溢流池三施工方案.doc
《溢流池三施工方案.doc》由会员分享,可在线阅读,更多相关《溢流池三施工方案.doc(18页珍藏版)》请在三一文库上搜索。
1、of 16 session brought to adhere to people-oriented, all-round, coordinated and sustainable scientific development view, promoting economic and social and human development. The core of the scientific Outlook on development is people-oriented. Implement the scientific concept of development and first
2、 implementation of people-oriented requirements. Office of the Party Committee of this years work, we have to firmly establish the idea of people-oriented philosophy, richness of understanding the people-oriented, seriously implement people-oriented requirements correctly grasping the practice of pe
3、ople-oriented, through people-oriented three services working process, pushing the city Party Committee Office work to a new level. Investee (b) investee by people-oriented, in the final analysis is centred, human premise, a human-powered, human purpose. People-oriented thinking long. As early as th
4、e spring and Autumn period of more than 2000 years ago, Qi Guan Zhong: overlord of the beginning, and people-oriented. Principle of the solid. For thousands of years, traditional Chinese political culture there is a wide variety of people-oriented thought. Pan Gengs people to the Duke of Zhous prote
5、ct and then to Confucius man, from his your KingLight to the idea of Grand boat water and then to advocate since the Han and Tang dynasties nation , these useful idea is, is the country of the people, political sources. The rulers of people, the San Zhi bei yan; the rulers of thin people, then died
6、suddenly. The West ever since the Renaissance, it is because of the rise of humanism, really started to self awareness, self discovery and self-reflection. Predecessors in criticism of Marx and Engels thought on the basis of the outcome of, according to the great discovery of historical materialism,
7、 reveals the true nature of human existence, the ideology was essential and strongly suggests, as provided. In 1894, the Engels from Marxs writings, singled out his favorite passage for the new century weekly solemn inscriptions: there, the free development of each is the free development of all peo
