nc安徽某高层住宅楼施工组织设计(框架异形柱)_secret.doc
《nc安徽某高层住宅楼施工组织设计(框架异形柱)_secret.doc》由会员分享,可在线阅读,更多相关《nc安徽某高层住宅楼施工组织设计(框架异形柱)_secret.doc(170页珍藏版)》请在三一文库上搜索。
1、activities to develop in depth. Is to promote the two, and actively create atmosphere. To let society more widely understand Ministry of public security on modified of decided (Ministry of public security 124th, makes) and motor vehicle license apply for and using provides (Ministry of public securi
2、ty 123th, makes), active create strong atmosphere, effective maintenance driving people of lawful rights and interests of, ensure two a Department makes smooth implementation, we take six article measures, do six a in place, (Organization police learning two a Department makes, do learning in place;
3、 strengthened media publicity two a Department makes, do publicity in place; Organization drivers explain the two prescripts, education in place; printed two prescripts, publicity materials, promotional materials; use the Internet and mobile phone text messaging, publish information; journalists wit
4、h police operations, reporting). Second, the effective implementation of the education plan and strengthen the driver education training. XX people . Security and stability established information security system, abnormal operation analysis and early warning mechanisms. By implementing online busin
5、ess regulatory assessment, improve the quality of business data. Third, raise the level of public security traffic management command. In accordance with the overallplanning, building, expanding, on demand service principle, making full use of existing resources, urban video, monitoring and command
6、platform. Video, monitors and police command vehicle GPS positioning, scheduling and management. Detachment and Luqu Brigade command center and is gearing up to promote. Actively seeking funding, equipped with computers, law enforcement recorder, alcohol detector, mobile guns and other equipment, im
7、prove the level of technology and equipment to promote application of new technology. To further enhance the level of law enforcement. Actively cooperate with four Corps, complete the popularization and application of new software and systems. Application based on the composite application platform
8、performance assessment in the province system, enforcing the supervision and assessment system, source of traffic safety supervision system, fault reporting operation and maintenance management system plug-in software commissioning of complete detachment of the DMV driver test center access driver e
9、xamination Center in the province, with the Corps to promote construction of motor vehicle inspection have been supervised system, intercom system requested by the Corps to open 350 trillion. Five is to strengthen information system security management, improving the information systems environment.
10、 According to province police information communications room construction specification requirements, further strengthening police information communications room construction of scientific, and normative, and security, effective guarantees police information construction and application of in-dept
11、h development; specification established the business Taiwan account*家园-3#楼施工组织设计目 录第一章 编制依据 . 1第二章 工程概况 4第一节 工程概况 . 4第二节 施工现场概况 8第三章 施工部署 9 第一节 工程管理体系及人员配备 . 10 第二节 施工总体安排 . 11第三节 主要施工机具设备选择和需求计划 . 11第四节 垂直、水平运输 . 11第四章 施工进度计划与进度控制 . 12第一节 主要分部分项控制工期及工程总工期安排. 13第二节 工期保证措施 . 13第五章 施工总平面布置 . 17第一节、主要
12、临时设施 . 18第二节、施工用水、电 . 18第六章 *家园3#楼主要施工方案 20第一节 施工测量技术方案 . 21第二节 土方工程施工方案 . 27第三节 地下室防水施工方案 . 30第四节 模板工程施工方案 . 34第五节 钢筋工程施工方案 . 50第六节 砼工程施工方案 59第七节 砌筑工程施工方案 68 第八节 楼地面工程施工方案 73第九节 装饰工程施工方案 77第十节 门窗工程施工方案 82第十一节 屋面工程施工方案 85第十二节 给排水管道及洁具安装施工方案 89第七章 重点分部分项工程施工技术质量保证措施 94第一节 管道及卫生间防渗漏施工 95第二节 铝窗防渗施工 95第
13、三节 墙面防渗措施 95第四节 防止地面空鼓、开裂措施 96第五节 防止主体结构质量通病的措施 96第六节 屋面防水施工措施 97第八章 季节性施工措施 98第一节 冬期施工措施 99第二节 雨期施工措施 . 103第三节 夏期施工措施 . 103第九章 质量目标及质量保证计划 105第一节 质量目标 . 106第二节 质量管理和质量保证体系 106第三节 质量管理组织设置说明 107第四节 项目质量管理责任制 107第五节 项目质量管理制度 111第六节 土建质量保证措施 123第七节 安装工程施工质量保证措施 125第八节 分部分项工程技术保证措施 126第十章 安全生产技术措施 128第
14、一节 安全生产及消防制度 129第二节 安全生产措施 131第三节 机电设备施工的安全事项 132第四节 人货电梯和塔吊安全措施 133第五节 各主要工序施工安全措施 134第十一章 施工期间的消防措施 139第十二章 确保文明施工的技术组织措施 141第一节 文明施工目标计划及组织管理 142第二节 计划管理 144第三节 环保、卫生管理 144第四节 加强现场技术管理 145第五节 加强现场材料管理 . 145第六节 施工现场场容管理 146第七节 生活区的管理 147第八节 其他具体措施 147第九节 文明施工检查措施 148第十三章 先进的工艺方法以及节约措施 150第十四章 各专业工
15、种配合措施 153第十五章 附录 1551、*家园3#楼工程施工组织机构 2、*家园3#楼工程质量管理体系3、*家园3#楼工程安全管理体系4、*家园3#楼工程施工机械表5、*家园3#楼工程周转材料及劳动力计划表第一章 编 制 依 据第一章 编制依据1、本工程施工蓝图、施工合同及现场踏勘纪实2、国家现行建筑安装工程施工及验收规范(含安装部分) 工程测量规范GB50026-93 混凝土结构工程施工质量验收规范 GB50204-2002 钢筋焊接及验收规程JGJ18-96钢筋焊接接头试验方法标准JGJ/T27-2001 建筑工程冬期施工规程JGJ104-97 烧结普通砖GB/5101-1998 屋面
16、工程质量验收规范GB50207-2002 建筑装饰装修工程质量及验收规范GB50210-2001 建筑工程饰面砖粘结强度检验标准JGJ110-97 建筑地面工程施工质量验收规范GB50209-2002 地下防水工程质量验收规范GBJ208-2002 砌体工程施工质量验收规范GB50203-2002 建筑地基基础工程施工质量验收规范GB50202-2002 建筑工程施工质量验收统一标准GB50300-2001 建筑工程质量检验评定标准GBJ301-88 建筑给排水及采暖工程施工质量验收规范GB50242-2002 建筑电气工程施工质量验收规范GB50303-2002 硬聚氯乙烯(PVC-U)双壁
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- nc 安徽 高层 住宅楼 施工组织设计 框架 异形 _secret
链接地址:https://www.31doc.com/p-2129020.html