城市污水处理厂工程质量验收 用表(GB50334-2002)(75pages)---very good good.doc
《城市污水处理厂工程质量验收 用表(GB50334-2002)(75pages)---very good good.doc》由会员分享,可在线阅读,更多相关《城市污水处理厂工程质量验收 用表(GB50334-2002)(75pages)---very good good.doc(77页珍藏版)》请在三一文库上搜索。
1、Manipulator is now used as a industrial robots in use, the control objectives often appear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid development in industrial automation as a separate subject. Manipulator applic
2、ation began to filter into welding, logistics, mechanical processing, and other industries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use also brings great convenience to the staff. Precisely because of this
3、 robot to get peoples attention began to be a high degree of development. Labor rates, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller) is in various special circumstances and under special conditions set
4、 for mechanical devices. Now turned on the development of the microelectronics automatic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful development, now continues to develop as a factory automation standa
5、rds. Because robots are good development of the technology makes a good optimization of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and programming that can be mastered in a short time, so in the context of ind
6、ustrial PLC applications became ubiquitous. Manipulator in many developed country agriculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed line that uses a robotic arm, and so on. Today, the high level of autom
7、ation combined with restrictions on the manipulator development level is slightly lower than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn of has a must of consolidation, understand has some usually didnt opp
8、ortunities awareness in world range within some leading level of knowledge has has must awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in both at home and abroad of research profile automation mechanical arm r
9、esearch began Yu 20th century medium-term, after years with with computer and automation technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluation standards, and its importance can be seen. Now original robotic ar
10、m spent most of mass production and use on the production line, which is programmed robotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect the external environment, but can still successfully complete like wel
11、ding, painting, delivery as well as for materials simple movements. Second generation mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand竣 工 验
12、 收 证 书工程名称开工日期年 月 日施工单位竣工日期年 月 日合同造价(万元)施工决算(万元)验收范围及数量:存在问题及处理意见:对工程的质量评价:竣工验收日期: 年 月 日参加竣工验收单位意见建设单位签名: (盖章) 设计单位 签名: (盖章)监理单位 签名: (盖章)施工单位 签名: (盖章)勘理单位 签名: (盖章)邀请单位签名: (盖章) 工程质量交工验收报告工程名称交工验收日期施工单位开、竣工日期工程简要内容存在问题整改完成期限验收结论参加验收人员签字(盖公章)施工单位养管单位建设单位监理单位设计、勘察单位 年 月 日 设备安装工程单机或联动试运转记录设备部位图号设备名称型号、规格
13、、台数施工 单位设备所在系统额定数据试验单位负责人试车日期年 月 日序号试验项目试验记录试验结论123建设单位监理单位管理单位设备生产厂家总包单位安装单位(签字)(盖章)(签字)(盖章)(签字)(盖章)(签字)(盖章)(签字)(盖章)施工负责人质检员施工员(签字)(盖章)(签字)(盖章)(签字)(盖章)注:该表一式三份,其中施工单位一份,管理单位一份,建设单位一份备案单位工程质量竣工验收记录单位工程名称结构类型施工单位技术部门负责人质量部门负责人项目经理项目技术负责人项目质量负责人开工日期竣工日期序号项目验收记录验收结论1分部工程共 个分部,经查 分部符合标准及设计要求 分部2质量控制资料核查
14、共 项,经审查符合要求 项经核定符合规范要求 项3安全和功能检验资料核查及主要功能抽查共核查 项,符合要求 项共抽查 项,符合要求 项经返工处理符合要求 项4施工观感质量检查评价共抽查 项,符合要求 项不符合要求 项5综合验收结论参加验收单位建设单位监理单位施工单位设计单位(公章)单位(项目)负责人: 年 月 日(公章)单位(项目)负责人: 年 月 日(公章)单位(项目)负责人: 年 月 日(公章)单位(项目)负责人: 年 月 日单位工程质量控制资料核查记录单位工程名称施工单位序号项目资 料 名 称份数核查意见核查人1构筑工程(各种池体和建筑物)图纸会审、设计变更、洽商记录2工程定位测量、放线
15、记录、测量复核记录3原材料出厂合格证明文件及复试报告4施工试验报告及见证取样检测5隐蔽工程验收记录6施工记录7混凝土抗压强度、抗渗性能试验记录8预制构件、商品混凝土合格证9地基与基础检测资料10分项、分部、单位工程质量检验记录11工程质量事故及工艺施工记录12新材料、新工艺施工记录13防水材料质量证明文件及复试报告14水工构筑物气密性试验、满水试验等15安装工程(设备安装、管道、电器等) 图纸会审、设计变更、洽商记录16设备、构配件出厂质量证明文件和复试报告17各种管道、设备强度试验、严密性试验记录18隐蔽工程验收记录19管道系统清洗、通水试验记录20施工记录21设备单机试车、运行、联动试车记
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 城市污水处理厂工程质量验收 用表GB50334-200275pages-very good 城市 污水处理 工程质量 验收 用表 GB50334 2002 75 pages very
链接地址:https://www.31doc.com/p-2256571.html