1、security, and peace, volunteers for the integrated prevention patrol team, formed red armbands normalized patrol, patrol visits, extensive collection of reporting social conditions and public opinions, discover and master, resolve contradictions and problems, so that early discovery, early control,
2、early solve. Six is the strict application of the system of accountability, and no grasp of the information, contradictions and disputes are not in place, mediation is weak, measures are not implemented major mass incidents, firmly holding those responsible accountable. 5, peace-building comprehensi
3、ve management campaigns. Is a combination of a comprehensive management awareness month in Jinhua city community organization related departments to carry out comprehensive management awareness month square campaign. Zone print issued a letter addressed to residents and other publicity materials mor
4、e than 3,000 copies, placing publicity boards 22, flying the banner more than 20 articles, issuing security security manuals, small security fans, legal books, against the cult, anti-drug publicity more than 400 copies, fill in hundreds of anti-evil commitment card, received excellent publicity. Mea
5、nwhile, Angolan group, at the invitation of Wang Daofei, Deputy General Manager of residential households small technology and security field publicity and demonstration, highly praised by area residents, creating a strong atmosphere. II is a combination of spiritual civilization and construction of
6、 harmonious community goal, the morning of August 22, zone comprehensive management office joint development zone police station in Jinhua city community organized to create a peaceful community, enhance the public sense of square with the theme of campaign. Activities through community police stand
7、, anti-theft lock shows, award-winning security knowledge quiz, people wrote and performed by cultural and sports programs and other content, reflect the heart of community residents to, toward pleasure and away from pain, expect peace and wishes to live and work in harmony! peoples public security
8、and social satisfaction continues to rise. Powerful advocacy the objectives and tasks of peace-building, integration of the system of spiritual civilization. Third is to carry out mass sense of household information and survey activities. Activities, total household issued a letter to 7,184, questio
9、nnaires to 7,184. Judging from the statistics, answer the security of social security 56.3%, safe 28.1%; answers caused insecurity in 15.6% (such as theft, fraud, food safety and other factors). Through this survey, let us find out the area of social security, we isolate the issue in the future work
10、, improving its working methods in a timely manner, maintain social order and stability of the development zone.Second, 2016 plan a is to further strengthen the stabilisation mechanism, continue to inactivate the gold leaf Garden two certificates handling contradictions and disputes is the current f
11、ocus, based on the actual, and strive to further in 2016, finish gold leaf Garden two certificates handle disputes passivation collapse; in the focus poll to resolve work, and strive to resolve the 1-2 old appeal and often visited. Also increase the intensity of contradictions and disputes mediation
