1、evaluation of scientific development. Nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and sy
2、stem, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. Quality and efficiency-quality benefit is to adhere to the
3、enterprise survival, profit and development business truth, adhere to the all activity is economic activity, all costs can be controlled, money should not be wasted management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness. In
4、novation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthening scientific and
5、 technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. Resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at the core, enhance
6、 the operation of lean management to realize low consumption, high efficiency, reduce production costs. Second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. Harmonious development of harmoni
7、ous development-is to construct a foreign environment for development. XING refers to the internal security firm and internal management of the internal management measures are effective, harmonious. Foreign currency means Enterprise coordinating development of homeopathy, well, get along with the n
8、eighbors better. (B) XX 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. Class of disorders 0, 0 is equivalent forced outage rate. No personal injury accident, material and equipment accidents do not occur, no fire, no environmental pollution acciden
9、t. Enterprise integrated to achieve zero cases of violation, zero accidents, zero. Quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kWh, total profits of 306.6 million Yuan, . BFS+、PI、MIS、SCM Information systems infrastructure, fully integrated information s
10、ystem to realize information resources sharing; to expand the breadth and depth of the portal system, information system of Enterprise Management Assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting causes and transfer system; to strengthen the tr
11、aining古冶区红北道西延道路工程施工组织设计第一章 编制概况 (一)编制说明公司经过认真研究中标文件,仔细考察工程现场,对工程所处位置的交通、结合我公司多年的施工经验和目前的施工技术,组织编制了本实施性施工组织设计。在本工程组织设计编制中,充分考虑了各关键工序和重点工序及相互间的衔接与协调的可行性,及其相应的施工技术方案和工艺操作方法,本工程现场的地质条件、地上地下管线和交通情况可能对本工程产生影响,都作了充分的估计和准备。我公司确保在合同工期内完成本工程的施工,力争工程质量优良。(二)编制依据1、唐山市古冶区古兴投资有限公司招标文件古冶区红北道西延道路工程;2、古冶区红北道西延道路工程施
12、工图3、本工程图纸会审纪要;4、工程地质勘察报告、工程现场踏勘及调查情况;5、本公司近年来承建类似工程的施工经验;6、质量检验评定标准及相关施工验收规范;(三)编制原则1、遵循招标文件、投标文件的各项条款;2、遵循设计和验收标准的原则,力争优良工程;3、确保施工组织设计的可行性,先进性和合理性。4、按照“项目法施工”的原则。第二章 工程概况本工程为红北道西延道路工程,位于唐山市古冶区,西起支路一,东至考试场西路,道路全长为445.489m,红线宽30m,单幅路人非共板道路断面型式,为城市次干路。随着唐山市古冶区的开发建设,结合城区大规模改造和重点项目建设,势必会使城区的交通量明显增大,因此对红
13、北道西延进行设计,不仅可以提高周边道路的通行能力,改善道路交通环境、提升城区形象,而且以古冶区的宣传、发展都有重要影响。(一)道路工程1、道路标准横断面:本道路设计红线宽30m,为单幅路人非共板道路断面型式,标准断面为:30m=(2.5+3+2)+15+(2+3+2.5),其中机动车道宽15m,两侧绿化设施带各宽2m,两侧非机动车道各宽3m,两侧人行道各宽2.5m。机动车道采用抛物线接直线形路拱,路拱横坡为1.5%,非机动车道及人行道采用直线形路拱,路拱横坡为1.5%。2、路面结构机动车道路面结构自上而下依次为:4cm细粒式沥青混凝土(AC-13F)改性沥青粘层油、7cm粗粒式沥青混凝土(AC
14、-25C)、透层油、54cm水泥稳定碎石(三步)、20cm级配碎石。机动车道路面各结构层及土基顶面竣工验收弯沉值:第1层路面顶面交工验收弯沉值LS=19(0.01mm)第2层路面顶面交工验收弯沉值LS=24(0.01mm)第3层路面顶面交工验收弯沉值LS=26(0.01mm)第4层路面顶面交工验收弯沉值LS=34(0.01mm)第5层路面顶面交工验收弯沉值LS=72(0.01mm)第6层路面顶面交工验收弯沉值LS=280(0.01mm)路面顶面交工验收弯沉值LS=323(0.01mm)非机动车道路面结构自上而下依次为:3cm细粒式沥青混凝(AC-10F)粘层油、5cm中粒式沥青混凝土(AC-1
15、6C)、透层油、15cm水泥稳定碎石、18cm级配碎石。非机动车道路面各结构层及土基顶面竣工验收弯沉值:第1层路面顶面竣工验收弯沉值LS=62(0.01mm)第2层路面顶面竣工验收弯沉值LS=70(0.01mm)第3层路面顶面竣工验收弯沉值LS=85(0.01mm)第4层路面顶面竣工验收弯沉值LS=296(0.01mm)土基顶面竣工验收弯沉值LS=323(0.01mm)机动车道路缘石采用花岗岩立路缘石,直线段长度99.5cm,非机动车道路缘石及人行道外侧路缘石采用水泥混凝土平道牙,长度为49.5m。路缘石就位后,用1:2水泥砂浆勾平缝。机动车道采用花岗岩路缘石,规格为长宽高=99.51225c
16、m,非机动车道采用水泥混凝土平道牙,规格为长宽高=49.51015cm,混凝土标号均不低于C30。 (二) 雨水工程l、红北道雨水管道工程,雨水管道位于路中以南12.5m,d600主管道长33m,d1000主管道长140m,d1500主管道长140m,d1800主管道长489.201m。2、雨水、收水支管均选用级无压钢筋混凝土承插管道,胶圈接口,施工时应使胶圈压缩均匀,避免出现胶圈扭曲接口、回弹等现象,雨水采用均90砂石基础;未注明排水支管基础与相连接的主干管相同。管道必须按设计坡度施工,不得反坡。开挖沟槽应严格控制基底高程,不得扰动基底原状土层。基底设计标高以上0.2m-0.3m的原状土应在
17、铺管前用人工清理至设计标高,槽底如有尖硬物体必须清除,用砂石回填处理,压实度不小于90%。3、雨水管道沟槽采用素土回填,分层夯实。管道两侧和管顶以上500mm范围内胸腔夯实,应采用轻型压实机具,回填压实度按照给排水管道工程施工及验收规范(GB50268-2008)。4、雨水检查井采用钢筋混凝土检查井,雨水口砌体采用MU10水泥砖,井座、井盖、雨水箅子均采用球墨铸铁防盗定型产品,满足重型荷载要求。雨水井盖采用防坠落双层井盖。车行道范围内的井室及井筒周围0.4m范围内位于路面结构层部分采用C20混凝土回填,结构层以下部分采用石粉掺加5%水泥回填,分层夯实,压实度不小于90%。 5、施工中遇地下水时
