建筑承包商健康和安全资料 Construction Contractors Health Safety Pack 非洲矿业有限公司AML HSE安全管理制度 英文版.doc.doc
《建筑承包商健康和安全资料 Construction Contractors Health Safety Pack 非洲矿业有限公司AML HSE安全管理制度 英文版.doc.doc》由会员分享,可在线阅读,更多相关《建筑承包商健康和安全资料 Construction Contractors Health Safety Pack 非洲矿业有限公司AML HSE安全管理制度 英文版.doc.doc(38页珍藏版)》请在三一文库上搜索。
1、Form:SWI-F0402B Revision:Rev 0 Construction Contractors Health -using the principles of the Hierarchy of Controls (Best to Worst guide in this pack) in all design, fabrication and construct activities to minimise the risk to all personnel in the workplace; -carrying out a design review with the AML
2、ECF Project team to assist in the identification of further risk reduction controls measures. -participating in the planning and design stages of trade activities; -stimulating a high level of safety awareness at all times; -identifying safety training needs; -leading by example; -ensuring safe equi
3、pment and plant is provided and maintained; -ensuring correct and safe work practices at all times; -assisting in the identification and preparation of safe work procedures; -reviewing safety reports and inspections and initiating rectification where necessary; -participating in accident/incident in
4、vestigations; -participating in safety meetings and programs; -monitoring compliance with safe work methods (controls); Site Supervisor duties include: Insert name -implementing the company Health, Safety and Rehabilitation procedures; -observing all H -ensuring that all works are conducted in a man
5、ner safe and without risk to employees health and safety; -planning to do all work safely; -providing advise and assistance on H -participating in the planning and design stages of trade activities; -ensuring current H -identifying H -actioning safety reports and carrying out workplace inspections;
6、-preparing and participating in safety meetings and safety programs; -facilitating the preparation of Work Method Statements and Job Safety Analysis for the trade; -insisting and ensuring on safe work practices at all times; -investigating hazard reports and ensuring that corrective actions are unde
7、rtaken; -conducting project inductions, toolbox talks and daily team briefings; -participating in accident/incident investigations; -leading by example and promoting H -supervising and ensuring compliance with safe work procedures; -providing suitable employment to assist rehabilitation initiatives;
8、 -stimulating a high level of safety awareness at all times; Revision: Rev 0 Date: 16-04-2010 Contractors Health -communicating safety performance to the Project Manager; -providing advice and assistance on H -participating in the planning and design stages of trade activities; -monitoring H -monito
9、ring compliance with safe work procedures; -co-ordinating rehabilitation for injured employees; -reviewing safety reports and inspections; -preparing and participating in safety meetings and programs; -facilitating Tool Box Talks on a regular basis; -insisting on correct and safe practices at all ti
10、mes; -preparing and conducting project safety inductions; -investigating and developing new H -conducting accident/incident investigations; -leading by example and promoting H -stimulating a high level of safety awareness at all times; -communicating with the H -facilitating the maintenance of all r
11、ecords as required under this Pack; -participating in regular workplace inspections and ensure that any improvements resulting from such an inspection are actioned in the required time frame. 4.0DOCUMENT CONTROL Issue, Revision and Review The Company is responsible for: Completing the Health -increa
12、ses knowledge about the job; -provides a pre-start check for the job; -improves safety management; -clearly defines individual roles and responsibilities. A JSA shall be completed for all activities that: -are identified as having a high potential to causing serious injury and/or equipment and mater
13、ial damage; -deviate from standard practices. There are five steps in the JSA activity: a.break the job into basic steps; b.identify any potential hazards for each step; c.assess the risk for each identified hazard; d.identify controls to eliminate or minimize each hazard; e.assign responsibilities
14、to personnel to implement the controls. The Supervisor responsible for the planned work activity shall complete a JSA Work Sheet (Form SSP-F03) together with the relevant personnel involved in the work activity. The Supervisor shall discuss the JSA report with the personnel required to perform the w
15、ork via a tool box meeting. The JSA Work Sheet shall be distributed as follows: -Original:Site Safety Advisor; -Copy One:Supervisor in charge of the work activity and must be available on site. 7.0SKILLS AND COMPETENCIES Procedure The Company will ensure that its employees are adequately trained to
16、a level of competency sufficient to ensure their health and safety when at work. Assessment The Company will undertake a training/competency assessment of all employees prior to the commencement of work on the nominated site. Where skill deficiencies are detected appropriate training will be provide
17、d before work commences so that employees can perform their designated duties safely. Revision: Rev 0 Date: 16-04-2010 Contractors Health Toxicity (short and long term); Carcinogenic classification if relevant; Chemical action and instability; Corrosive properties;Extent of PPE required; Environment
18、al hazards;Storage requirements. Storage All storage and use of hazardous substances will be in accordance with the MSDS. All hazardous substances will be stored in their original containers with the label intact at all times. Hazardous substances of any quantity will not be stored in crib rooms, co
19、ntainer sheds or offices. Use Where practicable the material with the lowest possible hazard capability that meets the technical requirements for the job will be used. Advice on a substance may be obtained from a chemical database, e.g Chemwatch. Prior to using the hazardous substance all workers in
20、volved in its use will be provided with adequate information and training to allow safe completion of the required task. Confirmation of this training will be provided by a sign off of training recorded on the Training Record (Form SSP-F04.) 11.0Lifting Gear Procedure: The Company will ensure that a
21、ll lifting gear (chains, slings, wire rope, shackles, hooks) to be brought on site have a current certificate of test and are listed in the register Lift Equipment Register (Form SSP-F07). The register will be maintained during the course of the contract. Assessment All lifting slings and accessorie
22、s will be marked with the manufacturers identification, Safe Work Load and the grade of the steel or alloy. The Company will provide each item with a marked identification number and a current test certificate for each will be held on site and made available on request. Selection b)Notifying their s
23、upervisor of any concerns that their fitness for work may be impaired; c)Identifying safety hazards including co-workers who may be unfit for work and bringing them to the attention of their immediate Manager/Supervisor; d)Ensuring that any prescription or non-prescription medication is taken safely
24、; e)Notifying their supervisor or safety representative of any unauthorised possession or consumption of alcohol or other drugs on the site or during work time; f)Cooperating with a request by a Manager/Supervisor or an authorised collector to undertake an alcohol or other drug screening test. It is
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 建筑承包商健康和安全资料 Construction Contractors Health Safety Pack 非洲矿业有限公司AML HSE安全管理制度 英文版.doc 建筑 承包商 健康 安全 资料
链接地址:https://www.31doc.com/p-2190620.html