ABS-98-CORR-2006.pdf
《ABS-98-CORR-2006.pdf》由会员分享,可在线阅读,更多相关《ABS-98-CORR-2006.pdf(2页珍藏版)》请在三一文库上搜索。
1、 ABS GUIDE FOR BUILDING AND CLASSING PASSENGER VESSELS . 2001 1 GUIDE FOR BUILDING AND CLASSING PASSENGER VESSELS 2001 CORRIGENDA/EDITORIALS 4 June 2001 CORRIGENDA/EDITORIALS 1 August 2001 CORRIGENDA/EDITORIALS 1 April 2003 CORRIGENDA/EDITORIALS 16 January 2004 CORRIGENDA/EDITORIALS 24 February 2006
2、 Page No. Paragraph Comments Section 2 Hull Structure 14 2/3.1 In third paragraph, reference “2/1.7” to read “2/3.7”. 38 2/11.3.2 In definition of h, “lower edge of plate” to read “middle of l”. 39 2/11.3.4 Revise second sentence of second paragraph to read “In calculating the sectional area of the
3、vertical web, the area of the attached plate is in general not to be included.”. 43 2/11.23 Subparagraph numbers “11.27.1”, “11.27.2” and 11.27.3” to read “11.23.1”, “11.23.2” and “11.23.3”, respectively. Section 5 Design Conditions 93 5/1.7.4 Replace entire Subparagraph 5/1.7.4 with the following:
4、“1.7.4 Dead Ship Start Means are to be provided, such as starting batteries, compressed air or emergency generator, to bring the machinery into operation from a “dead ship” condition (e.g., a condition under which the main propulsion plant, boilers and auxiliaries are not in operation due to the abs
5、ence of the main source of power). Note: For the purpose of this requirement, “dead ship” and “blackout” are both to be understood to mean the same.” 99 5/11.5.4(a)i) US units equation for dm to read “ 2500 )( 1 b m DBL d + += in.”. 100 5/11.5.4(a)iv)In second to last line of first paragraph, “need
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS 98 CORR 2006
链接地址:https://www.31doc.com/p-3729145.html