6SImprovementProject.ppt
《6SImprovementProject.ppt》由会员分享,可在线阅读,更多相关《6SImprovementProject.ppt(17页珍藏版)》请在三一文库上搜索。
1、6S Improvement Project -5S walk done on Oct 27,Findings List,Analysis of Issues and Problems,Bill Zhao,Text in here,Text in here,Smart Ma,Tommy Zhao,Kitty Gu,Bob Li,PlanTeam Members,PlanIssues Quantity Breakdown,1. Analysis according to areas,2. Analysis according to 6S items,PlanActivity Schedule,P
2、lanStandard established,Different areas have relative 6 S definitions as standard,After,Before,Facility Parts,DOFacility Parts,Actions:,Switch Panels have been fixed or changed new The wall and peeling pipes have been painted the same color The ventilation has been sealed and no other entrance for d
3、irty Other facility need repaired,Equipment Parts,DOEquipment Parts,Actions:,Broken switch panel have been fixed or changed new The fixture block have been re-machined by suppliers We have remove all improvised twisted wire and inappropriate repairs The cables of equipments have been tidied up again
4、 All tape and residual glue have been removed Clean off the excess oil、grease and other dirty from machine,Before,After,Safety Parts,DOSafety Parts,Actions:,Switch Panels have been fixed or changed new Other safety item must be inspected regularly. such extinguisher、EXIT,Before,After,Floor Area,DOFl
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SImprovementProject
链接地址:https://www.31doc.com/p-3018741.html