zk人工骨料筛分投标施工组织设计.doc
《zk人工骨料筛分投标施工组织设计.doc》由会员分享,可在线阅读,更多相关《zk人工骨料筛分投标施工组织设计.doc(114页珍藏版)》请在三一文库上搜索。
1、actions using rules, and in the process of the concentration of disciplinary ruling, not convergence, not pull back as heavy or heavier punishment. Discipline focused discipline process at least 18 since the five-year, five years is to pay close attention to the Central implementation eight provisio
2、ns and anti-four winds. Fourth chapter to suspected illegal party disciplinary actions and distinguish between five different circumstances, provides for specific provisions respectively, effective cohesion to achieve party discipline and State Law 9. One is the 27th article of the Ordinance provide
3、s that party members found in the disciplinary review of corruption bribery, dereliction of duty and other alleged offences under criminal law, should be given to withdraw party posts, expelled from or placed on probation within the party disciplinary action. Second, article 28th of the regulations
4、in the discipline of the party organization . Disciplinary punishment against life , Chapter 6. 3, annex Annex part of supplementary provisions, such as the permission, interpretation of the regulations, as well as the timing and retroactive, and so on. 11 (three) learning understanding Ordinance ne
5、ed grasp of several focus problem first a problem-on violation political discipline behavior new Ordinance sixth chapter put political discipline as six big discipline of first, is main on opposition of led and opposition of basic theory, and line, and basic programme of, and basic experience, and b
6、asic requirements of disciplinary behavior made disposition provides, especially will 18 big yilai Central proposed strict political discipline and political rules of requirements and practice results into for discipline provisions, Added jump on the central policy, clique, fight reviews, without pr
7、inciples and disregard the disciplinary provisions. These are the partys 18 since the comprehensive practice of strictly administering the party in the process of combining the rich content. (1) jump on the central policy violate the partys centralized and unified this issue is made under provisions
8、 of the party Constitution. Party Constitution stipulated in master uphold democratic centralism is the party building must adhere to one of the four basic requirements. This items principles is party of fundamental Organization principles, is mass line in party of life in the of using, it requireme
9、nts must full develop party democratic, respect members of subject status, guarantees members of democratic right, full play levels party and members of enthusiasm and creative, while, also must implemented right of concentrated, guarantee party of solidarity unified and action consistent, guarantee
10、 party of decided get quickly and effective of implementation. Central in developed major approach policy Shi, through different of channel and way, full heard about party and members of views recommends, but 12 is some people face to face not said, and behind blather will Shang not said, and will H
11、ou blather stage not said, and Taiwan Xia blather, actually not only disrupt has people thought, some caused serious consequences, damage has party of concentrated unified, hamper has central approach policy of implement implementation, also serious violation has democratic centralism of principles.