8、ple. In modern society, people-oriented thinking more and more attention. People generally regard it as a kind of economic and social development, a principle, a requirement, as a need to maintain the interest of the people of, a pursuit, a purpose. This idea was praised, with the profound connotati
9、on and practical significance. Investee 1. people answering epistemological questions and answered the questions of methodology. People contains a profound philosophical, epistemological and methodological significance of science. Known as epistemology, refers to the theories on the relationship bet
10、ween knowledge and practice. In the view of Marx and Engels, man is mans world, is the State, society, and history writers and characters. In other words, the world is one world, society is human society. We know the society, starting from the people to observe; we know the practice, from the people
11、 to study; we knew Office work, from the people who set out to explore. Ignoring this, will she seek目 录一.编制依据二.工程概况三、施工准备四、施工要点及措施五、质量保证及质量通病预防措施六、安全保证措施七、文明施工措施八、计划工期及保证措施九、主要消耗材料用量计划十、主要周转材料计划十一、主要施工工器具计划附图一编制依据 1.1溢流池土建施工图F1082S-T0304021.2砼结构工程施工质量验收规范GB50204-20021.3电力建设安全健康与环境管理工作规定1.4韩城第二发电厂土建专
12、业施工组织设计1.5电力建设施工及验收技术规范(建筑工程篇SDJ69-87)1.6火电施工质量检验及评定标准二 工程概况溢流池位于捞渣机基础以西,1/23 1/24之间,K2K4之间。0.00相当于绝对高程408.0m。溢流池顶面标高+0.05m,底面标高为-2.0m,垫层顶标高-2.40m,垫层厚100mm,垫层下为2:8灰土。四周池壁厚300mm,底板厚400mm。溢流池顶四角上预埋扁铁2Q-100(*)C,并在东西两壁上各布置6个预埋铁件Q-2015C,上面焊一根 20的槽钢,沿东西方向布置,并在其上铺一层6mm厚花纹钢板。在溢流池西南角设一爬梯。池壁东面中间设置一个600500的预留孔
13、洞作为排水出口。钢筋:级 ,直径为16mm,未注明的拉筋为8mm。保护层为50mm;池壁砼C30、S6,垫层C10。 三施工准备31现场“三通一平”已完成;32灰土垫层已回填到位,经相关部门复检,平整度、标高及密实度满足下道工序要求,工序交接完。3.3钢筋车间,砼搅拌站已在附近布置好(原一期),已随时具备供应条件。3.4在现场基坑边沿南、北侧各设置3500w镝灯一台,以满足现场照明要求。现场准备标准(活动)电盘4个,以满足移动照明和电动工具的使用要求。3.5施工料具已基本到位,满足施工需要。3.6特殊工种人员必须进行入场教育培训,持证上岗。3.7预埋件已加工,设计要求各种特殊材料均到位。3.8
14、施工人员已接受交底(安全、技术)。四施工要点溢流池分一次施工,预埋铁件固定好后一次施工到顶。施工工序:定位放线垫层支模垫层砼二次放线验收脚手架搭设(底板钢筋临时支撑)绑扎底板钢筋和池壁钢筋放置铁件验收(W点)模板支设加固验收砼浇筑养护拆模4.1主要施工措施4.1.1根据溢流池设计坐标A=950.97,B=758.2,测量人员冲出K3、1/23线作为施工放线基准线,现场施工人员根据需要翻设其他施工用线。4.1.2砼垫层施工,按3.0布置一标高控制点(30钢筋头),收面木夯搓两遍,钢抹一遍,拍实收平。4.2钢筋工程4.2.1钢筋严格按图放样,放样单必须经钢筋加工车间技术员复核,并确认无误后交付配制
