《BS-EN-181103-1998.pdf》由会员分享,可在线阅读,更多相关《BS-EN-181103-1998.pdf(34页珍藏版)》请在三一文库上搜索。
1、BRITISH STANDARD BS EN 181103:1998 Harmonized system of quality assessment for electronic components Blank detail specification: Fibre optic branching devices Type: Non wavelength selective transmissive star for telecommunication application The European Standard EN 181103:1997 has the status of a B
2、ritish Standard ICS 33.180.20 Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS EN 181103:1998 This British Standard, having been prepared under the direction of the Electrotechnical Sector Board, was published under the authority of the St
3、andards Board and comes into effect on 15 April 1998 BSI 04-1999 ISBN 0 580 29390 4 National foreword This British Standard is the English language version of EN 181103:1997 published by the European Electronic Components Committee (CECC) of the European Committee for Electrotechnical Standardizatio
4、n (CENELEC). The UK participation in its preparation was entrusted by Technical Committee EPL/86, Fibre optics, to Subcommittee EPL/86/2, Interconnecting devices and passive components, which has the responsibility to: aid enquirers to understand the text; present to the responsible international/Eu
5、ropean committee any enquiries on the interpretation, or proposals for change, and keep the UK interests informed; monitor related international and European developments and promulgate them in the UK. A list of organizations represented on this subcommittee can be obtained on request to its secreta
6、ry. Cross-references The British Standards which implement international or European publications referred to in this document may be found in the BSI Standards Catalogue under the section entitled “International Standards Correspondence Index”, or by using the “Find” facility of the BSI Standards E
7、lectronic Catalogue. A British Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages Thi
8、s document comprises a front cover, an inside front cover, pages i and ii, the EN title page, pages 2 to 29 and a back cover. This standard has been updated (see copyright date) and may have had amendments incorporated. This will be indicated in the amendment table on the inside front cover. Amendme
9、nts issued since publication Amd. No.DateComments Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS EN 181103:1998 BSI 04-1999i Contents Page National forewordInside front cover Foreword2 Text of EN 1811033 Licensed Copy: sheffieldun sheffi
10、eldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI ii blank Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 181103 December 1997 ICS 33.180.20 English version Blank
11、Detail Specification: Fibre optic branching devices Type: Non wavelength selective transmissive star for telecommunication application Spcification particulire cadre: Dispositifs de couplage fibres optiques Type; Non slectif en longueur donde, transmission en toile Vordruck fr Bauartspezifikation: L
12、ichtwellenleiter-Verzweiger Bauart: Nicht-wellenlngenselektiver Sternbertrager fr Anwendungen bei Nachrichtenbertragung This European Standard was approved by CENELEC on 1997-10-01. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for givin
13、g this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any CENELEC member. This European Standard exists in three official ve
14、rsions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the same status as the official versions. CENELEC members are the national electrotechnical committees
15、of Austria, Belgium, Czech Republic, Denmark, Finland, France, Germany, Greece, Iceland, Ireland, Italy, Luxembourg, Netherlands, Norway, Portugal, Spain, Sweden, Switzerland and United Kingdom. CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotec
16、hnique Europisches Komitee fr Elektrotechnische Normung Central Secretariat: rue de Stassart 35, B-1050 Brussels 1997 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 181103:1997 E Licensed Copy: sheffieldun sheffieldun, na, Sun Oct
17、29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 181103:1997 BSI 04-1999 2 Foreword This European Standard was prepared by the Technical Committee CENELEC/TC CECC SC 86BXB, Fibre optic passive components. The text of the draft was submitted to the Unique Acceptance Procedure and was approve
18、d by CENELEC as EN 181103 on 1997-10-01. The following dates were fixed: Contents Page Foreword2 1Introduction3 2Qualification approval3 3Quality conformance inspection3 4Preparation of detail specifications (DS)3 latest date by which the EN has to be implemented at national level by publication of
