2010土木工程师(岩土)基础考试《第十一章 工程测量》模拟试题-中大网校.doc
《2010土木工程师(岩土)基础考试《第十一章 工程测量》模拟试题-中大网校.doc》由会员分享,可在线阅读,更多相关《2010土木工程师(岩土)基础考试《第十一章 工程测量》模拟试题-中大网校.doc(17页珍藏版)》请在三一文库上搜索。
1、project design. Construction preparation phase and construction tender approval for project administration procedures project site level. Project implementation schedule in Figure 2, the implementation of control measures (a .7、Tender procedures (a) invites tenders for the project in accordance with
2、 the relevant provisions of the State to comply with the project approval procedure, after obtaining the approval of public tenders. Publish tender notices tender specified media. Notice shall set forth the name and address of the tenderer, the nature, quantity, implementation of the project locatio
3、n and the times and ways to obtain tender documents and other items. This item should include the tender project of technical requirements, bidder eligibility criteria, bid requirements and evaluation standards of all substantive requirements and intends to sign the contracts terms and conditions. (
4、B) investigation and design bidding is the entire basis of the project of investigation and design work. Public tender of project design, public choice of investigation and design units, the project design is building professional grade b or above qualification of bidders. (C) quality of tendering a
5、nd construction supervision for engineering construction supervision plays a key role. At the time of construction supervision of tendering and public supervision of project construction management enterprises. This project require bidders to have construction engineering grade b or above qualificat
6、ion. (D) the construction Enterprise bidding engineering needs require bidders to have construction grade or above qualification. (E) main material procurement according to the projects needs, public choice major material suppliers, equipment, technology and material quality of the bidders shall con
7、form to the design requirements of this project, high quality and low price and reliable after-sales service. Potential bidders to the project site. The tender documents issued from the date of the item to the bidder submitting the tender closing date, the shortest shall not be less than 20th. 8 bid
8、ding this item the bidder should have the capacity to undertake the project, preparation of tender documents and shall be in accordance with the requirements of the tender documents. The bid documents shall respond to substantive requirements and conditions for tender documents. Bidders shall tender
9、 prior to the deadline for submission of bid documents, the tender documents the place. Less than three bidders, the Tenderer shall, in accordance with the way new. Bidders bid after the bid project part of the non-principal, critical work to subcontractors shall be set out in the tender documents.
10、Bidders shall not collude with the tender offer, and may not crowd out other bidders, fair competition, and must not harm the tenderer or bidders legitimate rights and interests. Bidders not中大网校引领成功职业人生 2010土木工程师(岩土)基础考试第十一章 工程测量模拟试题总分:52分 及格:0分 考试时间:120分单选题(下列各项中,只有一项符合题意)(1)DS3光学水准仪的基本操作程序是()。 (2)
11、从一已知高程的水准点出发做水准测量,最后又回到原水准点,这称为()。(3)一幅地形图上,等高线越稀疏,表示地貌()。(4)(5)(6)1/2000地形图与l/5000地形图相比,()。(7)已知M点实地高程为39.651m,N点设计高程为40.921m。在M、N中间安置水准仪,读得M尺上读数为1.561m,N尺上读数为0.394m,则N点处填挖高度为()。 (8)常用的距离测量方法有()。(9)(10)高斯平面直角坐标系与数学平面直角坐标系的主要区别是()。(11)(12)偶然误差的特性是()。(1)累积性; (2)有界性; (3)小误差密集性; (4)符号一致性; (5)对称性; (6)抵偿
12、性。(13)水准仪应满足的几何条件不包括()。(14)已知经纬仪-N回的方向中误差为6”,用此经纬仪观测一三角形的所有内角,各角均采用一测回观测,则三角形的角度容许闭合差为()。(15)(16)自由静止的海水面向大陆、岛屿内延伸而成的()称为水准面,其面上任一点的铅垂线都与该面相垂直。(17)从高级控制点A开始,经过所选控制点又回到起始点A的导线,称为()。(18)关于大地水准面,下列叙述不正确的是()。(19)(20)要求地形图上表示的地物最小长度为0.1m,则应选择测图比例尺为()。(21)(22)(23)闭合水准测量路线的高差闭合差计算公式为()。 (24)山谷和山脊等高线分别为一组()
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 第十一章 工程测量 2010土木工程师岩土基础考试第十一章 工程测量模拟试题-中大网校 2010 土木工程师 岩土 基础 考试 第十一 工程 测量 模拟 试题 网校
链接地址:https://www.31doc.com/p-2245739.html