15、,并统一挂牌。4.2.2采用250型,180型拖拉机运输钢筋,钢筋运输人员在现场按尺寸、型号分别归类堆放整齐。4.2.3绑扎前,仔细核对成品料的规格、数量、形状是否与图纸相符,以免引起返工。钢筋绑扎,严格按图纸设计及规范要求执行,画线排列,接头按要求错开,在同一截面,不能大于50%。4.2.4网片筋交叉处,全部绑扎。绑扎完毕后,要进行隐蔽工程验收,签字后,方可进入下道工序。溢流池底部钢筋保护层用505040的同强度等级砼垫块(间距约1.51.5)垫设。4.2.5底板面层钢筋施工前,先搭设钢管临时支撑架,绑扎完成后,用25马凳撑筋支撑面筋,每2.0一个,经验收合格后,方可拆除原临时钢管支撑。4.
16、2.6雨过天晴后,钢筋绑扎前必须将钢筋上的干硬泥块和污垢用钢刷刷尽,清理干净后方可绑扎。4.2.7钢筋负温焊接,采用电弧焊满焊,当环境湿度底于-20时,不宜施焊。4.2.8负温电弧焊焊接电流应微弱增大,焊接速度适当减慢。在焊接过程中,一般应采用短弧施焊,防止断弧,且不要产生烧伤现象和非焊接部位引弧。4.3模板工程4.3.1模板安装前,复查垫层标高。4.3.2模板安装前仔细选模,将模板面清理干净,并刷油。4.3.3模板采用多层板加木背档工艺,加固采用地锚支撑及钢管背楞,每隔1.2m设钢管锚固桩,抛撑间距1.2m,斜撑间距900mm。为防止板墙胀模,设对拉螺杆,拉杆间距600mm或900mm。(见
17、附图)4.3.4预埋铁件用钢管固定于架管上,位置标高核实无误方可封模固定。4.4脚手架工程脚手架采用双排脚手架,第一排立杆距池壁300mm,立杆间距1.5米,步距1.5米。4.5砼工程4.5.1砼浇筑前检查模板加固是否牢固可靠(包括扣件是否松动、支撑是否合理、地锚是否牢靠),模板内是否清理干净4.5.2砼由搅拌站集中拌制,2台罐车运输,一台泵车浇筑。泵车由西向东依次分层浇筑(行车路线见附图),分层浇筑厚度不大于500。上层砼在下层砼初凝前浇筑,间隔时间控制在1-1.5h内。4.5.3砼浇注前必须清除模板和钢筋上的污垢,浇筑时尽量加快砼的浇筑速度,防止热量散失过多。4.5.4严格控制砼的入模温度
18、,使其入模温度不得低于5。4.5.5砼振捣要求插点均匀布置,插点间距不大于400“快插慢拔”,振动棒按交错式振捣,上层振捣必须至少插入下层砼50-100。适当延长振捣时间510s,以增加砼的密实度,改善砼的内部结构。收面时用砼木夯搓两遍拍实抹平,初凝前,钢抹两遍压光(12小时左右)。砼终凝后,对砼及时养护,养护时在砼面铺二层塑料薄膜,加盖两层麻袋片进行保温养护,养护时间不得少于14天4.5.6砼模板拆除前砼强度不得低于砼强度标准值的30。4.5.4一次施工至溢流池顶。4.6防腐及防水工程砼F150、W6,铁件刷防腐漆,水池槽内壁做防腐处理,具体做法装饰工程定。五质量保证及质量通病预防措施:5.
19、1 建立质量保证体系,增强全员质量意识。5.2 坚决执行“四级”验收制度(自检,队级检查,项目部级,监理)上道工序不合格不准进入下道工序。5.3 钢材质证必须齐全,并经现场验证后方可使用。5.4 砼搅拌、运输、浇筑机械要有专人负责调度。5.5 砼浇筑严格按交底执行,并设专人负责实行旁站制。所有的埋件、预留孔洞必须逐个检查记录,固定措施要牢靠,浇筑过程中专人监看。5.6 试验室应现场密切配合,根据现场做的塌落度试验及时调整配合比,并按规范留设试块。未经试验人员同意,任何人不得以任何理由随意加水,一经发现严重处罚。5.7 砼浇筑后要及时抹面,二次抹压收光,并及时养护。养护设专人负责。5.8 砼浇筑
20、前,模板下口用砂浆堵严。5.9 拼模所加木料要刨平刨直,在木料上穿孔,用12螺栓与模板固定牢固。5.10劳动力计划序号工种人数(人)备注1木工252钢筋工153砼工54架子工105小机工36电火焊工27技术员1合计:61人5.11质量控制程序 工序施工完毕 返 工 或 翻 修 合格 施工班组自检 合格施工队复检 合格 项目经理部专检合格通知监理工程师合格 不合格监理工程师检查合格签署质检合格意见合格 进入下到工序512质量标准模板安装允许偏差项目允许偏差()检验方法轴线位移5钢尺检查截面尺寸45钢尺检查垂直度6吊线,钢尺检查相邻板面高低差2钢尺检查表面平整度(2米以上)52米靠尺和塞尺检查预留
21、孔洞中心位移3钢尺检查截面尺寸偏差100钢尺检查现浇砼结构尺寸允许偏差和检验方法允许偏差()项目检验方法轴线位移10钢尺检查垂直度8经纬仪或吊线,钢尺检查标高10水准仪或拉线,钢尺检查截面尺寸+8-5 钢尺检查预埋件中心位置10钢尺检查钢筋绑扎允许偏差项目允许偏差()检验方法网眼长宽10钢尺检查骨架高和宽5钢尺检查骨架的长10钢尺检查箍筋间距20连续三档,钢尺检查受力钢筋间距10钢尺检查主筋保护层偏差3钢尺检查预埋件中心线5钢尺和检查水平偏差-2, 05.13 队级质保体系:队长:冯云峰 技术专责:刘鹏辉施工员:马小军 技术员:解庆辉 质检员:杜森小机班 木工班 钢筋班 架子班 砼班 综合班六