19、an identical national standard or by endorsement(dop) 1998-09-01 latest date by which the national standards conflicting with the EN have to be withdrawn(dow) 1998-09-01 Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 181103:1997 BSI 04-1
20、9993 1 Introduction This specification is a BDS for Fibre Optic Branching Devices of the “Non wavelength selective transmissive star” type. This includes instructions for preparing a DS. 2 Qualification approval 2.1 Procedure The DS shall state the qualification approval procedure to be used in acco
21、rdance with clause 3.3 of EN 181000. 2.2 Test schedule and performance requirements The test schedule for qualification by the fixed sample procedure shall be given in Table 1 of the DS (see clauses 2.2, 4.5 and 4.6 of EN 181000). 3 Quality conformance inspection 3.1 Lot-by-lot inspection The test s
22、chedule for lot-by-lot inspection (groups A and B) shall be given in Table 2 of the DS (see clauses 2.2, 4.5 and 4.6 of EN 181000). 3.2 Periodic inspection The test schedule for periodic inspection (groups C and D) shall be given in Table 3 of the DS (see clauses 2.2, 4.5 and 4.6 of EN 181000) 4 Pre
23、paration of detail specifications (DS) Each BDS is published separately as a pro format document, with numbered spaces provided for entering the information necessary to create a DS. If the spaces provided are too small, then the information shall be provided on additional sheets forming part of the
24、 completed DS. Instructions for filling in the numbered spaces in a BDS are given below: 1) The name of the ONH under whose authority the DS is published and, if applicable, the organization from whom the DS is available. 2) The CECC symbol and the number allotted to the DS by the CECC General Secre
25、tariat. 3) The number and issue number of the CECC GS; also the national reference(s), if different. 4) If different from the CECC number, the national number of the DS, date of issue and any further information required by the national system, together with any amendment numbers. 5) A brief descrip
26、tion of the component or range of components. 6) The level of quality assessment (A, B, C or X), sampling procedure (fixed quantity or lot-by-lot) and the climatic category. For 5) and 6) the text to be given in the DS shall be suitable for an entry in CECC 00 200 (Register of Approvals) and CECC 00
27、 300 (Register of National Documents). 7) An outline drawing with main dimensions which are of importance for interchangeability, and/or reference to the appropriate national or international documents for outlines. Alternatively, this drawing may be given in an annex to the DS, but 7) shall always
28、contain an illustration of the general outer appearance of the component. If an existing drawing from an IEC publication, or similar source, is used in a CECC specification, then it can be either first or third angle projection, but the appropriate symbol shall be shown on the drawing: The symbol in
29、 the BDS may be converted to indicate either 1st or 3rd angle, by deleting the inappropriate part of the drawing. Alternative outline dimensions or tolerance limits of any variants shall be shown, and may be listed in the form of a table alongside the drawing. 8) A list of variants and their identif
30、ying features covered by the DS. Enter the identification number. “AYY” for each variant of each component (see clause 2.7.1 of EN 181000). Assign a column in the table for each variant feature. For example, cable type, housing, orientation of ports, means of mounting etc. Instruction: max. values i
31、n dB for insertion losses between conduction ports; min. values in dB for return losses; min. values in dB for insertion losses between isolated ports. 9) Supplementary information Enter the supplementary information with respect to marking of the component, marking and contents of package, ordering
32、 information, related documents, certified test records and structural similarity. 1st angle projection3rd angle projection Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 181103:1997 4 BSI 04-1999 10) Fixed sample qualification approval
33、test schedule Table 1 shall give the required measurements and tests for qualification by fixed-sample procedure. If qualification by lot-by-lot and periodic procedure is specified, insert “NOT APPLICABLE” in Table 1. If measurements or tests are specified for which no basic procedure is available,
34、or which do not appear in the GS EN 181000, each procedure shall be clearly diecribed in an individual annex to the DS. The format and the minimum mandatory test sequence shall be the same as specified in the GS. 11) Lot-by-lot inspection test schedule When completed, Table 2 shall give the required
