2、8标隧道初期支护、二衬工程安全专项施工方案2013.2.doc
《2、8标隧道初期支护、二衬工程安全专项施工方案2013.2.doc》由会员分享,可在线阅读,更多相关《2、8标隧道初期支护、二衬工程安全专项施工方案2013.2.doc(45页珍藏版)》请在三一文库上搜索。
1、thrift of excellent traditional and style lack deep of understanding, one-sided think in now of good situation Xia, economic smooth more fast development, and reform made major progress, and people living significantly improve, and social the career made new progress, no necessary always hard has, n
2、o awareness to China also has many poverty area, and also has many poverty population of exists, more living improve has, more need keep hard of style. Three is not strictly honest. Total thought units is a water sector, clean self-discipline away from himself too far, no real processing good living
3、 of improve and hard, and thrift excellent traditional of relationship, no effective do comply with Constitution and party of regulations must from I do up, no right mercy good bitter Le, and wealth of relationship, no right awareness to in comply with Constitution and party of regulations aspects e
4、veryone has accountability. Four, future direction and improvement measures 1, belief and faith, strengthen party spirit. One is to firmly establish the noble ideals of struggle for the ideals of communism, communist struggle for life, ready to sacrifice everything for the party and the people. Seco
5、nd is to continuously improve the quality and standard of political, conscientiously study Deng Xiaoping theory and three represents important thought and the scientific Outlook on development, implement the partys basic program for the primary stage of socialism, adhere to the correct political ori
6、entation, maintain highly consistent with the CPC Central Committee, is good at theories of socialism with Chinese characteristics to analyze and solve problems. Third, strengthening the party spirit and the world transformation, perseverance of the party Constitution, relive Party vows to establish
7、 correct world Outlook, Outlook on life and the world, practically embodies ideals and beliefs into action, combine lofty ideals and practical activities, transforming the objective world, actively participate in the great practice of building socialism with Chinese characteristics. 2, keep the purp
8、ose in concept, changing the style of work. First, keep in mind that the purpose of serving, adhere to assuming power for the people, keep in mind the people and care about people, and the joys and sorrows of the masses, .According to city discipline, and municipal organization Department requiremen