18、需采用井点降水或其他降水措施,保持动水位在槽底以下不小于800mm,做到干槽施工,在基础底下换填300mm厚级配碎石,压实度不小于90%。管道基础下若有淤泥层且厚度小于800mm,将淤泥层清除至原状土,若无地下水,可采用素土分层夯填至基础底标高,压实度不小于93%;若有地下水,基础底以下换填300mm厚级配碎石,分层夯填至基础底标高,压实度不小于90%,级配碎石以下换填山皮石。如管道基础下淤泥层厚度超过800mm,先将淤泥层清除800mm厚,管道基础以下换填300mm厚级配碎石,级配碎石以下换填山皮石。山皮石施工时用不小于18t的重型振动压路机按强振、4km/h以下速度碾压,碾压两次后测各测点
19、的高程差,平均值应不大于5mm标准差不大于3mm。6、雨水收水支管采用级d300钢筋混凝土承插管,180砂石基础,坡度为0.01-0. 1,如不能接入检查井井室,则接入检查井井筒。交叉口处雨水口施工中应结合现场施工情况按照道路交叉口竖向图设在最低点,直线段上雨水口设置在纵坡的低点处,可视现场情况适当移动收水井位置,以利收水。无预埋管的雨水口与检查井对应,有预埋管的雨水口外井壁与预埋管外壁净距为2米。(三)给水工程给水管道位于路中北15m,主管道dn250长498.57m。本工程给水管材及管件选用HDPE高密度聚乙烯(PE100)给水管,工作压力为0.5MPa,热熔连接;阀门dn200的阀门采用
20、偏心半球阀,dn200的阀门采用闸阀(配带伸缩节)(4) 道路照明工程古冶区红北道西延道路照明工程,道路全长445.489m,其中机动车道宽度为15m,道路现状无路灯,需要全部新建。第三章 施工部署 (一)施工区划分 一个工程能否保质按期顺利地完成施工任务,对整个工程区段划分是否科学合理将是关键问题之一,这将有利于对整个工程施工的总体部署,有利于今后施工的全面展开,做到有条不紊,稳步前进,直至完成施工任务。 对于本工程的施工区划分,我们在认真分析施工图纸的基础上,并进行多次现场踏勘,结合周边环境,组织交通情况,并考虑今后施工情况,工期情况,经比较成本核算后决定把工程划分为一个施工区,三个专业施
21、工班组,划分情况如下:第一专业施工班组为负责全线范围内的道路给排水工程、第二专业施工班组为全线道路工程的实施、第三专业施工班组为路灯照明工程。 (二)施工总体步骤 1、班组安排 根据工序划分,分为道路班组及给排水班组、路灯照明班组。 2、总体施工顺序坚持“先地下、后地上”、“先深后浅”、“先管道、后道路”的施工原则组织施工。3、总体施工流程施工准备 清除表土 路基填筑 给水、雨水管施工 路基 路面基层 沥青路面 路灯照明 竣工验收(三)施工组织和总体目标 1、施工总体目标我公司本着“科学组织,创优夺杯,安全高效,确保工期,文明施工”的原则,抽调公司具有类似工程施工经验的工程项目部,完成本工程施
22、工的下述目标:工程质量目标:力争工程质量等级优良。工程安全目标:杜绝施工安全事故。文明施工目标:有关文明施工要求,文明施工,创标化工地。工程工期目标:工程计划2014年12月2日开工,2014年12月30日竣工,工期50天,争取工期提前完成,具体开工日期以业主或监理工程师签发的开工令为准。2、施工人员组织安排参加本工程施工的人员由多次参加类似工程施工,具有丰富施工经验的人员组成。各类管理人员、技术人员和技术工人在中标后3天内进场,做好先期准备工作,并按业主(监理工程师)发出的开工令按时全面开工。拟投入本工程管理共计10人。 3、机械设备组织根据本工程的施工要求和施工组织安排及实际现场情况,立即
23、组织部分机械设备进场,包括挖掘机1台、压路机1台、推土机1台、装载车1台、打夯机2台、砂浆搅拌机1台等。 4、施工协调管理(1)与业主的工作协调尊重业主对工程的统一领导,配合业主与各协作单位的协调。在施工过程中,经常与业主保持联络,加强沟通,主动及时定期向业主反映工程进展情况。在工程施工中,解决和协调比较复杂,我公司首先是充分的理解,并给予支持,积极与业主协商联络,落实解决办法。安排施工,确保工程按总体计划进行。(2)与设计单位之间的工作协商我公司与设计单位的工作协商,首先需取得业主的支持和配合。积极与设计单位联系,进一步了解设计意图及工程要求,根据设计意图和要求,确定和充实我公司的具体实施性
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- pm 古冶区红北道西延 道路 工程 施工组织设计
链接地址:https://www.31doc.com/p-2130798.html