35、 measurements and tests for qualification by lot-by-lot procedure. One or more assessment level(s) shall be given in Table 2. When differing from the preferred levels of the GS (see clause 2.1.5 of EN 181000) the IL and AQL shall be entered and the assessment level(s) titled (X, Y.). If measurements
36、 or tests are specified for which no basic procedure is available, or which do not appear in the GS, EN 181000, each procedure shall be clearly described in an individual annex to the DS. The format and the minimum mandatory test sequence shall be the same as specified in the GS. 12) Periodic C and
37、D testing procedure Table 3 shall give the required measurements and tests for groups C and D periodic tests. One or more assessment level(s) shall be given in Table 3. When differing from the preferred levels of the GS (see clause 2.1.5 of EN 181000) the IL, AQL, p, n, c and t shall be entered and
38、the assessment level(s) titled (X,Y.). 13) Details, measurements, and performance requirements Table 4 shall list the details of each tests requirements. It shall be noted that the mandatory tests have been given as a minimum. Others tests shall be given in the same manner. To fill in the detail of
39、the test the values shall be taken out from the relevant I ETS document Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 181103:1997 BSI 04-19995 Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled
40、Copy, (c) BSI EN 181103:1997 6 BSI 04-1999 NOTEValues in dB Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 181103:1997 BSI 04-19997 (9) SUPPLEMENTARY INFORMATION Marking of the component (add component marking requirements in accordance
41、with 2.7.2 of EN 181000, as applicable): Marking and contents of package (add component package marking requirements in accordance with 2.7.3 of EN 181000, as applicable): Ordering information (add ordering information, as applicable): Related documents (add additional related documents if not inclu
42、ded in EN 181000): Certified records of released lots (indicate whether a certificate is required): Structural similarity (add the boundary limits in accordance with 3.2 of EN 181000): Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 18110
43、3:1997 8 BSI 04-1999 (10) Table 1 FIXED SAMPLE QUALIFICATION APPROVAL TEST SCHEDULE Test sequence (Note) EN 181000 Clause Sample size Group 0 Group 1 Group 2 Group 3 Further groups if applicable NOTEFor details, measurements and performance requirements see Table 4 Licensed Copy: sheffieldun sheffie
44、ldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 181103:1997 BSI 04-19999 (11) Table 2 LOT-BY-LOT INSPECTION TEST SCHEDULE (GROUPS A AND B) Test Sequence (Note 1) EN 181000 Clause Assessment Level (Note 2) Group A Group B NOTE 1For details, measurements and performance req
45、uirements see Table 4 NOTE 2See clause 2.1.5 of EN 181000. Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 181103:1997 10 BSI 04-1999 (12) Table 3 PERIODIC INSPECTION TEST SCHEDULE (GROUPS C AND D) Test Sequence (Note 1) EN 181000 Clause
46、Assessment Level (Note 2) Sample size Group C0 Group C1 Group C2 Further groups if applicable Group D0 Group D1 Group D2 Group D3 Further groups if applicable NOTE 1For details, measurements and performance requirements see Table 4 NOTE 2See clause 2.1.5 of EN 181000. Licensed Copy: sheffieldun shef
47、fieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 181103:1997 BSI 04-199911 (13) Table 4 (continued) DETAILS, MEASUREMENTS AND PERFORMANCE REQUIREMENTS Visual inspection: In accordance with EN 181000 clause 4.5.1 Details: Configuration Housing and orientation of the port
48、s Marking Preconditioning procedure Recovery procedure Deviations Requirements: The configuration, the connector type if any, the orientation of the ports shall be specified in (5); workmanship shall be in accordance with clause 2.4.2 of EN 181000; marking shall be in accordance with the requirement
49、s in (9). Licensed Copy: sheffieldun sheffieldun, na, Sun Oct 29 10:47:43 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EN 181103:1997 12 BSI 04-1999 (13) Table 4 (continued) DETAILS, MEASUREMENTS AND PERFORMANCE REQUIREMENTS Dimensions and mass: In accordance with EN 181000 clause 4.5.2 Details: Size dimensions (mm) Mass (g) Size measurement method (if required) Mass measurement method Preconditioning procedure Recovery procedure Deviations Requirements: All size dimensions and mass shall be in accordan
链接地址:https://www.31doc.com/p-3741080.html