07-30173914-DC.pdf
《07-30173914-DC.pdf》由会员分享,可在线阅读,更多相关《07-30173914-DC.pdf(6页珍藏版)》请在三一文库上搜索。
1、a Date: 16 November 2007 Origin: European Latest date for receipt of comments: 31 January 2008 Project no.: 2007/02473 Responsible committee: FSH/17/4 Pumps Interested committees: Title: DRAFT EN 14710-2/AMD 1 Fire-fighting pumps - Fire-fighting centrifugal pumps without primer Part 2: Verification
2、of general and safety requirements Supersession information: If this document is published as a standard, the UK implementation of it will supersede BSEN14710-2 : 2005 and partially supersede. NONE If you are aware of a current national standard which may be affected, please notify the secretary (co
3、ntact details below). WARNING: THIS IS A DRAFT AND MUST NOT BE REGARDED OR USED AS A BRITISH STANDARD. THIS DRAFT IS NOT CURRENT BEYOND 31 January 2008. This draft is issued to allow comments from interested parties; all comments will be given consideration prior to publication. No acknowledgement w
4、ill normally be sent. See overleaf for information on commenting. No copying is allowed, in any form, without prior written permission from BSI except as permitted under the Copyright, Designs and Patent Act 1988 or for circulation within a nominating organization for briefing purposes. Electronic c
5、irculation is limited to dissemination by e-mail within such an organization by committee members. Further copies of this draft may be purchased from BSI Customer Services, Tel: +44(0) 20 8996 9001 or email ordersbsi-. British, International and foreign standards are also available from BSI Customer
6、 Services. Information on the co-operating organizations represented on the committees referenced above may be obtained from the responsible committee secretary. Cross-references The British Standards which implement International or European publications referred to in this draft may be found via t
7、he British Standards Online Service on the BSI web site http:/www.bsi-. Direct tel: 020 8996 7195 Responsible Committee Secretary: Mrs S Revell (BSI) E-mail: susan.revellbsi- Draft for Public Comment Head Office 389 Chiswick High Road London W4 4AL Telephone: +44(0)20 8996 9000 Fax: +44(0)20 8996 70
8、01 Form 36 Version 7.0 DPC: 07/30173914 DC Licensed Copy: London South Bank University, London South Bank University, Thu Dec 20 02:43:25 GMT+00:00 2007, Uncontrolled Copy, (c) BSI b Introduction This draft standard is based on European discussions in which the UK has taken an active part. Your comm
9、ents on this draft are welcome and will assist in the preparation of the consequent British Standard. If no comments are received to the contrary, then the UK will approve this draft and implement it as a British Standard. Comment is particularly welcome on national, legislative or similar deviation
10、s that may be necessary. Even if this draft standard is not approved by the UK, if it receives the necessary support in Europe, the UK will be obliged to publish the official English Language text unchanged as a British Standard and to withdraw any conflicting standard. UK Vote Please indicate wheth
11、er you consider the UK should submit a negative (with reasons) or positive vote on this draft. Submission The guidance given below is intended to ensure that all comments receive efficient and appropriate attention by the responsible BSI committee. Annotated drafts are not acceptable and will be rej
12、ected. All comments must be submitted, preferably electronically, to the Responsible Committee Secretary at the address given on the front cover. Comments should be compatible with Version 6.0 or Version 97 of Microsoft Word for Windows, if possible; otherwise comments in ASCII text format are accep
13、table. Any comments not submitted electronically should still adhere to these format requirements. All comments submitted should be presented as given in the example below. Further information on submitting comments and how to obtain a blank electronic version of a comment form are available from th
14、e BSI web site at: http:/www.bsi- Template for comments and secretariat observations Date: xx/xx/200x Document: ISO/DIS xxxxx 1 2 (3) 4 5 (6) (7) MB Clause No./ Subclause No./ Annex (e.g. 3.1) Paragraph/ Figure/Table/ Note (e.g. Table 1) Type of com- ment Comment (justification for change) by the MB
15、 Proposed change by the MB Secretariat observations on each comment submitted 3.1 Definition 1 ed Definition is ambiguous and needs clarifying. Amend to read . so that the mains connector to which no connection . 6.4 Paragraph 2 te The use of the UV photometer as an alternative cannot be supported a
16、s serious problems have been encountered in its use in the UK. Delete reference to UV photometer. Microsoft and MS-DOS are registered trademarks, and Windows is a trademark of Microsoft Corporation. Licensed Copy: London South Bank University, London South Bank University, Thu Dec 20 02:43:25 GMT+00
17、:00 2007, Uncontrolled Copy, (c) BSI EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM FINAL DRAFT EN 14710-2:2005 prA1 October 2007 ICS 13.220.10 English Version Fire-fighting pumps - Fire-fighting centrifugal pumps without primer - Part 2: Verification of general and safety requirements Pompes usa
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 07 30173914 DC
链接地址:https://www.31doc.com/p-3726306.html