dd年产3万吨醋纤维丝束项目监理细则.doc
《dd年产3万吨醋纤维丝束项目监理细则.doc》由会员分享,可在线阅读,更多相关《dd年产3万吨醋纤维丝束项目监理细则.doc(126页珍藏版)》请在三一文库上搜索。
1、evaluation of scientific development. Nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and sy
2、stem, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. Quality and efficiency-quality benefit is to adhere to the
3、enterprise survival, profit and development business truth, adhere to the all activity is economic activity, all costs can be controlled, money should not be wasted management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness. In
4、novation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthening scientific and
5、 technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. Resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at the core, enhance
6、 the operation of lean management to realize low consumption, high efficiency, reduce production costs. Second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. Harmonious development of harmoni
7、ous development-is to construct a foreign environment for development. XING refers to the internal security firm and internal management of the internal management measures are effective, harmonious. Foreign currency means Enterprise coordinating development of homeopathy, well, get along with the n
8、eighbors better. (B) XX 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. Class of disorders 0, 0 is equivalent forced outage rate. No personal injury accident, material and equipment accidents do not occur, no fire, no environmental pollution acciden
9、t. Enterprise integrated to achieve zero cases of violation, zero accidents, zero. Quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kWh, total profits of 306.6 million Yuan, . BFS+、PI、MIS、SCM Information systems infrastructure, fully integrated information s
10、ystem to realize information resources sharing; to expand the breadth and depth of the portal system, information system of Enterprise Management Assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting causes and transfer system; to strengthen the tr
11、aining 双维伊士曼年产3万吨醋纤维丝束项目监理细则一、编制依据1、已批准的监理规划;2、与专业工程相关的标准、设计文件和技术资料;主要标准: 建筑地基基础工程施工质量验收规范 (GB50202-2002) 混凝土结构工程施工质量验收规范 (GB50204-2002) 钢筋焊接及验收规范 (JGJ18-2003) 砌体工程施工质量验收规范 (GB50203-2011) 屋面工程质量验收规范 (GB50207-2002) 地下防水工程质量验收规范 (GB50208-2002) 建筑装饰装修工程质量验收规范 (GB50210-2001) 建筑工程项目管理规范 (GB50326-2001) 建设
12、工程文件归挡整理规范 (GB/T50328-2002) 钢结构工程施工及验收规范(GB50205-2001) 钢结构高强螺栓连接的设计、施工及验收规程(JGJ82-91) 建筑钢结构焊接技术规程(JGJ81-2002) 混凝土小型空心砌块建筑技术规程 (JGJ/T14-2004) 建筑地基处理技术规范 (JGJ79-2002) 膨胀土地区建筑技术规范 (GBJ112-87) 工程建设标准强制条文 (2009 版) 通风与空调工程施工质量验收规范 (GB50243-2002)立式圆筒型钢制焊接储罐施工及验收规范(GB50128-2005)工业金属管道施工及验收规范(GB50235-97)机械设备
13、安装工程施工及验收通用规范(GB50231-2009)压缩机、风机、泵安装工程施工及验收规范(GB50275-98)自动化仪表工程施工质量验收规范(GB50131-2007)建筑电气安装工程施工质量验收规范(GB50303-2002)建筑给水排水及采暖工程施工质量验收规范(GB50242-2002)通风与空调工程施工质量验收规范(GB50243-2002)建筑装饰装修工程施工质量验收规范(GB50210-2001)现场设备、工业管道焊接工程施工及验收规范(GB50236-98)电气装置安装工程起重机电气装置及验收规范(GB20256-1996)工业设备及管道绝热工程施工规范(GB50126-2
