wa【挑战杯作品】1C0705B 三亚国际商业城场地岩土工程勘察及初步设计.doc
《wa【挑战杯作品】1C0705B 三亚国际商业城场地岩土工程勘察及初步设计.doc》由会员分享,可在线阅读,更多相关《wa【挑战杯作品】1C0705B 三亚国际商业城场地岩土工程勘察及初步设计.doc(31页珍藏版)》请在三一文库上搜索。
1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .序号: 编码: 1C0705B 第七届“挑战杯”河南省大学生课外学术科技作品竞赛作 品 申
14、报 书 作品名称: 三亚国际商业城场地岩土工程勘察及初步设计报告 学校全称: 河南理工大学 个人申报者姓名(集 体 名 称): 尹松良 王亮亮 熊杨威 类别:自然科学类学术论文哲学社会科学类社会调查报告和学术论文科技制作小发明创造 A2申报者情况(集体项目)说明:1必须由申报者本人按要求填写;2申报者代表必须是作者中学历最高者,其余作者按学历高低排列;3本表中的学籍管理部门签章视为申报者情况的确认。姓 名尹松良性别男出生年月1986.06申报者情况学 校河南理工大学专业地质工程专业现学历本科年级05学制4年制年入学时间2005年作品全称三亚国际商业城场地岩土工程勘察及基础初步设计报告毕业论文题
15、 目郑煤集团白坪矿煤层底板富水区带研究通讯地址河南理工大学资源环境学院邮政编码454000办公电话常 住 地通讯地址焦作市河南理工大学松四邮政编码454000住宅电话13523379016姓 名性别年龄学历所在单位王亮亮男21在读本科河南理工大学熊杨威男23在读本科河南理工大学资格认定学校学籍管理部门意 见以上作者是否为2009年7月1日前正式注册在校的全日制非成人教育、非在职的的各类高等院校中国籍专科生、本科生、硕士研究生或博士研究生。是 否(部门签章) 2009年 4月 7日院系负责人或导师意 见本作品是否为课外学术科技或社会实践活动成果。是 否 负责人签名:刘保民 2009年 4月 7日
16、B1申报作品情况(自然科学类学术论文)说明:1必须由申报者本人填写;2本部分中的科研管理部门签章视为对申报者所填内容的确认;3作品分类请按作品的学术方向或所涉及的主要学科领域填写;4硕士研究生、博士研究生作品不在此列。作品全称三亚国际商业城场地岩土工程勘察及基础初步设计报告作品分类( C )A机械与控制(包括机械、仪器仪表、自动化控制、工程、交通、建筑等)B信息技术 (包括计算机、电信、通讯、电子等)C数 理 (包括数学、物理、地球与空间科学等)D生命科学 (包括生物、农学、药学、医学、健康、卫生、食品等)E能源化工 (包括能源、材料、石油、化学、化工、生态、环保等)作品撰写的目的和基本思路目
17、的:该作品通过对场地与地基的工程地质条件评价,对拟建场地的建、构筑物施工图设计提供详细的岩土工程资料和设计所需的岩土技术参数,提出合理的地基基础设计和不良地质作用防止的措施和建议,为建筑物设计施工和使用提供了必须的岩土工程依据。基本思路:当今国际在研究地质环境对人类工程活动制约的基础上,重点研究人类工程活动对地质环境的影响效应,如何评价、预测和控制,以规范人类工程活动行为,提高地质环境质量,减轻灾害对人类的威胁,从而保持社会经济的可持续发展。另一方面保证工程建设的技术可行、经济合理,另一方面充分利用、合理开发及妥善保护人类赖以生存的地质环境。作品的科学性、先进性及独特之处1、对拟建场地进行岩土
18、分析研究在于以下几个方面:(1)结合场地岩土工程条件,对基础型式、持力层选择给出经济合理的建议;(2)为基坑开挖、施工降水提出建议;(3)首先工程地质条件与建筑物的关系十分密切,地表的工程地质条件的优劣直接影响建筑物的地基与基础设计方案的类型、施工工期的长短和工程投资的大小;(4)通过对建筑场地的勘察、分析研究,得出建筑场地的工程地质条件,论证工程地质问题,为地基基础设计、地基处理提供经济合理的方案和所需资料。2、研究方法(1)在建筑场地进行野外工程勘察实习,主要针对地基岩土特点采用标准贯入试验和采取原状土样进行室内实验,从而获得论文的原始资料; (2)运用工程地质勘察知识和一些数学统计方法,
19、对土的各项指标进行统计、计算,并对勘察数据进行综合对比分析。作品的实际应用价值和现实意义作品对拟建场地的建设、构筑物施工图设计提供详细的岩土工程资料和设计所需的岩土技术参数,提出合理的地基基础设计和不良地质作用防止的措施和建议,为建筑物设计施工和使用提供必须的岩土工程依据学术论文文摘针对查明拟建场地岩土工程条件的背景和原因,进行场地与地基的岩土工程勘察,充分了解建筑场地与地基的工程地质条件,结合了土工试样室内试验、原位测试试验及地下水水质分析。论证和评价场地、地基的稳定性和适宜性、不良地质现象、砂土液化判断、软弱地基处理与加固等岩土工程的技术决策和实施方案,并讨论各层的承载力和压缩性。勘察证明
20、本场地浅层的土层的承载力不能满足上部荷载对软弱下卧层变形的要求,不具备采用天然地基浅基础条件,应该采用桩基础加强浅部地基土强度,降低地基土变形以满足建筑设计对地基强度和变形的要求。 作品在何时、何地、何种机构举行的会议上或报刊上发表及所获奖励鉴定结果 请提供对于理解、审查、评价所申报作品具有参考价值的现有技术及技术文献的检索目录本次勘察按下列文件、规范及标准的有关规定进行。(1) 勘察合同及详细勘察任务书;(2)岩土工程勘察规范(GB50021-2001);(3)建筑地基基础设计规范(GB50007-2002);(4)建筑桩基技术规范(JGJ94-94);(5)建筑抗震设计规范(GB50011
21、-2001);(6)土工试验方法标准(GB/T50123-1999);申报材料清单(申报论文一篇,相关资料名称及数量)申报论文一篇科研管理部门签章 年 月 日C.当前国内外同类课题研究水平概述 说明:1.申报者可根据作品类别和情况填写; 2.填写此栏有助于评审。国内外同类课题研究水平概况:近年来,世界各国超高土石坝、超高层建筑与核电站等巨型工程的兴建,各国多次强烈地震的发生,促进了土力学的进一步发展。有关单位积极研究土的本构关系、土的弹塑性与粘弹性理论和土的动力特征。同时,各国研制成功多种多样的工程勘察、试验与地基处理的新设备,如自动记录静力触探仪、现场孔隙水压力仪、径向膨胀仪、测斜仪、自进式
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 挑战杯作品 wa【挑战杯作品】1C0705B 三亚国际商业城场地岩土工程勘察及初步设计 wa 挑战 作品 C0705B 三亚 国际 商业 场地 岩土 工程 勘察 初步设计
链接地址:https://www.31doc.com/p-2241696.html