12、, disputes and mediation, mediation success rate rate 100% above 98%. II is according to law rule district led group of requirements, combined zone work actual, timely summary 65 Franco-Prussian five years to of work practice, tightly around law ruling of work 施工组织设计第一章 编制依据1.1本工程设计施工图纸、图纸会审纪要、施工合同及
13、业主要求;1.2本工程地质勘察报告及相关地质水文资料、施工现场及周围环境的实际情况等;1.3 中华人民共和国建筑法、中华人民共和国合同法、建筑工程质量管理条例等相关的法律、法规;1.4现行质量验收规范:建筑工程施工质量验收统一标准GB503002001地下工程防水技术规范GB50108-2001建筑设计防火规范GB50016-2006建筑地基处理技术规范JGJ79-2002建筑抗震设计规范GB50011-2001建筑施工组织设计规范GB/T50502-2009建筑节能工程施工质量验收规范GB50411-2007建筑装饰装修工程施工质量验收规范GB50210-2001混凝土结构工程施工质量验收规
14、范GB50204-2002砌体工程施工质量验收规范GB50203-2002地面与楼面工程施工质量验收规范GB50209-2002屋面工程施工质量验收规范GB50207-2002钢筋焊接及验收规范JGJ 18-2003建筑电气工程施工质量验收规范GB50303-2002建筑给水排水及采暖工程施工质量验收规范GB50242-2002中型砌块建筑设计与施工规程JGJ-80建筑机械使用安全技术规程JGJ33-2001施工现场临时用电安全技术规范JGJ 46-2005建筑工程施工现场供用电安全规范GB50194-93钢筋机械连接通用技术规程JGJ107-20031.5建筑施工安全检查标准JGJ59-99
15、;1.6建筑工程安全管理标准DBJ04-253-2007; 第二章 工程概况2.1工程主要情况本工程地下室为地下汽车库,地上为丙类厂房,位于华丰北路西侧, 2.2建筑设计简介本工程由A、B、C、D四个车间组成,且A段与B段、C段与D段通过连廊连通,每个车间的平面尺寸为106.9m27.7m,总建筑面积为25848.34m2, 地下一层,地上三层,地下一层层高4.8m,地上一三层层高4.2m,室内外高差为1.95m,建筑总高度为14.55m。本工程设计使用年限为50年,抗震设防烈度为7度,结构抗震等级为三级,防水等级为二级,防火等级二级,地下耐火等级一级,地上耐火等级二级,砌体结构质量控制等级为
16、B级。本工程地下室底板及外墙均设两道防水,一道钢筋混凝土自防水,一道1.5厚PET自粘聚合物改性沥青防水卷材层,配电室在内部做一道12厚聚合物水泥砂浆防水层从底至顶。不上人屋面采用1.5厚PET和3.0厚BAC自粘聚合物改性沥青防水卷材,保温板采用5.0厚挤塑聚苯板,路面屋面采用1.5厚自粘聚合物改性沥青卷材防水层。本工程共设置12部货梯,货梯、楼地面、内外墙以及门窗、幕墙等装饰装修工程和节能工程二次设计、施工。 2.3结构设计简介本工程结构为框架结构,结构平面布置通过伸缩缝将建筑分成各自独立的主体。基槽开挖后进行铲探,孔距1.2m,孔深3m,梅花形布置。地基采用3:7灰土换填1.5m深,基础
17、为钢筋混凝土柱下独立基础和墙下条形基础,其余部位设置250mm厚的防水板,防水板垫层下铺设表观密度不小于25Kg/m3的50mm厚聚苯板。基础及防水板采用2m宽的膨胀加强带进行分割。本工程混凝土强度等级见下表:主体结构构 件 部 位混凝土强度等级备 注基 础基础、防水底板:C30;基础垫层:C15基础拉梁、基基础、防水板及地下室外墙为P6级防水混凝土-0.05m标高以下框架柱、混凝土外墙:C35;梁板、楼梯、坡道:C30-0.05m8.35m标高框架柱:C35;梁板、楼梯:C308.35m标高以上框架梁板柱:C30圈梁、构造柱C20本工程基础钢筋采用HPB235、HRB335级钢筋,主体结构以
18、HRB400级钢筋为主。地下室外墙采用300厚钢筋混凝土墙,内墙在-4.8m以下采用M7.5水泥砂浆砌筑MU10烧结实心砖240mm厚,-4.8m以上采用M5水泥砂浆砌筑A3.5加气砼砌块200mm厚。0.000以上外墙为300mm厚,内墙为200mm厚,采用M5混合砂浆砌筑A3.5加气砼砌块。2.4安装设计简介本工程供电电源由室外变压器引来,配电室内低压柜采用上进上出式,放射性供电。总进线柜采用固定式配电柜,电井内的配电箱、电表箱明装。消防用电设备的配电线路暗敷时穿钢管敷设,照明导线穿SC管暗敷设。建筑物防雷按三类防雷设防,并设置总等电位联结,屋顶设10热镀锌圆钢做避雷带,利用钢筋砼柱或墙内
19、钢筋作为引下线,以基础内钢筋焊接形成接地网,本工程接地型式采用TN-C-S系统。2.5工程施工条件及特点2.5.1 场地原为多年的垃圾堆场,建设单位将垃圾清理后整个场地坑洼不平,相对高差约5m左右。2.5.2地质条件:根据本工程岩土勘察报告,场地自上而下土层分层如下:第层,填土,平均厚度0.89m,具有湿陷性,建议承载力70KPa;第层,湿陷性粉质粘土,平均厚度1.15m,浅黄褐、黄白色,硬塑状,建议承载力120 Kpa;第层,湿陷性粉质粘土,平均厚度1.6m,黄红、浅黄红色,局部钙质结核密集,硬塑-坚硬状,建议承载力160 Kpa;第层,粉质粘土,平均厚度3.18m,黄红色,颗粒状结构,硬塑
20、-坚硬状,建议承载力200 Kpa。地下水为潜水,静止水位埋深4.6m-7.9m,场地土及地下水对混凝土中钢筋具有微腐蚀性。2.4.3本工程施工用水采用在现场打深井取水。施工用电从距施工现场约300m的高新区分配电室埋地引入施工现场。2.4.4本工程施工现场距 砼搅拌站约1Km,距离外环路较近,材料进场及运输不受时间的限制。第三章 施工部署3.1项目施工总目标3.1.1工程施工进度目标本工程计划于2011年3月29日开工,2012年6月30日工程主体全部完工。拟定456日历天。3.1.2工程质量目标指标本工程质量目标为合格,各分部质量指标如下:地基与基础工程 达到国家规范要求的合格 企业自评优
21、良主体结构工程 达到国家规范要求的合格 企业自评优良质量控制资料 全部符合施工规范的要求安全和使用功能核查 一次达标观 感 评定为“好”3.1.3工程施工安全管理目标指标目标:杜绝重大伤亡事故,减少各类事故和职业病的发生。指标分解:因公伤亡、重伤事故频率为0,轻伤事故频率在12以内;职业病患率1;重大机械设备事故为0;火宅事故为0;全员安全培训率100%;特种作业人员持证上岗率100%;特种设备检测合格率100%;贯彻执行长治市安全文明工地标准。3.1.4工程施工环境管理目标生产、生活污水排放达标;降低废气排放;控制降低粉尘排放;降低、减少噪声排放;固体废弃物有效控制;危险化学品有效控制;节约
22、能源、资源。3.1.5工程施工成本管理目标材料费成本降低达到9%;材料采购成本降低5%;钢材原材料降耗4%;水泥原材料降耗4%;木材原材料降耗6%;机械费降低40%以上。3.2施工顺序根据工程特点及施工进度的要求,A段与B段同时施工,主体完成后开始C段与D段的基础工程施工。两段合并后单层面积较大,施工时拟采用每层分段流水进行作业。基础施工阶段:基础底板按膨胀加强带位置分四段进行流水作业,地下室剪力墙和梁板按变形缝分六段进行流水作业。(各层流水段分割见附图)各工序施工顺序,土方开挖聚苯板铺设砼垫层浇筑砖胎模砌筑防水卷材施工防水保护层浇筑底板钢筋制作底板砼浇筑底板砼养护地下室剪力墙外架搭设地下一层
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。