bx三聚氰胺二期工程建设项目管理手册.doc
《bx三聚氰胺二期工程建设项目管理手册.doc》由会员分享,可在线阅读,更多相关《bx三聚氰胺二期工程建设项目管理手册.doc(155页珍藏版)》请在三一文库上搜索。
1、serious re-check whether the sealing Plug and Cup damaged, replacement leather Cup then try again without success is again blocked, and blocked before operation, you must ensure that the pressure balance. Nitrogen replacement tested replacement of oxygen concentration in the air is less than 2% (SY/
2、T5858-2004 of the petroleum industry for hot work safety rules specified in 7.2.2) qualified for replacement. Hole, plugging devices nitrogen replacement openings is completed, remove the perforated front, the first to enter the machine replacement NET nitrogen remaining in the machine of combustibl
3、e gas, through the drainage tube drainage of flammable gas replacement of the vent, preventing accumulation of combustible gases in machine exploded. Replacement is complete, which is flow content to meet the requirements of combustible gas, removable perforated. Before each time you remove the plug
4、, to the sealed knot . 1) ha destablir una llista de tots els arxius i informaci rebre; 2) tots els materials per a control de qualitat, certificat material i registre de bona qualitat; 3) procs de treball utilitzant el sistema de “tres xecs“, lestabliment dinspecci, mesura i assaig inventari dequip
5、s, lestat de calibraci de lequip t una clara o identificar el registre i utilitzat en el termini de validesa de les normes i supervisi tcnica departaments; 4) va trobar que no qualificats ha de ser clarament Etiquetat, enregistrat per Convenci, allament, ompli “fracassat rcord“, supervisat per linsp
6、ector de qualitat per a refer nonconforming, concessi, degradaci i descarta. 5) anlisi de la ra no qualificat i responsabilitat, les accions correctores especfiques i mesures preventives, per evitar problemes recurrents. Nou, seguretat de construcci de lestabliment 1, el cap del principal grup de qu
7、alitat i seguretat: membres: 2, connexi a punt calent seguretat, afavoreix foc camions dins i fora; Personal doperacions especials com ara els operadors de grues mantindr un certificat vlid dinducci; Anlisi seguretat abans de loperaci; Treballar lavaluaci de seguretat abans de connectar el dispositi
8、u fora; Calenta abans de la llicncia de funcionament; Abans dinici de la classe es dur a terme cada dia; Organitzacions relacionades amb personal construcci seriosament estudiar la proposta abans del foc i foc mesures de seguretat i conducta educaci viria; En estricta conformitat amb linforme calent
9、a i prctica per a la construcci assegurar-se segur i lliures daccidents; Foc lloc de construcci, equips de prova dexplosi sn necessries per implementar i funcionaris per dur a terme, installacions contra incendis ha de ser alg a buscar desprs que tutors de seguretat han darribar a lescena i ha estat
10、 en custdia en lescena; Abans del treball calenta per netejar inflamable, lobra dins els 20 metres no es poden emmagatzemar materials inflamables; Calenta aplicaci de detector de gasos combustibles per detecci interior calenta i fora el contingut de gasos combustibles, en lnia amb els requisits i la
11、provaci de la feina de personal de direcci de seguretat de lloc. Calenta treball cal realitzar en les rees designades, no es pot ampliar labast del foc; Personal doperacions de treball calenta implementi estrictament les normes de seguretat. Totes les parts cal definir especial cura amb foc; Desprs
12、al final de la construcci, amb el mxim responsable de la construcci i seguretat supervisi organitzaci lloc neteja treball, confirma la construcci lloc foc tot apagat; I matries estaven situades en lanemmetre durant un treball de construcci, relacionats amb la seguretat HSE senyals com marques dadver
13、tncia. Installacions contra incendis estan equipades amb (1) bombers (propietaris) 1 (2), sec qumics, escuma extintors (4kg) 8 (3) amiant feltre 30 pala (4) 4 (5) 2 riscos identificaci gasos combustibles detector Control que els propietaris cal desviar la canonada informaci relacionada i relacionats
14、 amb factors de desprs que faci una comprensi, projecte subdirector gerent de projecte, conseller de seguretat, apoderat de tecnologia, loficial de seguretat, longitud unitat en el treball de forat tot el procs didentificaci de perills, avaluaci del risc per identificar. Number 1 hazard identificati
15、on and control processes and activities risk hazards and controls 1 traffic accident fatigue driving, drunk driving illegal operation adverse weather condition 1. injuries 2. property lost 1, to position the driver training 2, on-time maintenance and repair vehicles. 3 collect weather information, e
16、nhance occupant safety, car safety harness must be 4, site and road blockade in person on-site monitoring collapse 2 1, operating without the required slope or the support measures taken; 2, there is no escape. 3, delayed drainage 1. injuries 2. equipment damage 1, operating pit excavation based on
17、soil conditions in the required slope, cannot ensure the slope ratio of to take the appropriate protection measures; 2, operations personnel must be provided with escape routes escape routes (two). 3, operation hang within the tidal pool drainage 3 radiation 1. without PPE. 2. open the arc 1. person
18、al injury 1, 重庆建峰工业集团重庆建峰工业集团 三聚氰胺二期项目建设三聚氰胺二期项目建设 项目管理手册项目管理手册 重庆重庆 涪陵涪陵 二二 O 一一 0 年七月年七月 serious re-check whether the sealing Plug and Cup damaged, replacement leather Cup then try again without success is again blocked, and blocked before operation, you must ensure that the pressure balance. Nitr
19、ogen replacement tested replacement of oxygen concentration in the air is less than 2% (SY/T5858-2004 of the petroleum industry for hot work safety rules specified in 7.2.2) qualified for replacement. Hole, plugging devices nitrogen replacement openings is completed, remove the perforated front, the
20、 first to enter the machine replacement NET nitrogen remaining in the machine of combustible gas, through the drainage tube drainage of flammable gas replacement of the vent, preventing accumulation of combustible gases in machine exploded. Replacement is complete, which is flow content to meet the
21、requirements of combustible gas, removable perforated. Before each time you remove the plug, to the sealed knot . 1) ha destablir una llista de tots els arxius i informaci rebre; 2) tots els materials per a control de qualitat, certificat material i registre de bona qualitat; 3) procs de treball uti
22、litzant el sistema de “tres xecs“, lestabliment dinspecci, mesura i assaig inventari dequips, lestat de calibraci de lequip t una clara o identificar el registre i utilitzat en el termini de validesa de les normes i supervisi tcnica departaments; 4) va trobar que no qualificats ha de ser clarament E
23、tiquetat, enregistrat per Convenci, allament, ompli “fracassat rcord“, supervisat per linspector de qualitat per a refer nonconforming, concessi, degradaci i descarta. 5) anlisi de la ra no qualificat i responsabilitat, les accions correctores especfiques i mesures preventives, per evitar problemes
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- bx 三聚 二期工程 建设项目 管理 手册
链接地址:https://www.31doc.com/p-2366683.html