07-30152563-DC.pdf
《07-30152563-DC.pdf》由会员分享,可在线阅读,更多相关《07-30152563-DC.pdf(30页珍藏版)》请在三一文库上搜索。
1、a Date: 23 November 2007 Origin: National Latest date for receipt of comments: 29 February 2008 Project no.: 2006/01768 Responsible committee: FSH/2 Fire extinguishers Interested committees: Title: Draft BS 5306-3 Fire extinguishing installations and equipment on premises Part 3: Code of practice fo
2、r the commissioning and maintenance of portable fire extinguishers Supersession information: If this document is published as a standard, it will supersede BS 5306-3:2003, which will be withdrawn. If you are aware of any other current standard that might be affected, please notify the committee secr
3、etary (contact details below). WARNING: THIS IS A DRAFT AND MUST NOT BE REGARDED OR USED AS A BRITISH STANDARD. THIS DRAFT IS NOT CURRENT BEYOND 29 February 2008. This draft is issued to allow comments from interested parties; all comments will be given consideration prior to publication. No acknowl
4、edgement will normally be sent. See overleaf for information on commenting. No copying is allowed, in any form, without prior written permission from BSI except as permitted under the Copyright, Designs and Patent Act 1988 or for circulation within a nominating organization for briefing purposes. El
5、ectronic circulation is limited to dissemination by e-mail within such an organization by committee members. Further copies of this draft may be purchased from BSI Customer Services, Tel: +44(0) 20 8996 9001 or email ordersbsi-. British, International and foreign standards are also available from BS
6、I Customer Services. Information on the co-operating organizations represented on the committees referenced above may be obtained from the responsible committee secretary. Cross-references The British Standards which implement International or European publications referred to in this draft may be f
7、ound via the British Standards Online Service on the BSI web site http:/www.bsi-. Direct tel: 0208 996 7061 Responsible Committee Secretary: Miss B Webb (BSI) E-mail: beverley.webbbsi- Draft for Public Comment Head Office 389 Chiswick High Road London W4 4AL Telephone: +44(0)20 8996 9000 Fax: +44(0)
8、20 8996 7001 Form 36 Version 7.0 DPC: 07/30152563 DC Licensed Copy: London South Bank University, London South Bank University, Thu Dec 20 02:39:44 GMT+00:00 2007, Uncontrolled Copy, (c) BSI b Introduction Your comments on this draft are welcome and will assist in the preparation of the consequent B
9、ritish Standard. If no comments are received to the contrary, this draft may be implemented unchanged as a British Standard. Submission The guidance given below is intended to ensure that all comments receive efficient and appropriate attention by the responsible BSI committee. Annotated drafts are
10、not acceptable and will be rejected. All comments must be submitted, preferably electronically, to the Content Developer: Sophie Watson E-mail: sophie.watsonbsi- Direct tel: 01473 407767 Comments should be compatible with Version 6.0 or Version 97 of Microsoft Word for Windows, if possible; otherwis
11、e comments in ASCII text format are acceptable. Any comments not submitted electronically should still adhere to these format requirements. All comments submitted should be presented as given in the example below. Further information on submitting comments and how to obtain a blank electronic versio
12、n of a comment form are available from the BSI web site at: http:/www.bsi- Template for comments and secretariat observations Date: xx/xx/200x Document: ISO/DIS xxxxx 1 2 (3) 4 5 (6) (7) MB Clause No./ Subclause No./ Annex (e.g. 3.1) Paragraph/ Figure/Table/ Note (e.g. Table 1) Type of com- ment Com
13、ment (justification for change) by the MB Proposed change by the MB Secretariat observations on each comment submitted 3.1 Definition 1 ed Definition is ambiguous and needs clarifying. Amend to read . so that the mains connector to which no connection . 6.4 Paragraph 2 te The use of the UV photomete
14、r as an alternative cannot be supported as serious problems have been encountered in its use in the UK. Delete reference to UV photometer. Microsoft and MS-DOS are registered trademarks, and Windows is a trademark of Microsoft Corporation. Licensed Copy: London South Bank University, London South Ba
15、nk University, Thu Dec 20 02:39:44 GMT+00:00 2007, Uncontrolled Copy, (c) BSI BS 5306-3:2008 2006-01768 DPC.doc 1 Fire extinguishing installations and equipment on premises Part 3: Code of practice for the commissioning and maintenance of portable fire extinguishers DRAFT FOR PUBLIC COMMENT Please n
16、ote that this is a draft and not a typeset document. Editorial comments are welcomed, but persons commenting on this draft are advised not to comment on detailed matters of typography and layout. Licensed Copy: London South Bank University, London South Bank University, Thu Dec 20 02:39:44 GMT+00:00
17、 2007, Uncontrolled Copy, (c) BSI BS 5306-3:2008 2006-01768 DPC.doc 2 Contents Foreword 3 1 Scope 5 2 Normative references 5 3 Terms and definitions 5 4 Process of commissioning 7 5 Visual inspection by the responsible person 8 6 Basic service, extended service and overhaul 8 7 Recharging of extingu
18、ishers 10 8 Replacement of components 11 9 Evaluation of fitness for service of extinguishers and actions to be taken 11 Annexes Annex A (normative) Training of competent persons 15 Annex B (normative) Commissioning service procedures 17 Annex C (normative) Safety precautions for extinguishers 20 An
19、nex D (normative) General basic service procedures 21 Annex E (normative) Extended service procedures 24 Annex F (normative) Overhaul, including periodic inspection and test procedures for CO2 and halon extinguishers 25 Annex G (informative) Halon extinguishers 26 Annex H (informative) Extinguishers
20、 manufactured in accordance with withdrawn British Standards 27 Bibliography 28 List of tables Table 1 Maximum maintenance intervals 9 Table B.1 Sequence of actions for commissioning service procedures for extinguishers 17 Table B.2 Commissioning service actions Initial operations 17 Table D.1 Seque
21、nce of actions for basic service procedures for extinguishers 21 Table D.2 Basic service actions Initial operations 21 Table E.1 Extended service procedures 24 Table F.1 Overhaul procedures for carbon dioxide (CO2) extinguishers 25 Table F.2 Overhaul procedures for halon extinguishers (see Annex G)
22、25 Licensed Copy: London South Bank University, London South Bank University, Thu Dec 20 02:39:44 GMT+00:00 2007, Uncontrolled Copy, (c) BSI BS 5306-3:2008 2006-01768 DPC.doc 3 Foreword Publishing information This part of BS 5306 is published by BSI and came into effect on XX Month 200X. It was prep
23、ared by Technical Committee FSH/2, Fire extinguishers. A list of organizations represented on this committee can be obtained on request to its secretary. Supersession This part of BS 5306 supersedes BS 5306-3:2003, which is withdrawn. Relationship with other publications The other parts of BS 5306 p
24、ublished are as follows: Part 0: Guide for selection of installed systems and other fire extinguishing equipment; Part 1: Hose reels and foam inlets; Part 2: Specification for sprinkler systems; Part 4: Specification for carbon dioxide systems; Part 5: Halon systems: Section 5.1: Specification for H
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 07 30152563 DC
链接地址:https://www.31doc.com/p-3726131.html