w翔乃钢中结构工程施工技术及质量验收资料.doc
《w翔乃钢中结构工程施工技术及质量验收资料.doc》由会员分享,可在线阅读,更多相关《w翔乃钢中结构工程施工技术及质量验收资料.doc(138页珍藏版)》请在三一文库上搜索。
1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .钢结构工程概况表鲁GG001 一般情况工程名称烟台翔乃建筑工程机械有限公司厂房建设单位烟台翔
14、乃建筑工程机械有限公司建设地点烟台市福山区设计单位烟台大学建筑设计研究院建筑面积9189监理单位烟台开发区正德项目管理有限公司施工单位钢构施工济南鲍德钢结构有限公司总层数单层地上层数一层地下层数抗震等级七度建筑等级二级主体总高9.5m最大跨度60.48m开工日期2009年6月2日竣工日期2009年 7月30日钢结构 主体技术要求质量标准简介本工程为轻钢结构工程,柱、梁为焊接H型钢,高强螺栓为M2075,焊缝标准为二级焊缝,焊缝执行标准为钢结构工程施工质量验收规范GB50205-2001其他山东省建筑工程管理处监制施工组织设计(施工方案)报审卡 鲁GG003 致: 烟台开发区正德项目管理有限公司
15、 (监理单位)烟台翔乃建筑工程机械有限公司厂房 工程施工组织设计(施工方案)编制完成,经我单位审核完毕,现呈报,请批示。 申报单位:济南鲍德钢结构有限公司项目经理: 日 期: 2009年6月3日 审批结论你单位报送的 烟台翔乃建筑工程机械有限公司厂房工程 的施工组织施工方案经审核,符合施工图纸及设计、施工质量验收规范要求,技术先进、可行,方案经济,同意按其施工。监理单位:烟台开发区正德项目管理有限公司(章)监理工程师: 日 期: 2009年6月3日 工程定位测量 鲁GG006 工程名称烟台翔乃建筑工程机械有限公司厂房施工(测量)单位济南鲍德钢结构有限公司图纸编号结施-02施测日期2009-05
16、使用仪器3DJ6经纬仪、S3水准仪、50米钢卷尺复测日期2009-06允许误差依据工程测量规范GB50206-93:边长误差为1/5000仪器校验日期2009-02定位抄测示意图:详见图纸复测结果: 复测结果符合工程测量规范GB50206-93及施工测量方案要求。测量人: 复测人: 验收意见监理单位:烟台开发区正德项目管理有限公司监理工程师: 2009年 06月2日施工单位:济南鲍德钢结构有限公司项目技术负责人: 2009年06月2日山东省建设工程质量监督总站制标高抄测记录 鲁GG007 工程名称烟台翔乃建筑工程机械有限公司厂房抄测日期2009-06-02抄测部位基础平面抄测内容基础标高高程抄
17、测依据:1、 结施-02,结构平面布置图2、 工程测量规范GB50206-93抄测说明:略检查意见: 抄测符合设计、工程测量规范GB50206-93及施工规范要求。验收意见监理单位: 烟台开发区正德项目管理有限公司监理工程师:2009年06月2日施工单位:济南鲍德钢结构有限公司项目技术负责人 : 2009年06月2日山东省建设工程质量监督总站制钢结构主体整体垂直度、平面弯曲、标高观测记录 鲁GG008 工程名称烟台翔乃建筑工程机械有限公司厂房结构形式轻钢结构施工阶段钢架主体观测日期2009-06垂直度测量(全高)平面弯曲(整体)标高测量(全高)观测部位实测偏差观测部位实测偏差观测部位实测偏差(
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 翔乃钢中 结构 工程施工 技术 质量 验收 资料
链接地址:https://www.31doc.com/p-2164050.html