xg宝山钢铁股份有限公司二号高炉原地大修工程(铁1标)《施工组织设计》终.doc
《xg宝山钢铁股份有限公司二号高炉原地大修工程(铁1标)《施工组织设计》终.doc》由会员分享,可在线阅读,更多相关《xg宝山钢铁股份有限公司二号高炉原地大修工程(铁1标)《施工组织设计》终.doc(234页珍藏版)》请在三一文库上搜索。
1、ocusing on ways and means of improving and upgrading work, further development of “three to split“. (A) fully grasp “no unauthorised“ created. The township “no unauthorised“ created the existing building “one household, one document“ survey and file storage work must be unconditional and full covera
2、ge. Main corridor leading to the town (road, river) village, the Central built-up area of the town on both sides must be to create a “no unauthorised village“. According to “five hundred villages“ created and shanty towns, villages, old houses, reconstruction of old plant, expand create, upgrading c
3、reates files, the real “no unauthorised village“ created into the benefit of the people of very good thing. (B) to strictly manage count as unauthorised controls. Promoting the “new“ control work to move the center of gravity, management measures to the front, and earnestly pipes effectively. A stri
4、ct new unauthorised network responsibility. Sectors such as land, housing and basic stations (stations) and the Township of grid accountability mechanisms must be strictly in accordance with the new regulatory requirements, effective implementation of the area of responsibility of the new inspection
5、s, suppression, demolition work to ensure that the new “zero tolerance“. Second, public security, water, electricity, water, oceans and fisheries, tourism collaboration, market supervision departments should strictly enforce the illegal construction of disposal of relevant provisions of the regulati
6、ons, effective fulfilment of responsibilities, particularly in electricity and water supply, and other units may not be new illegal buildings to supply water and electricity supply. While more regulation to prevent personal privacy violations. Illicit trading in illegal construction in the Ministry
7、of public security sector to strictly from the blow. Three is to create additional offence reporting system of incentives. According to building law and covers an area of nature, to report timely degree divided report grade, effective after the removal of certain incentives. (C) integrated implement
8、ation “, building demolition, modification, use“ combination. Demolition is the means and purpose built is. To adhere to the building demolished, combination of construction and demolition waste, demolished with combined efforts to improve the scientific level of three to split; second, we must pay
9、attention to “three to split“ and “five hundred“ and “five water treatment“, “three of the four sides“, the shackDistrict transformation, and dangerous old room transformation and “two road sides“, series work organic combined up, active do River, and along demolition work, and manpower advance vill
10、age in the, and old residential demolition work, to improved masses housing conditions and live environment; three to put “three modified a split“ as traditional low, and small, and bulk industry structure transformation upgrade of important initiatives to caught, speed up advance industry Park, eff
11、ective optimization park environment and improve idle land of utilization, real achieved environment improved and productivity development mutual promoting total win. Five, firmly implement, promoting work ahead, to create highlights. Third deployment, implementation of seven, then it is imperative
12、to strengthen responsibility and improve the mechanisms and implementation. All localities and departments must be convinced that goals, going all out, mustering spirit, work together to ensure that this years objectives carry out tasks, at the forefront. First, we must strengthen the leadership to
13、implement. Departments at all levels should always work and rural “five water treatment“, “three to split“ in an important position, and carry the main responsibility, main leader personally, leaders arrested and layers of responsibility rank transmission pressure established hierarchical accountabi
14、lity, and work together to promote the work of the mechanism, a concerted effort pay attention to implementation. County nongban, flood, three to one down to further play a leading catch total, integrated and coordinated role of all kinds is “long“, “Sheriff“ “Inspector“ to effectively fulfill their
15、 responsibilities, formed the alignment on the fire line and management a lively situation. Second, we must strengthen the test implementation of the Governor. Role play the Governor got the baton, for agricultural and rural focus and “five water treatment“, “three to split“ work, refine improve ass
16、essment methods and evaluation system, accurate assessment. Combined with “dare play, tree benchmark“ style building five major operations, carry on and gain firsthand experience of supervision, in particular, to strengthen the focus on the “long“ signs “go left“, “names“ such as supervision, urged
17、all levels longer on duty in place. Through the supervisory assessment, to promote habits, stimulating power. Third, we must strengthen implementation style. Departments at all levels to work in rural areas and “five water treatment“, “three to split“ as training cadres for major platforms, compete
18、against large examination room, inspection cadres work performance of the ring, water control and the Japanese pulled a workout, training, discovery and selection of cadres. Than good catch up, first to excellence-oriented. Party members and cadres at all levels must adhere to the rural, water contr
19、ol and the Japanese pulled a grass-roots, “put down the shelf, leaned“ pragmatic style, the spirit of play, become a benchmark model. Four, we must strengthen propaganda implementation. Comprehensive utilization of micro-credit, micro-blogging, new media, mining, summarizing, good publicity work in
20、the countryside and “five water treatment“, “three to split“ advanced models, point to gather positive energy for the community to see the results of our work in time, increase public awareness, participation rates, satisfaction and support. Play gongqingfu, a mass organization and grass-roots such
21、as schools, communityThe role of 目目 录录 第一章第一章编制说明编制说明.1 1编制依据.1 2编制原则.1 第二章第二章工程概况工程概况.2 1工程简介.2 2工程特点.6 3主要工程实物量.7 第三章第三章施工总体部署施工总体部署.9 1指导思想.9 2施工部署.11 3施工资源计划.17 4施工机械计划.21 第四章第四章进度计划及保证措施进度计划及保证措施.28 1施工进度计划.28 2工期保证措施.32 第五章第五章施工总平面规划施工总平面规划.35 1施工总平面管理原侧.35 2施工总平面布置原则.35 ocusing on ways and me
22、ans of improving and upgrading work, further development of “three to split“. (A) fully grasp “no unauthorised“ created. The township “no unauthorised“ created the existing building “one household, one document“ survey and file storage work must be unconditional and full coverage. Main corridor lead
23、ing to the town (road, river) village, the Central built-up area of the town on both sides must be to create a “no unauthorised village“. According to “five hundred villages“ created and shanty towns, villages, old houses, reconstruction of old plant, expand create, upgrading creates files, the real
24、 “no unauthorised village“ created into the benefit of the people of very good thing. (B) to strictly manage count as unauthorised controls. Promoting the “new“ control work to move the center of gravity, management measures to the front, and earnestly pipes effectively. A strict new unauthorised ne
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 施工组织设计 xg 宝山 钢铁 股份有限公司 二号 高炉 原地 大修 工程
链接地址:https://www.31doc.com/p-2253877.html