1、blind Board operational security requirements 1. blocking blind Board operations required to handle blocking blind Board operating license, no blocking blind Board operating license are not allowed to smoke blocking blind Board operations. 2. it is strictly prohibited to alter, lent the blocking bli
2、nd Board operating license. Content conversion and expansion of operations or transfer jobs site, again for blocking blind Board operating license. 3. incomplete job approval procedures, safety measures are not implemented, work environment does not meet security requirements, workers have the right
3、 to refuse to work. 4. toxic gas piping, equipment blocking blind Board, non-irritant gas pressure should be less than 200 mm Hg; irritant gas pressure should be less than 50 mm Hg; gas temperature should be less than 60 degrees. 5. Technical Department responsible for drawing blind location map, nu
4、mbers the blind, construction personnel work, blind location map by technology archive for future reference. 6. the blind plug operating personnel must wear appropriate personal protective equipment, must designate a person responsible for blocking blind Board work, and to designate a person respons
5、ible for monitoring. Guardians are advised by experienced officers. , Guardian jobs people must wear appropriate protective equipment as required, and guardians must check, implementing relevant safety measures on the job. Guardians must adhere to the scene, and emergency treatment. Job guardian sha
6、ll not leave the job site before the end. 7. the job complicated, dangerous places, apart from the guardian, also company leadership, safety and Environment Department, is responsible for personnel. Involving the entire production system, head of the technical department must be present. 8. in place
7、s where inflammable and explosive work, place within 30 metres without hot work operations; task lighting should use explosion-proof lamps and explosion-proof tools should be used, prohibition of beating with an iron pipe, flange, etc. 9. high blocking blind Board operation shall follow the provisio
8、ns of license for working at height. 10. construction unit to blind a lot according to the requirements of the permit to work, the implementation of safety measures, work can be carried out. 11. is strictly prohibited on the same pipe simultaneously in two places and two or more blocking blind Board
9、 operations. When plugging multiple blind, blind to blind location map and plates number by construction General Manager, unity of command assignments. 12. signs in each blocking blind Board shows that blind location. (C) the blocking blind Board permits the management of 1. . Blind location map, im
10、plement security measures, after the approval of the technical department, assignment units (staff) to confirm. Job complex, dangerous places required security audits of the Department of environmental protection, the company in charge of safety Vice President for approval. 4. approve a good blockin
11、g blind Board operating license in triplicate, main contractors, operating units, each hold a copy of the bio section. 5. after the end of the job, jobs, technical check, activity handed the blind location technology. 6. work permits management should establish the ticket file (inventory), the ticke
12、t is kept for 3 years. The lifting operation management system, purpose in order to control the production within the region, lifting, lifting activities to prevent the occurrence of accidents, the system is formulated. Second, the scope of application of this system applies to all companies within
13、the lifting operation. Third, lifting a license of graded credit three levels of management: (I) General equipment, weighing less than 1 ton of weight lifting, the lifting of the rules, technology review, workshop Director for approval; (B) the rules of weight equal to or greater than 1 ton less tha
14、n 10 tons of weight lifting, hoisting, approved by the workshop, equipment Management Department for approval. (C) of over 10 tons and heavy lifting operations projects or construction under the special conditions, shall prepare lifting plan, permit to work submitted to company executives and safety
15、 equipment, the joint security sector review competent after Assistant General Manager approval. Four, lifting safety requirements 1. lifting weights greater than or equal to 10 tonnes of the object and the subject of civil engineering structures, hoisting construction plan shall be prepared. Load i
