. Departments at all levels should always work and rural five water treatment, three to split in an important position, and carry the main responsibility, main leader personally, leaders arrested and layers of responsibility rank transmission pressure established hierarchical accountability, and
14、work together to promote the work of the mechanism, a concerted effort pay attention to implementation. County nongban, flood, three to one down to further play a leading catch total, integrated and coordinated role of all kinds is long, Sheriff Inspector to effectively fulfill their responsibilitie
15、s, formed the alignment on the fire line and management a lively situation. Second, we must strengthen the test implementation of the Governor. Role play the Governor got the baton, for agricultural and rural focus and five water treatment, three to split work, refine improve assessment methods and
16、evaluation system, accurate assessment. Combined with dare play, tree benchmark style building five major operations, carry on and gain firsthand experience of supervision, in particular, to strengthen the focus on the long signs go left, names such as supervision, urged all levels longer on duty in
17、 place. Through the supervisory assessment, to promote habits, stimulating power. Third, we must strengthen implementation style. Departments at all levels to work in rural areas and five water treatment, three to split as training cadres for major platforms, compete against large examination room,
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- mq220kV 大型变电所电气主接线方案与设备布置初步设计 大型 变电所 电气 接线 方案 设备 布置 初步设计
链接地址:https://www.31doc.com/p-2128168.html