1、工程施工应急预案 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sl
2、eeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth
3、of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the ins
4、ulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with
5、 tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric . Project name
6、: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this
7、 this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support syst
8、em design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pip
9、e od shall not is less than 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, betwee
10、n columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 龙门架安全使用应急预案 一、应急预案的方针与原则 更好地适应法律和
11、经济活动的要求; 给企业员工的工作和施工场区周围居民提 供更好更安全的环境 ; 保证各种应急资源处于良好的备战状态; 指导应急行动按计划 有序地进行 ; 防止因应急行动组织不力或现场救援工作的无序和混乱而延误事故的 应急救援 ; 有效地避免或降低人员伤亡和财产损失; 帮助实现应急行动的快速、有 序、高效 ; 充分体现应急救援的“应急精神”。坚持“安全第一,预防为主”、 “保护人员安全优先,保护环境优先”的方针,贯彻“常备不懈、统一指挥、高效 协调、持续改进”的原则。 二、应急策划 ( 一) 工程概况 文萃满庭芳二期 1#楼工程是由漯河市恒信置业有限公司投资兴建的住宅及公寓 楼,位于漯河市淞江路
12、与舟山路交叉口西南角,本工程建筑面积为15000平方米, 平面结构呈一字形。本工程由河南省城乡建筑设计有限公司设计。河南省兴豫建 设管理有限公司进行监理,漯河市滨河建筑装饰有限公司承建,本工程抗震设防烈 度六度,抗震等级三级,现场施工使用塔式起重机一台,龙门架两座,用以提升 建筑材料。 ( 二) 、应急预案工作流程图 根据本工程的特点及施工工艺的实际情况,认真的组织了对危险源和环境因素 的识别和评价,特制定本项目发生紧急情况或事故的应急措施,开展应急知识教育 和应急演练,提高现场操作人员应急能力,减少突发事件造成的损害和不良环境影 响。其应急准备和响应工作程序见下图: temporary co
13、nstruction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm
14、to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m
15、, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated ru
16、bber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is
17、strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric . Project name: 5-5-2 sequential or
18、der of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engi
19、neering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation
20、, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is les
21、s than 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the leve
22、l of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires th
23、e implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reason
24、able matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height t
25、o the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, ligh
26、ting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-volta
27、ge lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric . Project name: 5-5-2 sequential order of the subsidence observation observat
28、ion point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-te
29、st State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qi
30、an should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than 48x3.5 of pipe, no serious rust, an
31、d crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal suppor
32、t, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 图 1 应急准备和响应工作程序图 危险源及环境因素辩识、评价 编制应急预案 成立抢险领导小组 组建抢险队、救护车 进行评审、修订配备应急物资、设备 发生 未发生 应急知识教育培训实施应急预案定
33、期评审 ( 三) 重大事故 ( 危险) 发展过程及分析 1 塔吊、龙门架作业中突然安全限位装置失控,发生撞击护栏及相邻塔吊或坠 物,或违反安全规程操作,造成重大事故( 如倾倒、断臂 ); 2 基坑边坡在外力荷载作用下滑坡倒塌。 3 液压升降式脚手架发生部分或整体倒塌及搭拆作业发生人员伤亡事故。 4 自然灾害 (如雷电、沙尘暴、地震强风、强降雨、暴风雪等)对设施的严重损 坏。 5 塔吊、龙门架安装和拆除过程中发生的人员伤亡事故。 proof, Sun protection measures. Piling piling machinery, machinery,-proof, shock-k d
34、ate 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosionuirements. Checsheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade req-good, shell the zero connection protection effective; Motor load lines s
35、hall be YHS waterproof rubber-le insulationer cabh button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump powtion date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches pusI
36、nspecr supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. ective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a powe, prottion devices complete, secondary no loa
37、d pressure or leakage protection device effectively; Reliable rain protection measuresals, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protectype ramming hand should be wrapped on insulating materi-nes, the operator should wear in
38、sulated shoes, wear insulated gloves; Frogall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lidevice shheld electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective
39、 -zero connection protection is good. Shield inspection date 4 hand- switches; Leakage protection sensitive effective groundway push -ety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one, grounded or the zero connection protection
40、meets the requirements. Inspection date 3 chain saws (circular saws), guard, safback safety device; Leakage protection sensitive and effective-blade with protective hand guard, rolling plane equipped with springate 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor
41、 use, to shed rain operation; Plane ion ddevices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspect brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safetyches, n r
42、equires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutd solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Raier body with mortar installation smooth an16 organiza
43、tion name project name Inspector serial number check check check the comments on the contents of the project 1 mix-ot be located in the same room. Wooden long according to the design you want to . An 5bar 50mm, shall n 2 temporary construction organization design requires the implementation of the o
44、verall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited
45、 the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you
46、 must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed
47、wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed
48、to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric . Project name: 5-5-2 sequential order of the subsidence observation observation point number support
49、(supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for se