14、008)工业安装工程质量检验评定统一标准(GB50252-94)给水排水管道工程施工及验收规范(GB50268-2008)工业自动化仪表工程施工及验收规范(GB50093-2002)电气装置安装工程高压电器施工及验收规范(GBJ147-90)电气装置安装工程母线装置施工及验收规范(GBJ149-90)电气装置安装工程电缆线路施工及验收规范(GB50168-2006)电气装置安装工程接地装置施工及验收规范(GB50169-2006)电气装置安装工程旋转电机施工及验收规范(GB50170-2006)电气装置安装工程盘、柜及二次回路结线施工及验收规范(GB50171-92)电气装置安装工程低压电器施
15、工及验收规范(GB50254-96)伊士曼进口设备专利专用标准 3、施工组织设计。 二、工程概况本项目占地177.7亩,总建筑面积50750平方米;核准总投资106244.21万元,其中建筑工程费24302.49万元,安装工程费15429.91万元。本项目主要建/构筑物包括:A01-溶解车间,A02/A05-纺丝车间/原料成品仓库,A06-公用车间,A08/A09-维修车间/备品备件库,A10 生产控制楼,A11-35KV 变电站,A13-行政办公楼,A14-行政办公辅楼A16-门卫1,A17-门卫2 等多个建筑物单体;另外还有A03-丙酮回收区,A04-储罐区,A18-冷却塔/循环水池,A2
16、0-醋片卸料站,A21-管架,A23-精馏区,A26/A27-废水处理站/应急池等构筑物单体。结构体系除纺丝车间为钢结构,原料成品仓库为轻钢结构外,其它单体均为钢筋混凝土框架结构;抗震设防烈度为7 度;建筑抗震设防分类除纺丝车间,溶解车间,35KV 变电站为重点设防类(乙类),其它均为标准设防类(丙类),钢结构框架的纺丝车间抗震等级为三级,钢筋混凝土框架结构的溶解车间,35KV 变电站抗震等级为二级,其它均为三级。0.000 以上梁,板,柱等混凝土结构的环境类别为一类,0.000 以下的基础,墙,柱环境类别为二a 类。砌体结构施工质量控制等级为B 级。地基土质:2 层粘土自由膨胀率平均值为54
17、.3%,为弱膨胀性场地,胀缩等级为级。地基基础设计等级为丙级。建筑场地类别为类。 三、监理工作流程 1、准备阶段监理控制流程:学习与审查图纸、学习有关规范参加设计交底与图纸会审会议,签认会审会议纪要建设单位组织召开第一次工地例会,施工单位、监理等单位参加。会议作出:1、 建设单位对总监理工程师的授权;2、 建设单位介绍开工准备情况;3、 施工单位介绍施工准备情况;4、 监理单位介绍监理主要程序;5、 各方研究讨论施工准备情况,初步确定开工日期及准备事宜。6、 研究确定施工过程例会周期、主要参加人员、会议地点及主要议题。施工单位报送施工组织设计(方案)编制监理规划、监理实施细则、旁站监理方案(监
18、理单位)监理审批补充修改建设单位否是 2、单位工程质量控制流程:1、熟悉与掌握施工图,作好会审;2、编制监理规划;监理工程师编制监理细则;确定各工序质量控制目标和工序、工艺质量控制点;3、审核施工组织设计(方案),监督执行;4、监督承包单位的组织机构及质保体系有效运行;5、核查分包单位资质资料,在过程中监督执行;6、核定原材料、构配件及设备的质量,对影响工程质量、使用功能及观感材料、设备进行预控;7、现场巡视检查与旁站检查相结合,加强对工序施工过程的预控、检查,核查工程预检与隐检;8、签认分项、分部工程验收。项目监理部承包单位项目经理部工程竣工,自检合格,填报“工程竣工报验单”,申请竣工验收。
19、项目经理部监理工程师核查有关竣工的资料,总监理工程师组织监理人员进行内部验收。承包单位对内部验收发现的问题,进行整改后进行预验收。项目监理机构组织建设、承包、设计等单位进行竣工验收,如发现工程仍有缺陷,指令承包单位再次进行整改。整改完毕,签署竣工报验单、提出工程质量评估报告,并提供相关监理资料,交给建设单位(验收小组)。总监理工程师监理单位参加建设单位组织的竣工验收。对验收中提出的整改问题,监理机构应要求承包单位进行整改。工程符合要求,总监理工程师会同参加的各方签署竣工验收报告。建设单位(验收小组)3、工程预检、隐检、分项、分部工程验收工作流程:分项工程预检、隐检项目:1、施工单位自检合格;2
20、、报送工程报验单随附有关资料;3、专业监理工程师审核,现场检验。(施工单位人员、专业监理工程师负责)分项工程完成,自检合格,报送:1、已签认的预检、隐检表;2、分项工程质量验评记录;3、质量保证资料;4、分项工程报验申请表。(施工单位)进行分项工程验收和现场平行检验专业监理工程(地基验收,勘察、设计单位参加)原表上签认合格(监理工程师)分部工程完成,自验合格,报送:1、所属专项工程验收记录;2、分部工程验收记录;3、分部工程报验申请表。(施工单位)进行分部工程验收(施工单位项目经理约集)总监理工程师主持,专业监理工程师参加。基础、主体分部工程验收,建设、设计单位参加原表上签认合格(总监理工程师
21、)转入下道工序(施工单位)原表签批不合格(总监理工程师)整 改原表签批不合格(监理工程师)整 改4、工程测量定线签认工作流程:现场施工测量:1、建筑红线桩复测;2、水准基点桩引测及高程控制网施测;3、座标控制网(控制导线)施测;4、建筑轴线桩施测;5、建筑物、构筑物、设备、管道高程施测;6、沉降观测7、其他测量项目。(承包单位项目经理部),关报送测量方案,经批准后进行测量;将测量成果同时填报“测量定位放线报验申请表”,送监理机构(承包单位项目经理部)审核、复测、校核结果并签批(专业监理工程师)可进入下道工序(承包单位项目经理部)否进行内业审核及外业复测或校核(专业监理工程师)在原表上签认(主管
22、监理工程师)5、建筑材料、构配件、设备质量控制流程:1、选定建筑材料后,报送产品合格证、材质检验单等有关规定的资料;2、选定构配件厂后,报送生产厂家资质、产品合格证等有关资料;3、选定设备制造厂家后,报送生产厂家资质、产品说明书、产品合格证等有关文件资料。(施工单位)1、对送审的材料、资料进行审核,对实物外观检查认定;2、会同建设、施工、设计(必要时)对构配件、设备、材料生产厂家(必要时)进行考察认定;3、对产品是否影响结构安全、耐用性、使用功能、观感效果以及是否符合设计要求及违反现行法令、法规的规定,进行严格的审查和控制。(专业监理工程师)同 意签订采购合同,组织进货(施工单位)1、自检合格
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- dd 年产 万吨醋 纤维 丝束 项目 监理 细则
链接地址:https://www.31doc.com/p-2370020.html