9、ts, today we held implement implementation independent Commission against corruption guidelines effective strengthening led cadres style construction topic democratic life, main task is close contact thought, and work actual, control check district Standing Committee team and the personal in impleme
10、ntation independent Commission against corruption guidelines Shang exists of problem, in-depth carried out criticism and self-critical, further clear rectification direction and measures, effective enhanced clean politics of consciousness and initiative, firm set good of ruling image. Before the mee
11、ting, the way we take surveys solicited a views, combed, related to team building 杭新景高速公路(衢州段)第8标段隧道初期支护、二衬工程安全专项施工方案1、编制说明1.1、编制依据(1)、中华人民共和国安全生产法(中华人民共和国主席令70号); (2)、爆破安全规程(GB6722-2011);(3)、公路工程施工安全技术规程(JTJ076-95);(4)、公路隧道施工技术规范(JTG F60-2009);(5)、公路隧道施工技术细则(JTG/T F60-2009);(6)、公路工程技术标准(JTG/T B01-2
12、003);(7)、公路工程质量检验评定标准(JTG F80/1-2004);(8)、公路项目安全性评价指南(JTG/T B05-2004);(9)、浙江杭新景高速公路浙江段招标文件、补遗书、两阶段施工图设计等相关资料;(10)、浙交【2010】236号浙江省公路水运危险性较大分部分项工程安全专项施工方案管理办法;(11)、中交二航局第二工程有限公司关于转发“中交二航局危险性较大的分部分项工程安全管理制度”的通知。1.2、编制目的为保证杭新景08标段隧道初期支护、二衬工程施工的安全,切实落实有关建设工程安全技术标准、规范,加强工程项目的安全生产监督管理,预防施工安全事故,保障人身和财产安全。根据
13、浙江省交通运输厅 浙交【2010】236号浙江省公路水运危险性较大分部分项工程安全专项施工方案管理办法(试行)的规定,结合本工程的实际情况,特编制隧道初期支护、二衬工程安全专项施工方案,并据此进行管理、指导施工。1.3、适用范围 本安全专项施工方案适用于杭新景高速公路建德寿昌至开化白沙关(浙赣界)段第8标段范围内的隧道初期支护、二衬工程,分别为上槽隧道(K175+290K175+978、ZK175+290-ZK175+956),倒石岗隧道(K178+826K179+110、ZK178+840-ZK179+110)。2、工程概况2.1、工程简介杭新景高速公路第8标段起讫桩号为K175+250-K
14、179+110,路线长度3.86km。本合同段内共有隧道1.5座:(1)上槽隧道:为小净距隧道,净空5.0m,净宽10.75m,其中右洞全长688米,左洞全长666米。V级围岩占隧道总长51%,IV级和级围岩占隧道总长44.6%。(2)倒石岗隧道:为分离式隧道,净空5.0m,净宽10.75m,由8标、9标共同施工,其中8标承建部分右洞全长284米,左洞全长270米。V级围岩占隧道总长6.5%,IV级和级围岩占隧道总长90.6%。(3)具体隧道分布及各级围岩分布情况详见下表:各级围岩分布情况表围岩级别上槽隧道左洞(m)上槽隧道右洞(m)合计(m)倒石岗隧道左洞(m)倒石岗隧道右洞(m)合计(m)
15、隧道总长6666881354270284554V级围岩350346696191736IV级围岩262281543243259502级围岩263561000半明半暗808000明洞2026468816隧道分布情况表序号隧道名称隧道类型起屹桩号隧道长度(m)建德端洞口开化端洞口1上槽隧道小净距(SC、SD)K175+290K175+978688削竹式:16(SMA)半明洞式:10(SMA)ZK175+290ZK175+956666削竹式:16(SMA)偏压式: 4(SMB)+8(SMC)2倒石岗隧道分离式K178+826K179+110284半明洞式: 8(SMA)ZK178+840ZK179+1
