S204线(长习路)马桑垭至应庆沟路面大修工程施工组织设计修.doc
《S204线(长习路)马桑垭至应庆沟路面大修工程施工组织设计修.doc》由会员分享,可在线阅读,更多相关《S204线(长习路)马桑垭至应庆沟路面大修工程施工组织设计修.doc(225页珍藏版)》请在三一文库上搜索。
1、evaluation of scientific development. Nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and sy
2、stem, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. Quality and efficiency-quality benefit is to adhere to the
3、enterprise “survival, profit and development“ business truth, adhere to the “all activity is economic activity, all costs can be controlled, money should not be wasted“ management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness
4、. Innovation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthening scientific
5、 and technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. Resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at the core, enh
6、ance the operation of lean management to realize low consumption, high efficiency, reduce production costs. Second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. Harmonious development of har
7、monious development-is to construct a “foreign“ environment for development. “XING“ refers to the “internal security firm and internal management of the internal management measures are effective, harmonious“. “Foreign currency“ means “Enterprise coordinating development of homeopathy, well, get alo
8、ng with the neighbors better.“ (B) XX 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. Class of disorders 0, 0 is equivalent forced outage rate. No personal injury accident, material and equipment accidents do not occur, no fire, no environmental pol
9、lution accident. Enterprise integrated to achieve zero cases of violation, zero accidents, zero. Quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kWh, total profits of 306.6 million Yuan, . BFS+、PI、MIS、SCM Information systems infrastructure, fully integrated
10、 information system to realize information resources sharing; to expand the breadth and depth of the portal system, information system of Enterprise Management Assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting causes and transfer system; to str
11、engthen the training supervision in large and medium goods vehicle. A is established large vehicles and small vehicles classification management of motor vehicle test mode, increased medium van car, and dangerous goods transport car, and school car test project; II is established motor vehicle test
12、regulatory platform, achieved motor vehicle test full process video, and data remote regulatory; three is strictly motor vehicle identification management, equipped with unified of identification equipment and tool, using mobile identification Terminal, and law enforcement records instrument, techno
13、logy identification means. As to 20XX years June 20 statewide motor vehicle keep volume for 567,408 car, and last year earlier than growth 75,814 car, growth 13.36%; this year January-June, vehicles management section and license archives management section total accepted the motor vehicle registrat
14、ion business 42,543 car times, which registered registration 6,905 car times, and transfer registration 3,592 car times, and change registration 1033 car times, and mortgage registration 696 car times, and cancellation registration 187 car times, and into business 980 car times, and Archives correct
15、ions 81 pieces times, and issued test qualified logo 25,429 car times, and other vehicles business 3,640 car times; supervision Survey Section relies on “motor vehicle detection remote issued test qualified logo software platform“ supervision motor vehicle test, and identification situation 7418l li
16、angci, investigation motor vehicle exception business 30 car times, his pards business warning 244 article, vehicles and driving people sound video regulatory screenshots 1852 Zhang, checks motor vehicle archives 716 pieces times, and medium bus, and medium above truck, and Of hazardous chemicals, v
17、ehicles and school buses and other key vehicle inspection record of 420. (C) based on their own, and strict adherence to defense, more cheating, false false fugitive suspects, robbery suspect vehicles and the Internet crackdown. DMV full play to the “first line of Defense“ position control, investig
18、ating cheating, fake identification and robbery suspect vehicles through operational work, and carefully examine the documents and legal proof, check traffic violations, traffic accidents, the fugitive suspect suspected vehicles and theft than to work, further tight car, driving management business
19、formalities review procedures. . Truck driver information management platform. Motor vehicles and traffic police departments, State transport authority to further clarify the Division of labour, implementation responsibility, strengthen our collaboration and management together, reinforcing the mana
20、gement of drivers on which strongly synthetic warfare and information warfare. 3 strictly implemented. From May 1 up, a is implemented complex road and bad weather driving exam, currently DMV is urged contractors party in treasures driving school increased simulation Highway, and continuous urgent d
21、etours, and snow days, and wet sliding road, and burst situation disposal, subjects II field to driving exam project, is expected 目目 录录 第一章 编制依据及原则 一、编制依据 .1 二、编制原则 .1 三、 本工程执行主要现行规范、规程和标准.2 四、本工程执行公司 ISO9001:2008 质量认证标准4 第二章 工程概况 一、项目概况 .5 二、道路大修方案 .5 三、排水方案 .6 四、交通安全设施 .7 五、主要项目工程量 .7 第三章 施工部署 一、指
22、导方针 .10 二、施工项目组织机构 .10 三、项目目标 .18 四、施工的重点、难点.19 五、工程施工特点 .21 六、施工准备计划 .22 七、施工单元划分和施工队伍安排 .30 八、设备、人员动员周期和设备、人员、材料运到施工现场的方法 .31 九、 交通疏导方案34 十、工程节约计划 .35 十一、施工顺序 .38 evaluation of scientific development. Nature security type-nature security is to maintenance people of health value for target, through
23、 strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and system, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and
24、 management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. Quality and efficiency-quality benefit is to adhere to the enterprise “survival, profit and development“ business truth, adhere to the “all activity is economic activity, all costs can be contro
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- S204 长习路 马桑垭至应庆沟 路面 大修 工程 施工组织设计
链接地址:https://www.31doc.com/p-2133564.html