16、s less than 10 tonnes, but small complex shapes, stiffness, length-diameter ratio, precision precious, under the special conditions of construction, should also prepare construction programmes. Hoisting construction programmes examined by the project authorities, submitted to the competent VP approv
17、al to be implemented. 2. lifting operations must set up the alert line and set up special care, guardianship personnel must wear armbands, lifting regional staff out of bounds; 3. lifting operations must be provided for lifting loads, slings, rigging and economic calculation options, do not overload
18、. When lifting heavy objects close to or reach the rated lifting capacity, check brakes, low height, short stroke after the load test, then smoothly lifted. Large and medium sized equipment before lifting, load test should be carried out. Try hanging height for about 0.2m and then conduct a reliabil
19、ity check (including the selection and calculation of safety factor). Overload lifting is strictly prohibited. 4. before lifting must pad the wood and the wood used must be of adequate size (be sure to over 1 m); when lifting requires fire escape, you must contact the circuit breaker in accordance w
20、ith the provisions; 5. lifting operations must be run on all kinds of hoisting machinery parts, safety devices as well as slings, rigging a detailed security checks, security devices for lifting equipment is sensitive and reliable, no illness. Must try before lifting crane, confirmed before they can
21、 work. 6. lifting operations, removed platform guardrail must be restored (the bolt activity fence removal is strictly prohibited); 7. lifting operations, should have adequate lighting at night, outdoor . 16, lifting the approval procedure is not complete, security measures are not XX 市城和煦路市政工程市城和煦路
22、市政工程 投投标标文文件件 项项 目目 名名 称称: XX 市城和煦路市政工程市城和煦路市政工程 投标文件内容:投标文件内容: 投标文件技术标部分投标文件技术标部分 日日 期期 : 2013 年年 4 月月 22 日日 blind Board operational security requirements 1. blocking blind Board operations required to handle blocking blind Board operating license, no blocking blind Board operating license are not
23、allowed to smoke blocking blind Board operations. 2. it is strictly prohibited to alter, lent the blocking blind Board operating license. Content conversion and expansion of operations or transfer jobs site, again for blocking blind Board operating license. 3. incomplete job approval procedures, saf
24、ety measures are not implemented, work environment does not meet security requirements, workers have the right to refuse to work. 4. toxic gas piping, equipment blocking blind Board, non-irritant gas pressure should be less than 200 mm Hg; irritant gas pressure should be less than 50 mm Hg; gas temp
25、erature should be less than 60 degrees. 5. Technical Department responsible for drawing blind location map, numbers the blind, construction personnel work, blind location map by technology archive for future reference. 6. the blind plug operating personnel must wear appropriate personal protective e
26、quipment, must designate a person responsible for blocking blind Board work, and to designate a person responsible for monitoring. Guardians are advised by experienced officers. , Guardian jobs people must wear appropriate protective equipment as required, and guardians must check, implementing rele
27、vant safety measures on the job. Guardians must adhere to the scene, and emergency treatment. Job guardian shall not leave the job site before the end. 7. the job complicated, dangerous places, apart from the guardian, also company leadership, safety and Environment Department, is responsible for pe
28、rsonnel. Involving the entire production system, head of the technical department must be present. 8. in places where inflammable and explosive work, place within 30 metres without hot work operations; task lighting should use explosion-proof lamps and explosion-proof tools should be used, prohibiti
29、on of beating with an iron pipe, flange, etc. 9. high blocking blind Board operation shall follow the provisions of license for working at height. 10. construction unit to blind a lot according to the requirements of the permit to work, the implementation of safety measures, work can be carried out.