16、10270半明洞式: 8(SMA)(4)、隧道设计概况a、隧道设计车速隧道几何线形与净空按100kmh设计。隧道照明设计速度按80kmh设计。b、隧道建筑限界根据公路隧道设计规范(JTG D70-2004)规定确定;、建筑限界基本宽度行车道W23.75m;左右侧向宽度:LL0.5m;LR1.00m;检 修 道:JL0.75m;JR1.00m。、隧道建筑限界净高:H5.0m,检修道净高:h2.5m。、人行横通道净 宽:w2.0m;净 高: 2.5m。2.2、工程环境2.2.1、地形地貌本项目位于浙西中低山区,千里岗山脉、怀玉山脉控制了主要的地形格局。地貌以中低山和高丘为主,平原、低丘穿插其间。中
17、低山区峰峦层叠,山坡陡峭,河谷狭窄,地势起伏大,相对高差大。2.2.2、工程地质及特征上槽隧道所处山体海拔高程274490m,隧道轴线通过最高海拔约376m,最大相对高差约100m。山坡植被发育,以灌木林为主。地表主要为第四系残坡积含粘性土碎石、块石土,下伏基岩进洞口段主要为灰岩、石英砂岩;出洞口段和洞身段为强中风化砂岩。隧道及周边地带的不良地质问题主要是隧道进洞口处崩坡积体,对隧道影响较大。倒石岗隧道进洞口位于太真乡银坑村沿铜山源溪下游约450m的山谷右坡处,所处山体海拔350590m,隧道穿越残坡积、强微风化泥岩、粉砂岩、花岗斑岩。地表水和地下水对钢筋和混凝土无腐蚀性。2.2.3、气象特征
18、工程区属亚热带季风气候区,四季分明,雨量充沛,年平均气温17.40C,最高气温40.50C,最低气温-10.40C。多年平均降水量为1804.92mm,梅雨期及台风季节,常出现暴雨天气,可诱发滑坡、崩塌、泥石流等不良地质现象的发生。2.2.4、河流水文区内河流属于钱塘江水系,主要为铜山源,为雨源型山溪河流,洪枯水变化明显,暴涨暴落,地下水、地表水水质良好,对混凝土基本无腐蚀性。隧址区进出口附近有一河流, 为同一河流, 河流规模不大,河宽15-30m 左右,河流蜿蜒曲折,一般雨季、洪水期水量较大,对周边上土体和基岩冲刷剧烈,地表水对隧道影响不大。2.2.5、地震隧址区历史上地震活动很少,震级很弱
19、,属少震、弱震区。地震动参数峰值加速度分区为0.05区,相当于地震基本烈度小于VI度区。 2.3、施工平面布置根据施工总体布置安排,本标段总体施工平面布置图详见附图。2.4、施工准备情况2.4.1、完成图纸会审工作,隧道洞口地形测量已完成,并经监理工程师抽检,指挥部、设计院、驻地办已进行现场勘察,针对设计进洞桩号进一步明确,确保“零开挖”进洞。2.4.2、全线电力布置已确定,隧道洞口变压器已安装完成,具备开工的条件。2.4.3、现场施工人员、机械能满足工程进度的需求。2.4.4、砼所用黄砂、碎石、水泥已进场,相关材料的试验检测、砼配合比等已完成。2.4.5、施工便道、作业平台已完成,施工场地基
20、本建设完成。3、 施工方案3.1、隧道开挖支护3.1.1、分离式隧道1)、级围岩区段开挖支护级围岩区段采用先超前预支护后开挖,采用留核心环形开挖。施工步骤:超前支护上部环形开挖上部初期支护核心土开挖 下部开挖下部初期支护铺设防水层模筑二次衬砌。施工中遵循“管超前、严注浆、短开挖、强支护、勤量测、早封闭”的基本原则。初期支护形式为:“1086mm管棚(或42mm小导管)+注浆”预支护、255mm先锚后灌式中空注浆锚杆(长3.5m)、25cm厚C25喷砼+A6定型钢筋焊接网、18号工字钢拱架(纵向间距0.50.75m)或14号工字钢拱架(纵向间距0.75m)。级围岩段施工工序横断面示意图2)、级围
21、岩区段开挖支护级围岩区段采用正台阶法开挖。台阶长度15-20m,上台阶开挖长度1.0-1.5m。施工中合理调整工序,实行钻爆、装碴、运输机械化一条龙作业,上下断面开挖后,拱部和边墙立即喷射砼,及时施工初期支护,仰拱、二次衬砌紧跟,开挖前根据设计辅助施工措施,做好超前锚杆支护等措施。下半断面的开挖在上半断面的施工支护基本稳定后进行,并认真加固拱脚支护,使上部施工支护与围岩形成完整的体系;量测工作必须及时,当发现异常情况,立即进行仰拱封闭。施工步骤:拱部超前锚杆上半断面开挖上半断面初期支护下半断面开挖下半断面初期支护铺设防水层模筑二次衬砌。初期支护形式为:拱部超前锚杆(必要时,3.5-4.0m)、
22、255mm先锚后灌式中空注浆锚杆(长3.0m)、20cm(或15cm)厚C25喷砼+A6定型钢筋焊接网、钢筋格栅拱架(必要时,纵向间距1.0m)。级围岩段施工工序横断面示意图3)、级围岩区段开挖支护级围岩区段采用全断面法开挖,初喷混凝土,施作锚杆,复喷支护。施工步骤:全断面开挖全断面初期支护铺设防水层模筑二次衬砌。初期支护形式为:22mm砂浆锚杆(长2.5m)、10cm厚C20喷砼+A6定型钢筋焊接网。级围岩段施工工序横断面示意图3.1.2、小净距隧道小净距隧道的施工本项目的重点和难点,小净距隧道钻爆施工质量直接关系到隧道施工的成败,实际施工过程中应严格监测和控制钻爆,为避免爆破震动波的叠加,
23、必须采用微差控制爆破,各段起爆时间应根据震动测试确定,或以大于200ms为宜。对于SD型小净距隧道,单洞均可按正常分离式相应围岩开挖法施工,但先掘进洞应超前后掘进洞开挖工作面不小于30m。对于SC型小净距隧道,施工方案如下:1)、级围岩区段开挖支护先掘进洞采用双侧壁导坑、拱部留核心土弧形开挖,各部分施工开挖前应做好超前支护措施。隧道施工先掘进洞模筑衬砌应超前后掘进洞开挖工作面不小于50m。(1)、施工工序、隧道各部施工开挖前应先做好超前支护措施。、侧壁导坑采用超短台阶法施工,各步开挖每一循环进尺后,应及时施作相应的支护措施。、隧道拱部采用留核心土弧形开挖法施工。、隧道施工先掘进洞主洞应超前后掘
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 隧道 初期 支护 工程 安全 专项 施工 方案 2013.2
链接地址:https://www.31doc.com/p-2356318.html