《10kV~500kV输变电及配电工程质量验收与评定标准》(2012版)_变电电气试验验评表.doc
《《10kV~500kV输变电及配电工程质量验收与评定标准》(2012版)_变电电气试验验评表.doc》由会员分享,可在线阅读,更多相关《《10kV~500kV输变电及配电工程质量验收与评定标准》(2012版)_变电电气试验验评表.doc(206页珍藏版)》请在三一文库上搜索。
1、is one of the practical form of values. The so-called values refers to the objective things are of no value and the value of fundamental perspective. Different values, peoples behaviour, attitudes, ways are different. People-oriented focus on human value and reality, we need the broadest masses as v
2、alues. Adhere to people-oriented values, is to make the economy more development, improve democracy, cultural prosperity, and live a happier; is deeply concerned that human development and human values, development of social and human development of rational unified, insisted in the material civiliz
3、ation, political civilization and spiritual civilization in the overall advancement of Socialist civilization to a higher level. Also want to see that persons value is not only meet your needs, also is to meet the needs of others and the community. Adhere to people-oriented, to strongly advocate eve
4、ry community member, serve others, beneficial to the community of people. The so-called Outlook, attitude is on the record, including who, how to create a record of achievements, how to evaluate performance, and so on. What values, what kind of Outlook. Adhere to people-oriented Outlook, is on the p
5、remise of respecting the interests and power of people, creating a popular, warm hearts, steady heart performance, creating serve for one officer, the benefit of achievements, and overall construction of well-off society and promoting the all-round development of peoples performance. Achievement eva
6、luation in both economic accomplishments, take another look at the effectiveness of social progress; changes in both urban and rural change; both hard environment to strengthen and take another look at the soft environment improvement momentum of development at present, depending on the potential fo
7、r sustainable development. Leave people to talk about values are worthless and leave people to talk about Outlook is not what the performance. 4. people responded to the starting point of the question, and replied to questions point. Man is the sum of social relationships. We cannot leave the chichu
8、anyongdu, housing, tourism and entertainment, entertaining, and even certain political, economic, cultural and social environment, and so on. Due to human needs, all walks of life will come into being. People create for their survival, and continue enjoying the results of the construction. Colorful
9、in the transformation of the people of the world, community vitality in the creation of man. Therefore, any work we do, the starting point is human, what are people. Us speed up development, the core of which is to meet the needs of people, including survival needs, emotional needs and self-actualiz
10、ation needs. It should be noted that people are not machines, not the slave of an object, not to be controlled. People have their own personality, has its own personality, has its own dignity. Person in need of care, you need to understand, need to meet. It is said that in the agricultural society,
11、people plant; in industrial society, man is an animal; the information society, return 附录A: 变电电气试验 单位(子单位)工程质量验收与评定记录:Q/CSG表4-1.0变电电气试验 单位(子单位)工程质量验收与评定记录工程编号: Q/CSG表4-1.0项目名称单位(子单位)工程名称建设单位设计单位开工日期施工单位监理单位竣工日期序号项目验收内容业主项目部核查意见启委会验收组抽查意见1分部工程质量验收结果统计分部工程名称验收结论1.1主变压器交接试验 1.2站用变压器交接试验 1.3接地变压器交接试验1.4
12、高压并联电抗器交接试验1.5干式电抗器交接试验 1.6消弧线圈交接试验1.7 SF6电流互感器交接试验1.8油浸式(干式)电流互感器交接试验1.9电容式电压互感器交接试验1.10电磁式电压互感器交接试验1.11真空断路器交接试验1.12 SF6断路器交接试验1.13 GIS(HGIS)封闭式组合电器交接试验1.14隔离开关交接试验1.15绝缘子试验1.16电力电缆试验1.17耦合电容器试验1.18电力电容器试验1.19氧化锌避雷器试验1.20接地阻抗试验验收结果应核查分部工程数 实核查分部工程数符合标准及设计要求的分部工程数2质量控制资料核查施工试验资料2.1主变压器交接试验报告2.2站用变压
13、器交接试验报告2.3接地变压器交接试验报告2.4高压并联电抗器交接试验报告2.5干式电抗器交接试验报告 2.6消弧线圈交接试验报告2.7 SF6电流互感器交接试验报告2.8油浸式(干式)电流互感器交接试验报告2.9电容式电压互感器交接试验报告2.10电磁式电压互感器交接试验报告2.11真空断路器交接试验报告2.12 SF6断路器交接试验报告2.13 GIS(HGIS)封闭式组合电器交接试验报告2.14隔离开关交接试验报告2.15绝缘子试验报告2.16电力电缆试验报告2.17耦合电容器试验报告2.18电力电容器试验报告2.19氧化锌避雷器试验报告2.20接地阻抗试验报告2.21试验不合格项目消缺
14、整改记录2.22 WHS质量控制资料工程质量验收记录2.23主变压器交接试验质量验收记录表2.24站用变压器交接试验质量验收记录表 2.25接地变压器交接试验质量验收记录表2.26高压并联电抗器交接试验质量验收记录表2.27干式电抗器交接试验质量验收记录表2.28消弧线圈交接试验质量验收记录表2.29 SF6电流互感器交接试验质量验收记录表2.30油浸式(干式)电流互感器交接试验质量验收记录表2.31电容式电压互感器交接试验质量验收记录表2.32电磁式电压互感器交接试验质量验收记录表2.33真空断路器交接试验质量验收记录表2.34 SF6断路器交接试验质量验收记录表2.35 GIS(HGIS)
15、封闭式组合电器交接试验质量验收记录表2.36隔离开关交接试验质量验收记录表2.37绝缘子试验质量验收记录表2.38电力电缆试验质量验收记录表2.39耦合电容器试验质量验收记录表2.40电力电容器试验质量验收记录表2.41氧化锌避雷器试验质量验收记录表2.42接地阻抗试验质量验收记录表监理过程控制资料2.43监理旁站记录2.44监理初检消缺整改记录核查结果应核查资料项数实核查资料项数符合标准及设计要求项数3安全和主要功能抽查检查结果:抽查结果应核查功能项数实核查功能项数符合标准和设计要求功能项数4观感质量验收验收结果应验收项数实验收项数符合规定标准要求项数5业主项目部综合验收结论:启委会验收组综
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 10kV500kV输变电及配电工程质量验收与评定标准 10 kV 500 变电 配电 工程质量 验收 评定 标准 2012 电气 试验 验评表
链接地址:https://www.31doc.com/p-2229181.html