30、 11. is strictly prohibited on the same pipe simultaneously in two places and two or more blocking blind Board operations. When plugging multiple blind, blind to blind location map and plates number by construction General Manager, unity of command assignments. 12. signs in each blocking blind Board
31、 shows that blind location. (C) the blocking blind Board permits the management of 1. . Blind location map, implement security measures, after the approval of the technical department, assignment units (staff) to confirm. Job complex, dangerous places required security audits of the Department of en
32、vironmental protection, the company in charge of safety Vice President for approval. 4. approve a good blocking blind Board operating license in triplicate, main contractors, operating units, each hold a copy of the bio section. 5. after the end of the job, jobs, technical check, activity handed the
33、 blind location technology. 6. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. The lifting operation management system, purpose in order to control the production within the region, lifting, lifting activities to prevent the occurrence of acciden
34、ts, the system is formulated. Second, the scope of application of this system applies to all companies within the lifting operation. Third, lifting a license of graded credit three levels of management: (I) General equipment, weighing less than 1 ton of weight lifting, the lifting of the rules, tech
35、nology review, workshop Director for approval; (B) the rules of weight equal to or greater than 1 ton less than 10 tons of weight lifting, hoisting, approved by the workshop, equipment Management Department for approval. (C) of over 10 tons and heavy lifting operations projects or construction under
36、 the special conditions, shall prepare lifting plan, permit to work submitted to company executives and safety equipment, the joint security sector review competent after Assistant General Manager approval. Four, lifting safety requirements 1. lifting weights greater than or equal to 10 tonnes of th
37、e object and the subject of civil engineering structures, hoisting construction plan shall be prepared. Load is less than 10 tonnes, but small complex shapes, stiffness, length-diameter ratio, precision precious, under the special conditions of construction, should also prepare construction programm
38、es. Hoisting construction programmes examined by the project authorities, submitted to the competent VP approval to be implemented. 2. lifting operations must set up the alert line and set up special care, guardianship personnel must wear armbands, lifting regional staff out of bounds; 3. lifting op
39、erations must be provided for lifting loads, slings, rigging and economic calculation options, do not overload. When lifting heavy objects close to or reach the rated lifting capacity, check brakes, low height, short stroke after the load test, then smoothly lifted. Large and medium sized equipment
40、before lifting, load test should be carried out. Try hanging height for about 0.2m and then conduct a reliability check (including the selection and calculation of safety factor). Overload lifting is strictly prohibited. 4. before lifting must pad the wood and the wood used must be of adequate size
41、(be sure to over 1 m); when lifting requires fire escape, you must contact the circuit breaker in accordance with the provisions; 5. lifting operations must be run on all kinds of hoisting machinery parts, safety devices as well as slings, rigging a detailed security checks, security devices for lif
42、ting equipment is sensitive and reliable, no illness. Must try before lifting crane, confirmed before they can work. 6. lifting operations, removed platform guardrail must be restored (the bolt activity fence removal is strictly prohibited); 7. lifting operations, should have adequate lighting at ni
43、ght, outdoor . 16, lifting the approval procedure is not complete, security measures are not2 目目 录录 一、编制依据一、编制依据 二、编制原则二、编制原则 三、工程概况三、工程概况 四、施工组织四、施工组织 五、工程总体施工安排五、工程总体施工安排 六、主要施工方案与技术措施六、主要施工方案与技术措施 七、工期安排七、工期安排 八、质量保证体系八、质量保证体系 九、确保安全生产体系与措施九、确保安全生产体系与措施 十、确保文明施工管理体系措施十、确保文明施工管理体系措施 十一、环境保护措施十一、环境
44、保护措施 blind Board operational security requirements 1. blocking blind Board operations required to handle blocking blind Board operating license, no blocking blind Board operating license are not allowed to smoke blocking blind Board operations. 2. it is strictly prohibited to alter, lent the blockin
45、g blind Board operating license. Content conversion and expansion of operations or transfer jobs site, again for blocking blind Board operating license. 3. incomplete job approval procedures, safety measures are not implemented, work environment does not meet security requirements, workers have the
46、right to refuse to work. 4. toxic gas piping, equipment blocking blind Board, non-irritant gas pressure should be less than 200 mm Hg; irritant gas pressure should be less than 50 mm Hg; gas temperature should be less than 60 degrees. 5. Technical Department responsible for drawing blind location ma
47、p, numbers the blind, construction personnel work, blind location map by technology archive for future reference. 6. the blind plug operating personnel must wear appropriate personal protective equipment, must designate a person responsible for blocking blind Board work, and to designate a person re
48、sponsible for monitoring. Guardians are advised by experienced officers. , Guardian jobs people must wear appropriate protective equipment as required, and guardians must check, implementing relevant safety measures on the job. Guardians must adhere to the scene, and emergency treatment. Job guardia
49、n shall not leave the job site before the end. 7. the job complicated, dangerous places, apart from the guardian, also company leadership, safety and Environment Department, is responsible for personnel. Involving the entire production system, head of the technical department must be present. 8. in places where inflammable and explosive work, place within 30 metres without hot work operations; task lighting should use explosion-proof lamps and explosion-proof tools should be used, prohibition of beating with an iron pipe, flange, etc. 9. high blocking blind Board operation
链接地址:https://www.31doc.com/p-2240425.html