暨南大学《项目管理》chapter 13 progress and performance measurement and evaluation.ppt
《暨南大学《项目管理》chapter 13 progress and performance measurement and evaluation.ppt》由会员分享,可在线阅读,更多相关《暨南大学《项目管理》chapter 13 progress and performance measurement and evaluation.ppt(71页珍藏版)》请在三一文库上搜索。
1、管理学院 School of Management,佟瑞 Edward Tong, MPM,MBA,2019/7/1,1,Edward TongCopyright reserved Jinan University,133,Where We Are Now,134,Structure of a Project Monitoring Information System,Creating a project monitoring system involves determining: What data to collect How, when, and who will collect th
2、e data How to analyze the data How to report current progress to management,135,Project Monitoring Information System,Information System Structure What data are collected? Current status of project (schedule and cost) Remaining cost to compete project Date that project will be complete Potential pro
3、blems to be addressed now Out-of-control activities requiring intervention Cost and/or schedule overruns and the reasons for them Forecast of overruns at time of project completion,136,Project Monitoring System (contd),Information System Structure (contd) Collecting data and analysis Who will collec
4、t project data? How will data be collected? When will the data be collected? Who will compile and analyze the data? Reports and reporting Who will receive the reports? How will the reports be transmitted? When will the reports be distributed?,137,Project Progress Report Format,Progress since last re
5、port Current status of project Schedule Cost Scope Cumulative trends Problems and issues since last report Actions and resolution of earlier problems New variances and problems identified Corrective action planned,138,The Project Control Process,Control The process of comparing actual performance ag
6、ainst plan to identify deviations, evaluate courses of action, and take appropriate corrective action. Project Control Steps Setting a baseline plan. Measuring progress and performance. Comparing plan against actual. Taking action. Tools Tracking and baseline Gantt charts Control charts,139,Baseline
7、 and Tracking Gantt Charts,FIGURE 13.1,1310,Project Schedule Control Chart,FIGURE 13.2,1311,Disparity Among Monitoring Systems,Time-Phase Baseline Plan Corrects the failure of most monitoring systems to connect a projects actual performance to its schedule and forecast budget. Systems that measure o
8、nly cost variances do not identify resource and project cost problems associated with falling behind or progressing ahead of schedule. Earned Value Cost/Schedule System An integrated project management system based on the earned value concept that uses a time-phased budget baseline to compare actual
9、 and planned schedule and costs.,1312,Glossary of Terms,TABLE 13.1,1313,Developing an Integrated Cost/Schedule System,Define the work using a WBS. Scope Work packages Deliverables Organization units Resources Budgets Develop work and resource schedules. Schedule resources to activities Time-phase wo
10、rk packages into a network,Develop a time-phased budget using work packages included in an activity. Accumulate budgets (PV). At the work package level, collect the actual costs for the work performed (AC). Multiply percent complete times original budget (EV). Compute the schedule variance (EV-PV) a
11、nd the cost variance (EV-AC).,1314,Project Management Information System Overview,FIGURE 13.3,1315,Development of Project Baselines,Purposes of a Baseline (PV) An anchor point for measuring performance A planned cost and expected schedule against which actual cost and schedule are measured. A basis
12、for cash flows and awarding progress payments. A summation of time-phased budgets (cost accounts as summed work packages) along a project timeline. What Costs Are Included in Baselines? Labor, equipment, materials, project direct overhead costs (DOC),1316,Development of Project Baselines (contd),Rul
13、es for Placing Costs in Baselines Costs are placed exactly as they are expected to be “earned” in order to track them to their point of origin. Percent Complete Rule Costs are periodically assigned to a baseline as units of work are completed over the duration of a work package.,1317,Methods of Vari
14、ance Analysis,Comparing Earned Value With the expected schedule value. With the actual costs. Assessing Status of a Project Required data elements Data Budgeted cost of the work scheduled (PV) Budgeted cost of the work completed (EV) Actual cost of the work completed (AC) Calculate schedule and cost
15、 variances A positive variance indicates a desirable condition, while a negative variance suggests problems or changes that have taken place.,1318,Methods of Variance Analysis,Cost Variance (CV) Indicates if the work accomplished using labor and materials costs more or less than was planned at any p
16、oint in the project. Schedule Variance (SV) Presents an overall assessment in dollar terms of the progress of all work packages in the project scheduled to date.,1319,Cost/Schedule Graph,FIGURE 13.4,1320,Earned-Value Review Exercise,FIGURE 13.5,1321,Developing A Status Report: A Hypothetical Example
17、,Assumptions Each cost account has only one work package, and each cost account will be represented as an activity on the network. The project network early start times will serve as the basis for assigning the baseline values. From the moment work an activity begins, some actual costs will be incur
18、red each period until the activity is completed.,1322,Work Breakdown Structure with Cost Accounts,FIGURE 13.6,1323,Digital Camera Prototype Project Baseline Gantt Chart,FIGURE 13.7,1324,Digital Camera Prototype Project Baseline Budget ($000),FIGURE 13.8,1325,Digital Camera Prototype Status Reports:
19、Periods 13,TABLE 13.2,1326,Digital Camera Prototype Status Reports: Periods 4 & 5,TABLE 13.2 (contd),1327,Digital Camera Prototype Status Reports: Periods 6 & 7,TABLE 13.2 (contd),1328,Digital Camera Prototype Summary Graph ($000),FIGURE 13.9,1329,Digital Camera Project-Tracking Gantt Chart Showing
20、StatusThrough Period 7,FIGURE 13.10,1330,Project Rollup End Period 7 ($000),FIGURE 13.11,1331,Indexes to Monitor Progress,Performance Indexes Cost Performance Index (CPI) Measures the cost efficiency of work accomplished to date. CPI = EV/AC Scheduling Performance Index (SPI) Measures scheduling eff
21、iciency SPI = EV/PV Percent Complete Indexes Indicates how much of the work accomplished represents of the total budgeted (BAC) and actual (AC) dollars to date. PCIB = EV/BAC PCIC = AC/EAC,1332,Interpretation of Indexes,TABLE 13.3,1333,Indexes Periods 17,FIGURE 13.12,1334,Additional Earned Value Rul
22、es,Rules applied to short-duration activities and/or small-cost activities 0/100 percent rule Assumes 100 % of budget credit is earned at once and only when the work is completed. 50/50 rule Allows for 50% of the value of the work package budget to be earned when it is started and 50% to be earned w
23、hen the package is completed. Percent complete with weighted monitoring gates Uses subjective estimated percent complete in combination with hard, tangible monitoring points.,1335,Forecasting Final Project Cost,Methods used to revise estimates of future project costs: EACre Allows experts in the fie
24、ld to change original baseline durations and costs because new information tells them the original estimates are not accurate. EACf Uses actual costs-to-date plus an efficiency index to project final costs in large projects where the original budget is unreliable.,1336,Forecasting Model: EACf,The eq
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 项目管理 暨南大学项目管理chapter 13 progress and performance measurement evaluation 暨南大学 项目 管理 chapter