ABS-63-NOTICE-1-2006.pdf
《ABS-63-NOTICE-1-2006.pdf》由会员分享,可在线阅读,更多相关《ABS-63-NOTICE-1-2006.pdf(2页珍藏版)》请在三一文库上搜索。
1、 ABS GUIDE FOR BUILDING AND CLASSING FACILITIES ON OFFSHORE INSTALLATIONS . 2000 1 GUIDE FOR BUILDING AND CLASSING FACILITIES ON OFFSHORE INSTALLATIONS APRIL 2004 NOTICE NO. 1 June 2006 The following Changes become EFFECTIVE AS OF 1 JUNE 2006. (See http:/www.eagle.org/rules/downloads.html for the co
2、nsolidated version of the Guide for Building and Classing Facilities on Offshore Installations 2000, updated in May 2006, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date
3、for construction, unless otherwise noted. (See 1-4/9.3.) CHAPTER 3 FLOATING INSTALLATIONS SECTION 3 HYDROCARBON PRODUCTION AND PROCESS SYSTEMS 13 Spill Containment, Open and Closed Drain Systems 13.1 Spill Containment 13.1.2 Containment (1 June 2006) (Revise first paragraph and delete second paragra
4、ph as follows.) Spill containment is to utilize curbing or drip edges at deck level, recessed drip pans, containment by floor gutters, firewalls or protective walls, or equivalent means to prevent spread of discharged liquids to other areas and spillover to lower levels. Where equipment is protected
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS 63 NOTICE 2006
链接地址:https://www.31doc.com/p-3728705.html