1、 VND.GM 998Y006-ENGL 2000 9006379 0014b3b LT9 Material Specification Paint 9984006 Iron Phosphate 1 Scope This specification covers the material and perfor- mance requirements of iron phosphate coatings. This coating is intended to provide a crystalline, corrosion resistant, paint adhesion promoting
2、 surface on bare steel. 1 . 1 Material Description. Subparagraphs were not applicable. 1 . 2 Cross-Reference of Replaced Specifications. Subparagraphs were not applicable. 1 . 3 Symbol. Not applicable. 1 . 4 Typical Application. Not applicable. 1 . 5 Remarks. Not applicable. 2 References Note: Only
3、the latest approved standards are appli- cable unless otherwise specified. 2 . 1 Normative. None. 2 . 2 GM. GM4386M G M W3059 GM4389M 9984303 3 Requirements The requirements listed in GM4386M for Type IV sys- tem shall be met. 3 . 1 Requirements on Delivery. 3 . 1 . 1 Chemical Requirements. Effectiv
4、e model year 2003, all iron phosphated components, both new and carryover, must use a phosphate sealer approved to 9984303. 3 . 1 . 2 Mechanical Requirements. Not applicable. 3 . 1 -3 Physical Requirements. Not applicable. 3 . 1 -4 Additional Requirements. Not applicable. 3 . 2 Processing Requiremen
5、ts. Subparagraphs were not applicable. 3 . 3 Performance Requirements. Subparagraphs were not applicable. 3 . 4 Requirements on other Stages during Life Cy- cle. Subparagraphs were not applicable. 4 Manufacturing Process Not applicable. 5 Rules and Regulations 5 . 1 Legal Regulations. For use of thi
6、s material the valid laws and other regulations and recommenda- tions in the country of usage shall be followed. 5.2 Language. In the event of any conflict between the English and domestic language regarding this document, the English language will take prece- dence. 5.3 Restricted and Reportable Su
7、bstances for Parts (GMW3059). All materials supplied to this specification must comply with the requirements of GMW3059 Restricted and Reportable Substances for Parts. 5.4 Inspection and Rejection. All shipments of ma- terials or parts under contract or purchase order man- ufactured to this specific
8、ation shall be equivalent in every respect to the initial samples approved by engi- neering. There shall be no changes in the formulation or manufacturing process permitted without prior no- tification and approval by engineering. Lack of notifi- cation by the supplier constitutes grounds for reject
9、ion of any shipment. While samples may be taken from incoming shipments and checked for conformance to this specification, the supplier shall accept the respon- sibility for incoming shipments meeting this specifi- cation without dependence upon the purchasers in- spection. In addition, the supplier
10、 shall be responsi- ble for submitting a Certificate of Analysis with each batch of material arriving at a plant. This document shall be prepared and provide data in accordance with the requirements detailed in GM4389M. 5.5 Initial Source Approval. No shipments shall be made by any supplier until re
11、presentative initial pro- duction samples have been approved by Materials Engineering as meeting the requirements of this spec- ification. Shipment receipt and certification require- ments will vary among receiving locations. 8 CoDvnaht Februaw 2000 General Motors Corooralion All Riahts Resewed Orig
12、inating Department: North American Engineering Standards, Records and Documentation February 2000 Page 1 of 2 Copyright General Motors North America Provided by IHS under license with GM Licensee=IHS Employees/1111111001, User=Japan, IHS Not for Resale, 06/23/2008 21:32:34 MDTNo reproduction or netw
13、orking permitted without license from IHS -,-,- VND-Gfl 9984006-ENGL 2000 900b379 O034637 035 I I I 9984006 GM ENGINEERING STANDARDS I 5.6 Material Safety Data Sheets. Completed copies of the Material Safety Data Sheet, meeting GM infor- mation requirements, must be submitted with any new submission
14、s or whenever a composition change has occurred. 6 Approved Sources Engineering qualification of an approved source is re- quired for this specification. Only sources listed in the GM Materials File under this specification num- ber have been qualified by engineering as meeting the requirements of t
15、his specification. Sources are available through the on-line MATSPC System. 6.1 Source Shipment Responsibility. It will be the responsibility of the supplier to insure that the material is not exposed to temperatures during shipment which would cause the material to fail to meet any of the requireme
16、nts of this specification. 7 Coding System This material specification shall be referenced in other documents, drawings, U S , CTS, etc. as follows: 9984006. 8 Release and Revisions 8.1 Release. This specification was initially issued by Fisher Body in May 1976. 8 . 2 Revisions. IRev.( Date 1 Descri
17、ption (Org.) I I B I JAN 1990 I Complete Revision (Paint Commit- I II C FEB2000 Revised 2. Added 3.1 and 5.3. Il I (Paint Committee) O Copyright February 2000 General Motors Corporation All Rights Reserved Page 2 of 2 February 2000 Copyright General Motors North America Provided by IHS under license with GM Licensee=IHS Employees/1111111001, User=Japan, IHS Not for Resale, 06/23/2008 21:32:34 MDTNo reproduction or networking permitted without license from IHS -,-,-