12、 No doubt, shall, in accordance with the regulations stipulated in the 46th of appropriate sanctions. Without serious consequences, the criticism should be given education or the appropriate organization. (2) violate the partys solidarity and unity to the new section 48th1. 概述1.1 工程概况皂市水利枢纽位于澧水流域级支流
13、渫水河上,下游距湖南省石门县皂市镇2km,距石门县城19km,是以防洪为主,兼顾发电、灌溉、航运等的综合性水利枢纽。枢纽工程由碾压混凝土重力坝、右岸坝后式厂房、左右灌溉渠首、右岸斜面升船机(预留)组成。坝顶高程148m,最大坝高88m,正常蓄水位140m,防洪高水位143.5m,电站装机容量120MW,年平均发电量3.33亿KWh。易家坡人工砂石系统主要承担大坝工程的砂石骨料供应。主体工程混凝土量96.41万m3,需砂石净料量216.34万t ,其中碎石量151.44万t,砂量64.90万t。易家坡人工砂石系统主要为大坝承包人等供应砂石骨料。主体工程混凝土量见表1.11。主体工程混凝土分年浇筑
14、强度见表1.1-2。表1.1-1 主体工程混凝土量 (万m3) 部 位大坝工程地质缺陷处理防渗处理合 计混凝土量92.553.20.6696.41三级配76.1976.19二级配16.363.20.6620.22注:表中未计损耗和临建混凝土量表1.1-2 主体工程混凝土分年浇筑强度年份2004200520062007强度(万m3)0.6448.1947.180.4其中RCC(万m3)35.268.56注:表中未计损耗和临建混凝土量。1.2 水文气象和工程地质1.2.1 水文气象(1)气温据离坝址最近的石门气象观测站19591986年观测资料统计,多年平均气温16.7,最高达40.9,最低-13
15、.0。多年平均相对湿度75%。(2)降雨渫水流域多年平均降水量约1565mm。58月为主雨期,其降水量7001200mm,占年降水量的5560。(3)风向、风力据离坝址最近的石门气象观测站19591986年观测资料统计,多年平均风速2.2m/s,大于8级(18.9m/s)的大风仅出现一次,除静风外,以ENE风向出现频率最大,大风多为NNE风向。皂市坝址位于高山峡谷区,冬季盛行西北风。(4)汛期渫水洪水由暴雨形成,年最大洪峰出现年410月份,集中在67月份的洪水,占60%以上。渫水为山区性河流,坡度大、汇流迅速、洪水涨落快、洪峰滞时短。1.2.2 工程地质(1)料场地质条件易家坡料场位于坝址左岸
16、上游3.5km处,皂市至阳泉公路从附近通过,交通方便。该料场为南高北低的单面坡,地形坡度25 35,冲沟不发育,高程255400m。区内出露地层为三叠系嘉陵江组上段(Tij31)与中段(Tij24)中厚厚层状灰岩、白云质灰岩、灰质白云岩,第四系全新统坡积物零星覆盖,覆盖层厚13m。易家坡料场八个平硐揭示区内夹层和落水洞发育,且均充填有泥。泥呈黄褐色、黄色,稍湿湿,人工剥离容易。夹层大多数延伸稳定,以薄层为主,由平洞口向洞里夹层逐渐变薄、减少。落水洞顺层发育,稍有切层,洞径0.31.5m,洞内充填黄泥。料场勘探范围内的剥离层厚度一般89m,有用层厚度按30m计,储量达500万m3。料场岩性主要为
17、隐晶灰岩及含白云质灰岩,少量的生物碎屑灰岩。料场区内岩石的干容重26.127.3KN/cm3,吸水率0.952.08,孔隙率一般2.575.43,单轴饱和抗压强度52.097.0Mpa。岩石矿物成分鉴定见表1.2-1。(2)砂石加工系统地质条件系统位于拟开采区北侧坡脚一带,高程148m以上,地貌为南高北低的单斜顺向坡,高程160m以上地形坡度2535,高程160m以下地形坡度2025。地表见有顺山坡倾向岩溶沟槽,长度75200m不等,其中有数条延伸至开采区,沟槽深度23m,宽1525m,属宽缓型,对地形切割不明显,总体地形相对较完整。表1.21 岩石矿物成分鉴定表岩石编号岩石名称矿物成分( %
18、)方解石白云石褐铁矿石 英黄铁矿赤铁矿有机质1-1 含白云质砾屑灰岩79200.50.20.10.11-5含生物碎屑灰岩980.50.20.10.52-3含白云质鲕粒灰岩851010.30.1212-7隐晶灰岩9610.50.50.10.213-3隐晶灰岩9810.50.10.13-7隐晶灰岩9810.50.20.11.3 交通条件1.3.1 场外交通条件皂市水利枢纽现有对外交通条件比较好。石门县城距皂市镇17km,为山岭重丘三级公路,沥青混凝土路面。皂市镇至坝址2km,沿渫水河两岸均有乡村公路相通,且一直延伸到库区内。石门县城对外交通十分便利,有枝柳铁路和长石铁路经过;公路直通本省的长沙、常
19、德和周边各县,以及湖北的武汉、沙市、宜昌等地。1.3 2 场内交通条件场内施工道路总长12.7km,右岸4.60km,左岸8.1km(其中隧洞二处,共长约1.0km)。左岸上坝公路总长约1.8km,其中隧洞约0.5km,起点与左岸上坝公路相接,终点为易家坡人工骨料场(桩号k2+811.253)。1.4 合同项目和工程范围1.4.1 工程施工的区域范围(1) 本标工程范围为:易家坡人工砂石系统(含料场开采)设计、建安和运行。(2) 本合同范围的具体内容包括:1) 料场的开采规划、施工道路的设计及施工。2) 人工砂石系统的设计和建设(包括供水、废水处理系统、供电、供风、通信和系统内道路等配套设施)
20、。3) 人工砂石系统生产运行和维护管理,包括毛料开采运输、砂石料生产、设备维修等,并按需、按时、按质、按量向用户供应合格的人工砂石成品骨料。4) 人工砂石系统运行完毕后拆除及场地恢复。5) 人工砂石系统建设和运行所需的临建工程的设计、施工、安装和拆除。6) 人工砂石系统建设和运行所需的营地的设计、施工、安装和拆除。1.4.2 工程总进度计划和控制性工期人工砂石系统计划于2003年11月15日开工,2004年9月1日之前完成人工砂石系统的土建和安装工程,2004年10月1日之前完成系统调试和试运行,系统投产日期为2004年10月1日,同时向大坝承包人等供应合格的人工砂石成品骨料。系统建设期为11
21、个月。1.5 发包人提供的条件1.5.1 材料在建设期所用砂石料在皂市工地十家坪,砂石料以定价供应。水泥、钢筋、汽油、柴油由发包人选择的供应商在承包人工地仓库车上交货,火工材料在发包人选择的供应商工地炸药库自提。供应商(发包人选择的)在工地交货后,承包人负责上述材料运输、卸车、验收、保管,向承运人出具收货收据,并承担上述工作的全部费用。关于材料质量。承包人应按本合同条款的规定对发包人选择的供应商供应的材料的质量进行检验,并对材料质量负责。本合同工程由供应商(发包人选择的)供应的材料,仅限于本合同工程使用。1.5.2 供电(1) 易家坡人工砂石系统建设期供电接口位于易家坡隧洞出口临江侧,承包人在
22、发包人指定地点(供电接口)自10KV主干线路T接10KV分支线路。(2) 承包人负责设计、施工、采购、安装、调试、管理和维护由发包人指定的终端杆至所有施工区和生活区的输电线路、配电所及其全部配电装置和功率补偿装置,并承担一切费用。(3) 电力计量在10KV高压侧计量,承包人分别装设经有关部门检验合格的计量装置,检验费用由承包人承担;变压器损耗、10KV线路损耗,由承包人承担。1.5.3 弃料场易家坡人工砂石系统建设及料场剥离和开采期间的弃场为移民公路外侧。弃渣包括人工砂石系统建设期的所有废料和料场无用的剥离料。平均运距暂按2km计。1.6 工程特性及难点分析与对策1.6.1工程特性及难点分析易
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- zk 人工 骨料 筛分 投标 施工组织设计
链接地址:https://www.31doc.com/p-2141540.html